BGNDRF Backflow Preventer Replacement
ID: 140R4025Q0008Type: Solicitation
Overview

Buyer

INTERIOR, DEPARTMENT OF THEBUREAU OF RECLAMATIONUPPER COLORADO REGIONAL OFFICESALT LAKE CITY, UT, 84138, USA

NAICS

Water and Sewer Line and Related Structures Construction (237110)

PSC

MAINT/REPAIR/REBUILD OF EQUIPMENT- VALVES (J048)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)
Timeline
    Description

    The Bureau of Reclamation, part of the Department of the Interior, is soliciting proposals for the replacement of backflow preventers at the Brackish Groundwater National Desalination Research Facility in Alamogordo, New Mexico. The project involves the removal and installation of various backflow preventers and shutoff valves, requiring compliance with local regulations and coordination with utility services to minimize disruptions. This initiative is crucial for maintaining safe and efficient water infrastructure, ensuring adherence to public health standards. Interested small businesses must submit their proposals by January 27, 2024, with a project budget estimated between $100,000 and $250,000. For further inquiries, contact Ronda Lucero at rlucero@usbr.gov or call 505-462-3650.

    Point(s) of Contact
    Files
    Title
    Posted
    The Brackish Groundwater National Desalination Research Facility is undertaking a project to replace backflow preventers and install shutoff valves at its site in Alamogordo, New Mexico. The work includes coordinated utility interruptions with local authorities, ensuring compliance with city and state regulations, and minimizing disruption to facility operations. The project encompasses the removal and replacement of existing insulation, verification of backflow preventer operation, and documentation for future inspections. Key specifications detail project management protocols, construction scheduling, and submittal requirements to ensure safety and adherence to regulatory standards. The contractor must conduct site coordination meetings, develop a comprehensive safety program, and maintain accurate records of all activities and hazards encountered. Temporary utilities such as electricity and water will be managed per contract requirements, including the rectification of any disruptions to existing installations. The document serves as a guideline for contractors outlining crucial project components, expectations for safety protocols, and detailed procedures for utility management, reflecting the government's commitment to maintaining infrastructure while ensuring compliance with environmental and operational standards.
    The BGNDRF Backflow Preventer Replacement document outlines the pricing structure for a government contract related to the replacement and installation of backflow preventer (BFP) systems. It specifies that offers will be evaluated based on the lowest responsive bid from responsibleOfferors, with no partial bids accepted. The price schedule includes multiple line items: mobilization and preparatory work, removal and disposal of existing system components, installation of new valves and insulation systems, applicable New Mexico gross receipts tax, and freight charges. It emphasizes that the total bid amount must encompass all fees and taxes. The government retains the right to request additional information to verify each line item. Overall, the document serves as a formal solicitation for bids while establishing clear terms and expectations for potential contractors, ensuring compliance with government procurement protocols.
    The document outlines wage determinations under the Davis-Bacon Act for heavy construction projects in Otero County, New Mexico, effective March 22, 2024. It details minimum wage requirements based on two Executive Orders: EO 14026, applicable to contracts entered on or after January 30, 2022, which mandates at least $17.20 per hour for covered workers, and EO 13658, relevant for contracts between January 1, 2015, and January 29, 2022, stipulating a minimum wage of $12.90. The document further provides details on specific trade classifications and their corresponding wage rates, including electricians, ironworkers, and laborers, noting that rates may adjust for additional classifications as needed. It introduces the Appeals Process for wage determinations, encouraging affected parties to request reviews and seek reconsideration through formal channels. Overall, this wage determination serves as a critical guideline to ensure compliance with federal labor standards in government construction contracts, emphasizing the importance of fair worker compensation under federal contracts and providing a structured process for addressing disputes regarding wage classifications.
    The document discusses the infrastructure related to non-potable water systems within a specific locality. It details the existing conditions of a city’s 8-inch water main and a 10-inch fire main, which were previously housed in a vault prior to 2017. Additionally, it mentions a 6-inch non-potable water supply piping and backflow preventer also situated in a vault before the same time. This information is relevant in the context of government requests for proposals (RFPs) and grants, as proper documentation and understanding of existing water infrastructure are essential for compliance with public health standards and for future infrastructure projects. The data provided indicates a need for further evaluations and possible reinvigoration of water supply systems to ensure they meet current safety requirements.
