Request for Information (RFI): National Park Service (NPS) Rehabilitate Marina Bulkheads at Flamingo
ID: W912EP24Z0047Type: Special Notice
Overview

Buyer

DEPT OF DEFENSEDEPT OF THE ARMYW074 ENDIST JACKSNVLLEJACKSONVILLE, FL, 32207-0019, USA

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

CONSTRUCTION OF OTHER NON-BUILDING FACILITIES (Y1PZ)
Timeline
    Description

    The U.S. Army Corps of Engineers, Jacksonville District, is seeking information from the construction community regarding the rehabilitation of marina bulkheads at Flamingo Marina within Everglades National Park, Florida. This Request for Information (RFI) aims to gather insights on technical approaches, including sheet pile installation methods, environmental compliance, and the potential use of Project Labor Agreements (PLAs) for this significant construction project, which is estimated to cost between $25 million and $100 million. The project is crucial for maintaining the structural integrity of the marina, which has been compromised due to corrosion and other environmental factors, and it emphasizes the importance of minimizing ecological impact during construction. Interested parties are encouraged to submit their responses by October 4, 2024, and can direct inquiries to William Wallace at william.j.wallace@usace.army.mil or Nicole Batista-Cruz at Nicole.M.Batista-Cruz@usace.army.mil.

    Files
    Title
    Posted
    The document outlines the "Flamingo Marina Bulkhead Rehabilitation" project within Everglades National Park, Monroe County, Florida, managed by the U.S. Army Corps of Engineers, Jacksonville District. The project involves the rehabilitation of bulkheads at the Flamingo Marina, focusing on site planning, demolition, and structural improvements necessary for maintaining the integrity and functionality of the marina. The documentation includes a detailed list of drawings, specifications, and survey data relevant to the project, along with procedural plans for construction. The project emphasizes adherence to safety regulations and environmental considerations, underscoring compliance with federal standards. Additionally, comprehensive survey notes and alignment data are provided, indicating the project's scope and intended outcomes. This initiative aims to enhance the marina's infrastructure, thus improving functionality while preserving the natural environment of the Everglades.
    The document outlines the solicitation for the Flamingo Marina Bulkhead Rehabilitation project within Everglades National Park, Florida, managed by the U.S. Army Corps of Engineers. It details the project's scope, which includes removing existing structures and installing new steel sheet pile bulkheads with concrete caps, as well as mechanical, plumbing, and electrical upgrades to improve the marina's facilities. The project is organized into four phases, focusing on different marina basins: Whitewater Bay, Florida Bay, Visitor Center Bay, and Maintenance Marina Bay. Key components involve environmental monitoring, erosion protection, and restoring disturbed areas. The document also specifies line items for bidding and pricing, highlighting the need for detailed cost estimates across various construction activities. Safety requirements and compliance with environmental regulations are emphasized throughout the project. The overall intent of the document is to solicit bids from qualified contractors while ensuring adherence to stringent safety and environmental standards, reflecting the government’s commitment to sustainable development in protected areas. This aligns with federal guidelines for public works projects, ensuring proper contractor engagement and project transparency.
    The document outlines a comprehensive demolition plan for the Flamingo Marina Bulkhead Rehabilitation project within Everglades National Park, Monroe County, Florida. It details the removal and disposal of various structures, including existing docks, ramps, benches, and concrete elements, while ensuring the preservation of specific items for future reinstallation. The plan emphasizes the need for careful site management, including the installation of silt barriers to protect water quality and the environment during construction activities. Key instructions include hauling off all demolished materials, adequately clearing and grubbing designated areas, and coordinating with mechanical and electrical systems removal as per specialized drawings. The contractor is required to maintain flow capacity in existing drainage systems and implement erosion control measures. Specific zones, such as Florida Bay and Whitewater Bay, are designated for specific remedial actions ensuring compliance with government regulations. The overall objective of the project is to rehabilitate the marina's bulkhead while minimizing environmental impact and complying with federal guidelines, reflecting the government's commitment to both infrastructure improvement and ecological preservation in pivotal natural areas.
