BBEC Iron Gate Replacement
ID: FA301024Q0032Type: Solicitation
Overview

Buyer

DEPT OF DEFENSEDEPT OF THE AIR FORCEFA3010 81 CONS CCKEESLER AFB, MS, 39534-2701, USA

NAICS

All Other Specialty Trade Contractors (238990)

PSC

REPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS (Z2JZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)
Timeline
    Description

    The Department of Defense, specifically the Department of the Air Force, is soliciting proposals for the BBEC Iron Gate Replacement project at Keesler Air Force Base in Biloxi, Mississippi. The project involves the installation of a new steel loading dock gate and an aluminum ramp gate, designed to withstand various weather conditions, with specific dimensions and operational requirements outlined in the solicitation documents. This procurement is crucial for maintaining facility operations and safety standards, with an estimated construction budget between $25,000 and $100,000, and is set aside exclusively for small businesses. Interested contractors must attend a mandatory site visit on September 2, 2024, and submit their proposals by the specified deadlines, with further inquiries directed to SrA Andrew Evitts at andrew.evitts.1@us.af.mil or Tiffany Aultman at tiffany.aultman@us.af.mil.

    Files
    Title
    Posted
    The Statement of Work (SOW) for the BBEC Iron Gate Replacement outlines the requirements for a contractor to provide labor, materials, and supervision for the installation of a loading dock gate and ramp at the Back Bay Event Center, Keesler AFB, MS. The contractor must ensure all work is compliant with provided specifications and any necessary items not explicitly detailed must be included without extra cost. The project involves installing a main black steel gate and an aluminum ramp gate, with debris removal required post-installation. Performance begins 10 days post-contract award and must be completed within 30 days. All work must adhere to federal, state, and local safety regulations, and the contractor is responsible for supervision, scheduling, and compliance with laws. Utility provision is primarily the government's responsibility, and contractor work hours are limited to weekdays unless exceptions are approved. The contractor must also ensure all workmanship is warranted for 12 months. This document serves to guide the award and execution of a federal contract for facility improvements, emphasizing safety, compliance, and quality standards.
    The document outlines a request for the replacement of a loading dock gate at the Bay Breeze Event Center, Keesler AFB, Mississippi. The specifications require the installation of a new steel gate in black, able to withstand various weather conditions. The main gate dimensions are 10'6" in height and 162" in width, with a corresponding employee gate measuring 10'6" in height and 4' in width. Both gates must be manually operated for delivery trucks and will be installed on existing posts using sealed bearing hinges. The project underscores adherence to durability and weather resistance while ensuring functionality at the loading dock. The delivery location for the new gates has been specified as 500 Ploesti Dr., Keesler AFB, MS 39534, under procurement FA201024Q0032. This RFP aligns with government initiatives to maintain facility operations and safety standards.
    The document is a federal government Request for Proposals (RFP) and grant funding outline aimed at identifying key areas for investment and partnerships. It emphasizes the importance of collaboration among federal, state, and local entities in securing resources to address community needs. The main purpose is to guide applicants through the RFP process, ensuring projects align with federal guidelines while meeting local priorities. The key points include the criteria for successful proposals, which should demonstrate clear objectives, adherence to applicable regulations, and sustainable impact. The document outlines the expectations for performance metrics, evaluation methods, and reporting processes, stressing accountability and transparency. Supporting details elaborate on previous successful initiatives and the applied methodologies that have shown effectiveness in project implementation. Overall, the document serves as a comprehensive framework to streamline the proposal submission process, facilitate effective partnerships, and achieve optimal allocation of resources toward beneficial programs and services for communities across the nation.
    This document outlines the submittal procedures for contractors engaged with federal government contracts. It classifies submittals into two categories: those requiring Contracting Officer (CO) approval and those for information only. The CO’s approval indicates general compliance with contract requirements but does not absolve contractors from responsibility for errors. Contractors must submit items listed in a Material Submittal Schedule (MSS), ensuring all documents are complete and comply with contract specifications. The process requires timely scheduling for submittals, especially for long lead-time items, and emphasizes the necessity of using specific forms (AF 3000) for submissions. Additionally, the document stipulates timelines for CO review, detailing a maximum of 10 or 14 calendar days depending on the type of submission. Notably, submissions marked as "for information only" do not require approval unless they contain errors, in which case they must be resubmitted for approval. This structured approach ensures that contractors adhere to regulations and maintain compliance with contractual obligations, crucial for the effective administration of federal projects. The document serves as a procedural guideline to facilitate transparent communication and accountability throughout the construction process.