    The document outlines a federal Request for Proposals (RFP) aimed at soliciting bids for a community development project. The primary goal is to enhance economic opportunities in underserved areas through targeted federal grants. Key components include infrastructure improvements, job training programs, and support for local businesses. The RFP specifies eligibility criteria for applicants, detailing project scope, expected outcomes, and budgetary constraints. Organizations are urged to collaborate with local governments and community groups to maximize impact. Additionally, the document emphasizes the importance of sustainable practices and long-term community engagement. Timelines for proposal submission and evaluation are clearly indicated, with a focus on transparency and compliance with federal regulations. The initiative aligns with broader governmental objectives to foster equitable growth and support marginalized populations, outlining a strategic framework for successful project implementation.
    The U.S. Bureau of Reclamation (BOR) has issued a Pre-Solicitation Notice for the Brackish Groundwater National Desalination Research Facility in Alamogordo, New Mexico, concerning the replacement of four backflow preventers due to operational failures. This notice serves as an informational platform rather than a formal Request for Quotation (RFQ); thus, no binding commitments are implied at this stage. Interested contractors are invited to submit their company information, capability statements, and relevant identifiers voluntarily, with a formal solicitation expected to be released in November 2024. The anticipated contract is a firm-fixed price construction agreement, classified under NAICS code 237110, with a small business size standard of $45 million. The project is estimated to cost between $100,000 and $250,000, requiring a Payment Bond at 100% of the contract value, with an expected completion time frame of 90 days post-Notice to Proceed. Evaluation criteria will emphasize technical capability, past performance, and pricing. All updates will be posted on the SAM.gov website, and interested parties must be registered there for eligibility. The notice clarifies that the government will not incur any costs from responses, which remain non-binding.
    The Brackish Groundwater National Desalination Research Facility (BGNDRF) is undergoing a project to replace backflow preventers and install shutoff valves. The work is located at 500 LaVelle Road, Alamogordo, NM, and includes coordination with local government for water shutoff and compliance with city and state codes. Key components involve the removal of existing backflow preventers, installation of new ones, and replacing insulation. The project stipulates adherence to various safety, environmental, and general operational standards, including a detailed construction program governed by the Critical Path Method (CPM). Coordination meetings with the Contracting Officer Representative (COR) are essential for scheduling utility interruptions and outlining the project scope. The project also emphasizes the importance of site restoration post-construction and the management of materials in line with safety regulations and waste management protocols. Overall, the objective is to enhance the facility's plumbing systems while ensuring minimal disruption to ongoing operations and maintaining compliance with legal and safety standards.
    The document is an amendment (No. 0001) to solicitation 140R4025Q0008 issued by the Bureau of Reclamation, detailing updates and instructions for contractors. Key modifications include an extension of the proposal submission deadline to December 27, 2024, and an updated performance period ending June 30, 2025. Offerors must acknowledge receipt of the amendment and may modify prior submissions accordingly. Key documents needed with proposals include a cover sheet with business details, a detailed technical proposal addressing the Statement of Work, examples of past performance, a completed pricing proposal, and a signed SF-1442. All inquiries must be directed to Contract Specialist Ronda Lucero by December 20, 2024. This amendment emphasizes the government’s methodical process for gathering bids while ensuring clarity and compliance with solicitation requirements.
    The document pertains to Amendment 0002 of Solicitation No. 140R4025Q0008 for the BGNDRF Backflow Preventer Replacement project, issued by the Bureau of Reclamation. The amendment includes key modifications such as a site visit synopsis with attendee discussions, answers to vendors' queries, and the inclusion of original valve drawings. Significant time extensions have been provided, pushing the proposal submission deadline to January 27, 2025, and extending the question clarification period to January 10, 2025. The document also confirms details regarding the types and sizes of backflow preventers to be replaced at the facility, confirming there are four valves: a 2” irrigation, an 8” potable, a 10” fire water main, and a 6” non-potable water BFP. This amendment aims to facilitate contractor engagement by responding to industry concerns, ensuring accurate information and adherence to timelines while supporting collaborative efforts necessary for project execution.
    This document represents Amendment 0003 for solicitation 140R4025Q0008, issued by the Bureau of Reclamation for a project in the Upper Colorado Region. The amendment alters the deadline for quotes from December 27, 2024, to January 27, 2024, at 4:00 p.m. MST, and clarifies submission procedures to be conducted via email to Contract Specialist Ronda Lucero. It specifies that questions or requests for clarification must be submitted by January 10, 2025, also by 4:00 p.m. MST. The project’s period of performance is established from February 17, 2025, to June 30, 2025. Contractors are required to acknowledge the receipt of this amendment in their submissions, emphasizing the importance of adherence to revised timelines to avoid the rejection of offers. The document is structured with formal sections detailing the amendment's purpose, submission instructions, and administrative details related to the government's contracting processes. This amendment reflects the ongoing commitment to ensure clarity and compliance in federal contracting actions, aligning with standard practices in government requests for proposals (RFPs).