    The document outlines the procedures for the removal, decontamination, and disposal of underground fuel system components at Flamingo Marina in Monroe County, Florida. It covers the removal of three fuel dispensers, associated piping, and sumps, considering them hazardous waste due to remaining fuel residue. The project necessitates comprehensive planning: safety protocols, excavation plans, and environmental compliance with federal and state regulations. Key sections detail required qualifications for personnel, quality assurance measures, necessary permits, and submittals to be approved by government authorities. Safety is prioritized, mandating the implementation of a Site Safety and Health Plan. Excavation must be executed cautiously to limit exposure and environmental contamination, with specific guidelines on the management of excavated soil and water disposal. The document emphasizes a structured approach to decontamination, ensuring that all hazardous materials are handled responsibly to mitigate risks to health and environmental safety. It concludes with the essential reporting and documentation requirements for waste disposal and project accountability. Overall, this comprehensive guideline reflects the government's standards for ensuring that environmental remediation projects are conducted safely and efficiently.
    The document outlines specifications for the rehabilitation of the Flamingo Marina Bulkhead in Monroe County, Florida, primarily focusing on structural metal fabrications. It details general requirements, quality assurance measures, fabrications standards for steel and aluminum, welding qualifications, inspection protocols, and product specifications for materials such as sealants and fasteners. The section emphasizes adherence to various reference standards, including those from the American Welding Society and ASTM. Key sections include strict guidelines for welding practices, materials tolerances, and the necessity of detail submittals for governmental approval. The document mandates rigorous testing and inspection procedures to ensure compliance with safety standards and structural integrity throughout the project. It serves as a comprehensive manual to guide contractors and subcontractors in achieving precise execution while ensuring quality assurance and environmental compatibility in line with regulatory requirements, highlighting the project's commitment to excellence in construction practices.
    The Flamingo Marina Bulkhead Rehabilitation project in Monroe County, Florida, outlines electrical work specifications necessary for the infrastructure's rehabilitation. The document encompasses various sections detailing general requirements, product specifications, and installation instructions across multiple aspects of electrical work, including conduits, raceways, lighting systems, circuit breakers, and transformers. Emphasis is placed on using standard and approved materials that comply with regulatory and safety standards, such as NFPA 70 and various ASTM standards. Clear guidelines for submittals, quality control, installation techniques, and identification measures are included. The project's purpose is to ensure safe and effective installation and maintenance of electrical systems within the rehabilitation efforts, highlighting the commitment to regulatory compliance and quality standards in public infrastructure projects. This comprehensive technical document serves as a framework to guide contractor compliance with the specified requirements for the electrical component of the rehabilitation.
    The document outlines specifications for the Flamingo Marina Bulkhead Rehabilitation project at Everglades National Park, Monroe County, Florida, conducted by the U.S. Army Corps of Engineers. It emphasizes the importance of coordinating structural elements such as pipes and conduits with various engineering drawings prior to concrete placement. Specific guidelines dictate the construction layout and bar reinforcement details for cast-in-place concrete structures, including precise requirements for embedment lengths, lap splices, and reinforcement coverage at joints. The document also contains technical abbreviations, standards, and references to ensure compliance with American construction guidelines. It includes critical construction notes such as the removal of existing concrete structures and the replacement with modern materials. By adhering to these specifications, the project aims to enhance the structural integrity and longevity of the marina infrastructure while ensuring safety and environmental sustainability. The comprehensive detail reflects the project's adherence to federal and state project guidelines, positioning it within a framework of responsible and systematic engineering practices while maintaining environmental integrity.
    The document outlines the technical specifications and requirements for the Flamingo Marina Bulkhead Rehabilitation project in Everglades National Park, Monroe County, Florida. It details the mechanical systems, plumbing, and electrical installations necessary for the rehabilitation effort. Key components include the demolition and replacement of existing water and sewage lines, installation of utility pedestals, sanitary pump-outs, and fuel dispensers, all while adhering to federal, state, and local guidelines. The project requires a coordination of various contractors, ensuring clearances around equipment, installation of sanitary pump-outs, and adherence to safety protocols. The document includes schematics and notes on equipment placement and construction details. Additionally, it highlights the importance of compliance with environmental standards and operational maintenance. This initiative reflects the commitment to improving infrastructure while ensuring environmental protection, safety, and longevity of the marina facilities.
    The document outlines the electrical scope for the Flamingo Marina Bulkhead Rehabilitation project in Everglades National Park, Florida. It is structured into numerous sections detailing electrical symbols, abbreviations, and notes crucial for contractors engaged in electrical works. The document emphasizes the need for careful coordination among various trades to ensure that electrical equipment is placed correctly as per the schematic designs presented. Key responsibilities include installing and replacing utility pedestals, dock panels, and associated underground conduits while ensuring compliance with safety regulations, such as maintaining appropriate distances from other utilities. The contractor is also instructed to manage existing equipment and wiring, with clear demarcations of which elements are to remain versus those slated for removal. Specific installation requirements for electrical panels and fixtures are outlined, including grounding and weatherproofing specifications. The document serves as a technical guideline for contractors to ensure that all electrical installations meet necessary federal and local standards while promoting safety and operational integrity in the rehabilitation effort.