    The document outlines the Schedule of Material Submittals related to the BBEC Iron Gate Replacement project under Solicitation FA301024Q0032. It details the required submissions by the contractor, including shop drawings, color selections, technical data, and warranties, among others. Each submission is associated with specific deadlines, including submission dates to civil engineering and return suspense dates for approvals. The schedule emphasizes the importance of timely and compliant submittals, with sections for noting the status of each submission, including disapprovals if applicable. The document serves as a critical tool for ensuring that all materials meet project specifications and regulatory standards, integral to the project's overall success and compliance with federal and state contracting requirements.
    The document is a performance evaluation questionnaire for contractors involved in federal government contracts, specifically associated with the RFP FA301024Q0032. It is designed to collect information about a contractor's past and present performance. The contractor is required to provide general information, including their name, contact details, and project specifics. Respondents will assess the contractor's performance across various criteria using a rating scale from Exceptional (E) to Unsatisfactory (U), with a requirement for narrative explanations for lower ratings. Key evaluation factors include the contractor's management capabilities, ability to maintain qualified personnel, quality control measures, problem resolution, adherence to project schedules, and communication with government personnel. The form also inquires about the issuance of any cure or show cause notices and whether the contractor is rated in the Contractor Performance Assessment Reporting System (CPARS). The overarching aim is to ensure thorough assessment for potential future contract awards, reinforcing the importance of contractor performance and accountability in government projects.
    This document serves as a request for information concerning contract performance details for BBEC Iron Gate, identified under contract number FA301024Q0032. It outlines the required information to be provided by contractors about their work, including descriptions of the services rendered, performance periods, contracting agencies, and the relationships with subcontractors or key personnel. Specific data points include contract value and any performance issues encountered. Additionally, the second section prompts the submission of details regarding subcontractors or teaming arrangements, including the impact on contract performance and percentages of completion. This operational framework is crucial in evaluating contractor capabilities and performance as part of the federal procurement process, particularly relevant to government Requests for Proposals (RFPs) and grants. The structured format ensures comprehensive and organized information collection essential for decision-making in contract awards and performance assessments.
    The document outlines a requirement for contractors involved in government projects to submit an AF 3000 form for governmental approval prior to any purchase or installation of equipment or services. This requirement emphasizes compliance with federal regulations and ensures that the proposed purchases align with approved government standards. The AF 3000 form serves as a critical document in the procurement process, facilitating due diligence and oversight. By mandating this step, the government aims to maintain transparency and accountability in the procurement process, essential for the effective management of federal funds. The overall tone underscores the importance of adherence to these procedures to ensure that all procurement actions are vetted and authorized before implementation.
    The document outlines a Request for Proposals (RFP) for the "BBEC Iron Gate Replacement" project located at Keesler Air Force Base, with an estimated construction cost between $25,000 and $100,000 and specifically set aside for small businesses. The solicitation requires contractors to begin work within a specified period and includes mandatory performance and payment bonds. Proposals must adhere to various stipulations such as submission deadlines, qualifications of contractors, and compliance with federal wage rate requirements. A mandatory site visit is scheduled to ensure bidders can examine the project environment. The evaluation criteria for bids are detailed in Sections L and M of the RFP. Delivery and performance timelines are established, with the project expected to commence on October 1, 2024, and conclude by October 31, 2024. The document stipulates necessary compliance with federal regulations, including labor standards and anti-terrorism training for contractors. It emphasizes the importance of adhering to procurement procedures, detailed pricing arrangements, and submission protocols to facilitate the selection of qualified contractors for the government project while maintaining budget and timeline expectations.
    The file outlines a federal solicitation for the replacement of the BBEC Iron Gate at Keesler Air Force Base, identified as solicitation number FA301024Q00320001. Issued on 24 August 2024, the project has a budget between $25,000 and $100,000 and is designated as a Total Small Business set-aside. Key requirements include contractors submitting sealed bids, acknowledging amendments, and providing performance and payment bonds. The contractor must commence work within 10 days of award and complete it within 30 days, with a mandatory site visit scheduled for 2 September 2024. The solicitation emphasizes compliance with construction wage rate requirements and includes clauses related to payment protections, work inspections, and adherence to federal guidelines on labor standards. In summary, this document serves to solicit bids for a construction project, providing specific instructions for participation, performance standards, and compliance obligations, underscoring the government’s effort to engage small businesses while ensuring regulatory adherence throughout the project lifecycle.