    The document pertains to the Request for Proposal (RFP) for the Backflow Preventer Replacement project at the Brackish Groundwater National Desalination Research Facility, issued by the Bureau of Reclamation. The solicitation number is 140R4025Q0008. The project, estimated between $100,000 and $250,000, is set aside for small businesses under NAICS code 237110, focusing on water and sewer line construction. The contractor is expected to begin performance by December 27, 2024, with completion due by May 18, 2025. Key components of the contract include specific attachments detailing the Statement of Work, pricing schedule, and wage determination. It outlines requirements such as performance and payment bonds. The document establishes terms regarding bid submission, evaluation criteria, and the conduct of work, including adherence to health and safety standards. Moreover, the contracting officer holds the authority to direct the project's technical administration. The goal reflects the government's commitment to enhancing infrastructure while ensuring compliance with federal regulations and promoting local businesses' participation.
    Lifecycle
    Title
    Type
    Similar Opportunities
    Z--SJC AZOTEA PORTAL AND DROP STRUCTURES
    Active
    Interior, Department Of The
    The Department of the Interior, specifically the Bureau of Reclamation's Upper Colorado Regional Office, is preparing to solicit proposals for the construction of the SJC Azotea Tunnel Portal and Drop Structures in Rio Arriba County, New Mexico. The project involves critical construction activities such as water diversion, dewatering excavations, and the creation of new reinforced concrete structures, alongside earthwork, riprap removal and replacement, and the installation of drainage systems and safety access ladders. This initiative is vital for the renovation of essential water management infrastructure, with an estimated project value between $1 million and $5 million and a completion timeframe of approximately 15 months. Interested small businesses should note that the Request for Proposals is expected to be released on January 3, 2025, and can contact Mary Maestas at mmaestas@usbr.gov or by phone at 505-462-3581 for further information.
    Y--AVC - Crowley Reach 1
    Active
    Interior, Department Of The
    The U.S. Bureau of Reclamation is seeking small business sources for the Arkansas Valley Conduit (AVC) Crowley Reach 1 construction project, which aims to provide a reliable municipal and industrial water supply from Pueblo Reservoir to 40 communities in southeastern Colorado. The project involves the installation of approximately 5.3 miles of 30-inch water transmission pipe and associated infrastructure, including valves, crossings, and traffic management measures, with an estimated cost between $45 million and $55 million. This initiative is crucial for enhancing water supply capabilities for a projected future population of 50,000 people in the service area, reflecting the government's commitment to infrastructure development and support for small enterprises. Interested businesses must submit their qualifications and bonding capabilities by January 15, 2025, to Monte Baird at mbaird@usbr.gov, with responses clearly marked in the subject line.
    LaBarge Watershed Water Wells
    Active
    Interior, Department Of The
    The Department of the Interior, specifically the Bureau of Land Management, is soliciting bids for the LaBarge Watershed Water Wells construction project in Sublette County, Wyoming. This project involves the development of water supply facilities, with a firm fixed-price contract valued between $250,000 and $500,000, aimed exclusively at small businesses. The successful contractor will be responsible for drilling and constructing eight water wells, adhering to strict safety, environmental, and regulatory standards, with a completion timeline of 300 calendar days from the notice to proceed. Bids are due by January 13, 2025, and interested parties can contact Nathan Roush at nroush@blm.gov or (303) 236-2211 for further information.
    Y--WY Miracle Mile Replacement of Three (3) Vault Toilets
    Active
    Interior, Department Of The
    The Bureau of Reclamation, under the Department of the Interior, is seeking interest from small businesses for the replacement of three vault toilets at the Wyoming Miracle Mile campground. The project involves the demolition of existing toilets, installation of pre-manufactured concrete vault toilets, and necessary site preparation work, all while ensuring compliance with ADA and ABA standards. This initiative is part of a broader effort to engage small businesses in federal procurement opportunities, with an estimated project value between $100,000 and $250,000. Interested parties must submit a Capability Statement detailing their relevant experience and business size to the designated Contracting Officer, Darlene Dillon, at DDillon@usbr.gov by January 2, 2025.
    Z--Reaches 21 Utility Potholing
    Active
    Interior, Department Of The