    The document outlines the rehabilitation plans for the bulkheads and boat ramps at the Flamingo Developed Area within Everglades National Park. The U.S. Army Corps of Engineers is responsible for the project, which includes the construction of new bulkheads for boat basins, site preparation, and the installation of various structural elements such as finger piers and service docks. Specific bid items are detailed, including quantities and types of materials required, such as general fill, rip rap, and fender piles. The project hinges on ensuring compliance with existing conditions and construction standards, necessitating verification of historical drawings against current site conditions. Notable construction notes emphasize contractor responsibilities in managing and verifying construction materials and the integrity of the site throughout the rehabilitation process. The document serves as a bidding resource, providing potential contractors with essential information needed for compliance with federal and local requirements, and aims to ensure the restoration of vital park infrastructure while adhering to environmental and safety standards.
    The document outlines the rehabilitation of the Flamingo Marina bulkhead within Everglades National Park, featuring detailed plans and specifications for various construction components. The proposal includes the installation of a new boat basin, relocation of fuel tanks, construction of a fueling slab, and enhancements to existing infrastructures like ramps and bulkheads. Key structural details include the use of prestressed concrete piles, bulkhead systems, and a reinforced concrete slab with specific requirements for anchoring and stability under marine conditions. Moreover, technical notes emphasize contractor responsibilities for verifying reference drawings, adhering to design specifications, and ensuring compliance with environmental regulations. The project aims to improve marina operations while maintaining safety and environmental integrity. Critical to this initiative is the integration of new fueling equipment designed to meet federal and state standards. Overall, the document serves as a vital guide for contractors engaged in the rehabilitation project, aiming to bolster maritime accessibility while restoring essential marine infrastructure effectively.
    The document outlines the project specifications for the Flamingo Marina Bulkhead Rehabilitation and water supply upgrades at Everglades National Park. It emphasizes installing pressure reducing valves to manage water pressure, relocating fuel tanks, and maintaining compliance with environmental standards. Key components include the installation of new 8-inch diameter water pipes parallel to existing infrastructure and the reconnection of existing water service lines. Supporting details note that the proposed infrastructure changes prioritize minimal environmental impact and ensure safe operation by adhering to defined separations between water lines and other services. Additionally, the document includes visual references and specifications for the anchoring of new structures, ensuring safety and compatibility with existing systems. By focusing on upgrading essential utilities and improving safety measures at the marina, the initiative demonstrates the U.S. Army Corps of Engineers’ commitment to enhancing operational quality while preserving the environment within this protected area. The comprehensive project approach is designed to align with federal and local guiding principles, reflecting the critical need for sustainable infrastructure development in national parks.
    The US Army Corps of Engineers aims to transform its Resource Management office space in Jacksonville, Florida. They seek a commercial contractor to supply and install floor-to-ceiling walls, doors, and furniture to create two enclosed offices. The project involves installing modular walls, glass inserts, and various office furniture items with specific dimensions and quantities listed. This includes chairs, tables, desks, storage units, and accompanying hardware. The contractor is responsible for supervision, materials, equipment, and transportation, connecting the new walls to existing structures, and ensuring acoustic attenuation. Delivery and installation are required within 60 days of the award. Materials will be tested upon delivery, and the work is to be conducted during regular work hours. Security clearances are needed for accessing sensitive areas.
    The National Park Service (NPS) has issued a Request for Information (RFI) regarding the rehabilitation of marina bulkheads at Flamingo. This document seeks input from contractors on technical approaches to various key tasks, such as installation equipment for sheet piles, pre-auguring methods for hard limestone layers, and procedures for sealing CLSM (Controlled Low Strength Material) segments. Contractors are also asked for strategies to manage turbidity during construction while ensuring environmental compliance due to sensitive wildlife in the area. Additionally, the RFI explores the use of Project Labor Agreements (PLAs). Contractors are prompted to share experiences with PLAs in similar projects, potential labor shortages in the region, scheduling impacts, cost implications, and how PLAs may affect project procurement processes. Importantly, the government seeks insights on the advantages or disadvantages of utilizing PLAs in this context, including feedback on timelines for finalizing such agreements. This comprehensive solicitation aims to gather detailed contractor insights to inform project execution while promoting environmental and operational efficiency. Overall, this RFI underscores the NPS's commitment to engaging qualified contractors in an essential rehabilitation project, ensuring both operational effectiveness and environmental stewardship.
    Similar Opportunities
    MAINTENANCE DREDGING FORT PIERCE HARBOR 28-FOOT AND 30-FOOT PROJECTS & SHORE PROTECTION PROJECT FORT PIERCE BEACH RENOURISHMENT 2025, ST. LUCIE COUNTY, FLORIDA
    Active
    Dept Of Defense
    The Department of Defense, through the Army Corps of Engineers, is seeking contractors for the maintenance dredging of Fort Pierce Harbor and the associated beach renourishment project in St. Lucie County, Florida. The project involves dredging beach-compatible material and constructing a beach berm along approximately 7,000 feet of shoreline, with specific environmental monitoring and compliance requirements. This procurement is crucial for maintaining navigational safety and coastal protection, with an estimated construction value between $10 million and $25 million. Interested vendors must register on SAM.gov to receive updates and submit bids by October 31, 2024, following the anticipated issuance of the Invitation for Bid on September 26, 2024. For further inquiries, contact William Wallace at william.j.wallace@usace.army.mil or Guesley Leger at guesley.leger@usace.army.mil.
    PALM BEACH HARBOR MAINTENANCE DREDGING, ENTRANCE CHANNEL AND SETTLING BASIN, PALM BEACH COUNTY, FLORIDA
    Active
    Dept Of Defense
    The Department of Defense, through the Department of the Army, is seeking contractors for the maintenance dredging of Palm Beach Harbor, specifically the Entrance Channel and Settling Basin in Palm Beach County, Florida. The project involves dredging activities that include the removal of sediment and debris, with additional tasks such as turbidity monitoring and environmental species monitoring, aimed at ensuring the harbor's stability and navigability. This maintenance work is crucial for maintaining safe and efficient harbor operations, with an estimated construction value between $10 million and $25 million. Interested vendors should note that the Invitation for Bid (IFB) will be issued around September 23, 2024, with bids due by October 23, 2024; for further inquiries, contact Guesley Leger at guesley.leger@usace.army.mil or Nicole Batista-Cruz at Nicole.M.Batista-Cruz@usace.army.mil.
    Comprehensive Everglades Restoration Program (CERP), Central Everglades Planning Project (CEPP), Contract 3B, S-355W Spillway Project, Miami-Dade County, Florida
    Active
    Dept Of Defense
    Presolicitation DEPT OF DEFENSE is seeking a contractor for the Comprehensive Everglades Restoration Program (CERP), Central Everglades Planning Project (CEPP), Contract 3B, S-355W Spillway Project in Miami-Dade County, Florida. The project involves excavation, dewatering, blasting, levee embankment repairs, and construction of a new spillway structure and associated sheet pile retaining walls. The new spillway structure will have a design capacity of approximately 1,200 cubic feet per second (cfs) with two bays with vertical lift roller gates, a control room, a service bridge, and a two-lane public access bridge. The project also includes lowering the existing levee crown elevation, installation of a cofferdam system, sheet pile retaining walls, rip rap slope protection, and monitoring platforms. The estimated period of performance is 1122 calendar days. The solicitation will be issued on or about April 5, 2024, with a response date on or about May 6, 2024. Interested vendors must register on the SAM.gov website to receive notification of any amendments to the solicitation.
    CANAVERAL HARBOR MAINTENANCE DREDGING, BREVARD COUNTY, FLORIDA
    Active
    Dept Of Defense
    The Department of Defense, specifically the U.S. Army Corps of Engineers, is seeking interest from qualified contractors for the maintenance dredging project at Canaveral Harbor in Brevard County, Florida. The project involves the removal of approximately 1.2 million cubic yards of shoal material from designated areas and the disposal of this material at an Ocean Dredged Material Disposal Site, along with environmental monitoring tasks. This maintenance dredging is crucial for ensuring navigational safety and operational efficiency in the harbor, with an estimated contract value between $10 million and $25 million and a performance period of 260 calendar days. Interested parties must submit their responses to the Sources Sought Notice by October 4, 2024, and can contact Timothy Humphrey or William Wallace for further information.
    Advance Notice - NPS Beach Channel Drive Bulkhead
    Active
    Dept Of Defense
    The Department of Defense, specifically the U.S. Army Corps of Engineers (USACE) New York District, is seeking contractors for the Design-Build construction services to replace the bulkhead along Beach Channel Drive at Jacob Riis Park in Rockaway Beach, New York. The project aims to extend the service life of the existing bulkhead, which is approximately 5,300 linear feet, for an additional 100 years, while also repaving the adjacent multi-use trail and replacing damaged storm drain pipes. This project is significant for maintaining the structural integrity of the coastal area and ensuring compliance with various federal, state, and local regulations. Interested contractors should note that the anticipated solicitation will be posted around October 21, 2024, with a project magnitude between $25 million and $100 million, and are encouraged to contact Monica Coniglio at monica.n.coniglio@usace.army.mil for further details.