    The Department of the Interior, specifically the Bureau of Reclamation, is seeking qualified contractors for the "Reaches 21 Utility Potholing" project, which involves locating and verifying existing underground utilities as part of the Navajo-Gallup Water Supply Project. The contractor will utilize air or hydro-excavation methods to expose utility tops for survey data collection, ensuring compliance with safety regulations and coordination with utility owners during excavations. This project is crucial for enhancing water supply infrastructure while adhering to environmental and safety standards. Interested small businesses must attend a mandatory site visit on January 2, 2025, and submit their proposals by acknowledging the amendments to the solicitation, with the performance period set from January 15, 2025, to February 15, 2025. For further inquiries, potential bidders can contact Brittney Nielson at bnielson@usbr.gov.
    Z--Folsom Right Wing Dam - North Fork Ditch Bypass
    Active
    Interior, Department Of The
    The Department of the Interior, specifically the Bureau of Reclamation, is preparing to solicit proposals for a firm fixed-price construction contract for modifications to the Folsom Right Wing Dam’s North Fork Ditch Bypass, with a focus on small business participation. The project involves critical tasks such as site preparation, removal of existing infrastructure, installation of drainage systems, and utility installations, with estimated costs ranging from $5 million to $10 million. This initiative underscores the government's commitment to enhancing infrastructure while supporting small businesses in significant construction projects. The solicitation, identified as 140R2025R0004, is expected to be posted on the Government Point of Entry around January 3, 2025, with proposals due by February 3, 2025; interested contractors must be registered in the System for Award Management (SAM) to qualify for bidding. For inquiries, contractors can contact Ronald Gamo at rgamo@usbr.gov or by phone at 916-978-4304.
    37--MRG SFD BOOM MOWER
    Active
    Interior, Department Of The
    The Bureau of Reclamation, part of the Department of the Interior, is seeking potential vendors for a specialized purpose-built telescoping boom mower to replace aging equipment used for vegetation management near low flow channels and access roads in Socorro, New Mexico. The procurement emphasizes operator safety and equipment reliability, with key specifications including a diesel engine with a minimum of 140 horsepower, hydrostatic drive transmission, and a telescoping boom capable of extending at least 30 feet. This equipment is crucial for maintaining safe and efficient operations in managing grass, brush, and overhead limbs, ensuring compliance with federal safety and environmental standards. Interested vendors are encouraged to submit capability statements by December 27, 2024, to Ronda Lucero at rlucero@usbr.gov, as this notice serves to assess market capabilities for future procurement needs.
    Bill Williams River NWR Well
    Active
    Interior, Department Of The
    The U.S. Fish and Wildlife Service (FWS) is seeking qualified contractors for the Bill Williams River National Wildlife Refuge (BWRNWR) well installation project in La Paz County, Arizona. The project involves the construction of a 6-inch diameter groundwater well, with a depth of at least 100 feet, to support irrigation for newly planted native trees in a 60-acre area affected by a recent wildfire. This initiative is crucial for ecological restoration and aligns with federal efforts to enhance wildlife habitats. Interested vendors must submit their quotations by January 8, 2025, with an estimated project cost ranging from $100,000 to $250,000, and are encouraged to contact Tiffany Breske at TiffanyBreske@fws.gov or 612-713-5187 for further details.
    Z--Battle Creek - South Diversion Dam and Canal Removal
    Active
    Interior, Department Of The
    The Bureau of Reclamation, part of the Department of the Interior, is preparing to issue a Request for Proposal (RFP) for a firm fixed-price construction contract focused on the removal of the Battle Creek South Diversion Dam and associated canal. The project involves significant demolition work, including the dismantling of multiple diversion dams and the excavation and filling of the South Canal, with an estimated project cost ranging from $10 million to $15 million. This procurement is crucial for environmental restoration efforts in the region and is open to all responsible sources, with a requirement for 100% performance and payment bonds. Interested contractors must be registered in the System for Award Management (SAM) and can expect the solicitation to be posted on or around January 3, 2025, with proposals due approximately by February 3, 2025. For inquiries, contact Rosana Yousef Goarji at RYousefgoarji@usbr.gov or call 916-978-5004.
    Y--GVIC FISH SCREEN REHABILITATION
    Active
    Interior, Department Of The
    The Department of the Interior, through the Bureau of Reclamation, is soliciting bids for the rehabilitation of fish screens at the Grand Valley Irrigation Company (GVIC) located in Mesa County, Colorado. This project, estimated to cost between $1,000,000 and $5,000,000, aims to enhance water infrastructure as part of the Upper Colorado River Endangered Fish Recovery Program, focusing on the installation of new concrete structures and fish screens, along with a control and cleaning system. The rehabilitation is crucial for preserving aquatic ecosystems and ensuring compliance with environmental regulations. Interested small businesses must submit their sealed bids by January 29, 2025, with inquiries due by January 10, 2025, and the expected performance period running from April 1, 2025, to May 1, 2026. For further details, potential bidders can contact Ana Fife at afife@usbr.gov or by phone at 801-524-3671.