    Marine Construction - West Bulkhead Replacement at the Cape Cod Canal East Boat Basin in Sandwich, MA
    Active
    Dept Of Defense
    The Department of Defense, through the U.S. Army Corps of Engineers, is soliciting bids for the Marine Construction project involving the West Bulkhead Replacement at the Cape Cod Canal East Boat Basin in Sandwich, Massachusetts. The project aims to replace a significantly corroded existing bulkhead, enhancing the structural integrity of the marine facility while ensuring compliance with environmental regulations. This federal contract, estimated to cost between $5 million and $10 million, requires completion within 410 calendar days after the notice to proceed, with bids due by September 25, 2024, at 1:00 PM. Interested contractors should acknowledge receipt of all amendments and can contact Tyler Maryak at tyler.s.maryak@usace.army.mil or Erin Bradley at ERIN.E.BRADLEY@USACE.ARMY.MIL for further information.
    St. Francis Barracks Seawall, Shoreline Erosion Protection, CAP Section 14, St. Johns County Florida
    Active
    Dept Of Defense
    Presolicitation DEPT OF DEFENSE is seeking services for the St. Francis Barracks Seawall, Shoreline Erosion Protection in St. Johns County, Florida. The project involves various construction tasks such as installing a gravel drain system, patching existing block voids/cracks, realigning granite capstone, repointing mortar joints, installing a concrete trench drain, filling soil voids, and performing archaeological monitoring. The estimated cost of construction is between $500,000.00 and $1,000,000.00, with a performance period of 240 calendar days. The NAICS Code is 237990, and the size standard is $39.5 million. The RFP is expected to be issued on or about March 15, 2022, with proposals due on or about April 14, 2022. Prospective contractors must be registered in the SAM database. This is a pre-solicitation notice and not a commitment by the Government.
    CENTRAL EVERGLADES PLANNING PROJECT (CEPP), SOUTH PHASE, CONTRACT 2A, S-356E PUMP STATION AND S-334E SPILLWAY PROJECT, MIAMI-DADE COUNTY, FLORIDA
    Active
    Dept Of Defense
    Presolicitation DEPT OF DEFENSE is seeking construction services for the CENTRAL EVERGLADES PLANNING PROJECT (CEPP), SOUTH PHASE, CONTRACT 2A, S-356E PUMP STATION AND S-334E SPILLWAY PROJECT in Miami-Dade County, Florida. The project involves the construction of a new levee system, pump station structure, spillway structure, and steel pile bulkhead wall. The estimated period of performance is 2548 calendar days. Interested vendors must register on the sam.gov website to receive notification of any amendments to the solicitation.
    Replace Waterfront Transformers and Igloos at Naval Station Mayport, Florida.
    Active
    Dept Of Defense
    The Department of Defense, through the Naval Facilities Engineering Command Southeast, is soliciting proposals for a Design-Build, Firm-Fixed-Price construction contract to replace waterfront transformers and igloos at Naval Station Mayport, Florida. This project aims to enhance the electrical infrastructure and ensure the operational readiness of the naval station by upgrading critical utility components. The successful contractor will be responsible for the design and construction aspects of the project, which is vital for maintaining the safety and efficiency of naval operations. Interested parties can reach out to Deborah Torrence at deborah.d.torrence2.civ@us.navy.mil or by phone at 904-542-6665, or contact Lindsay Betteridge at LINDSAY.E.BETTERIDGE@NAVY.MIL or 912-409-3846 for further information.
    Canaveral National Seashore - NP SER PMS FY24(1)
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Highway Administration, is soliciting bids for the Canaveral National Seashore pavement preservation project (NP SER PMS FY24(1)) in Florida. The project aims to enhance approximately 16.33 miles of roadways and parking areas using various preservation techniques, including micro surfacing and full-depth patching, while adhering to strict environmental guidelines to protect local ecosystems. This initiative is crucial for maintaining infrastructure within national parks, ensuring accessibility and safety for visitors. Bids are due by October 3, 2024, at 2:00 p.m., with an estimated contract value between $5 million and $10 million, and interested parties can contact Shirley A. Anderson at eflhd.contracts@dot.gov or 703-948-1407 for further details.