    This document amends a government solicitation, specifically extending the deadline for offers and detailing modifications to contract clauses. Key changes include adjustments to the number of calendar days for various contract requirements: notably, the time frame for certain clauses has been changed from 10 to 90 calendar days and from 240 to 30 calendar days. Additionally, the date for a mandatory site visit is updated to September 2, 2024. The amendment also emphasizes compliance with anti-terrorism training for contractors employed at Keesler Air Force Base, along with provisions for wage rates under the Davis-Bacon Act. Contractors are required to ensure fair pay for workers and to post wage determinations on-site. Furthermore, the document details the use of an Irrevocable Letter of Credit (ILC) for bid guarantees and performance bonds, outlining requirements for its issuance and confirmation by eligible financial institutions. Overall, this amendment serves to clarify contractual obligations while ensuring compliance with federal regulations and promoting fairness in labor practices, aligning with the broader goals of government procurement processes.
    The document outlines an amendment to a solicitation for the "BBEC Iron Gate Replacement" project at Keesler Air Force Base, altering the scheduled site visit date from August 28, 2024, to September 3, 2024, at 10:30 AM CST. It emphasizes the importance of acknowledging the amendment and provides instructions for contractors to change their previously submitted offers if necessary. The project, categorized as a Total Small Business set-aside, has a construction budget estimated between $25,000 and $100,000. Contractors attending the site visit must possess valid identification, vehicle registration, and proof of insurance for base access. The amendment reiterates that all terms in the original solicitation remain unchanged besides the specified modification. This documentation is part of the procedural framework in federal contracting, ensuring stakeholders are informed of changes and comply with regulations surrounding government procurement.
    This document details an amendment to a solicitation, specifically extending the deadline for receipt of offers and incorporating an additional attachment, the BBEC Iron Gate Drawings, into the solicitation package. It outlines the necessary steps bidders must take to acknowledge receipt of the amendment, including updating their submissions if desired. The amendment, identified by a unique number, does not alter any other terms and conditions of the original solicitation or contract. All amendments must be acknowledged by the offeror to prevent rejection due to late acknowledgment, emphasizing the importance of adherence to submission protocols. The amendment is issued by the 81st Contracting Squadron located at Keesler AFB, MS, with specific contact information for the contracting officer. Overall, the document serves as a formal notice of changes pertinent to potential contractors in the context of federal contracting.
    Lifecycle
    Title
    Type
    Solicitation
    Similar Opportunities
    MS ANG CRTC Vehicle Denial Barrier Repair
    Active
    Dept Of Defense
    The Department of Defense, specifically the Army National Guard, is seeking qualified contractors to refurbish and upgrade the Front Gate Vehicle Denial Barriers at the Combat Readiness Training Center in Gulfport, Mississippi. The contractor will be responsible for providing all necessary personnel, equipment, materials, and quality control to ensure the barriers are restored to full functionality within a performance period of 120 days. This project is critical for enhancing security measures at the facility, and the contract will be awarded based on the Lowest Price Technically Acceptable (LPTA) evaluation method. Interested vendors must submit their quotes by 2:00 PM CDT on September 18, 2024, to the designated contacts, SMSgt Michael S. Hornbeck and Mr. James Nelson, via the provided email addresses.
    MHMV210015 Alter B737 and B733 Munitions Area
    Active
    Dept Of Defense
    The Department of Defense, through the Department of the Air Force, is soliciting bids for the alteration of the B737 and B733 Munitions Area at Kirtland Air Force Base in New Mexico. The project involves minor interior renovations of two buildings, with a construction magnitude estimated between $1,000,000 and $5,000,000. This procurement is crucial for maintaining operational readiness and safety at the base. Interested small businesses must submit their bids electronically by September 23, 2024, with a site visit scheduled for August 19, 2024. For further inquiries, potential bidders can contact Kelly McGrath at kelly.mcgrath.1@us.af.mil or by phone at 505-846-3707.
    Repair Vehicle Access Gate
    Active
    Dept Of Defense
    The Department of Defense, specifically the Department of the Army, is soliciting bids for the repair of an automatic vehicle access gate at the Fresno Air National Guard Base. The project requires contractors to provide all necessary personnel, equipment, and materials to execute the repairs as outlined in the Performance Work Statement, which includes replacing existing traffic loops and ensuring compatibility with the ADVANTOR access system. This procurement is critical for maintaining security and operational efficiency at the base, with the contract set aside exclusively for small businesses under the SBA guidelines, and a total estimated value of approximately $22 million. Interested parties must submit their quotes electronically by September 20, 2024, and can direct inquiries to the 144th Contracting Office at 144.FW.FAL.MSC.Contracting@us.af.mil or by phone at (559) 454-5129.
    IFB - Beale AFB - Aircrew Readiness Facility Addition and Renovation
    Active
    Dept Of Defense
    The Department of Defense, specifically the U.S. Army Corps of Engineers, is soliciting proposals for the construction and renovation of the Aircrew Readiness Facility at Beale Air Force Base in California. This project involves the addition of a 4,596 square foot facility, including restrooms, crew quarters, and service rooms, as well as the renovation of approximately 1,961 square feet of existing space to support aircrew operations. The initiative is crucial for enhancing military readiness and operational efficiency, ensuring compliance with Department of Defense standards and safety regulations. Interested HUBZone small businesses must submit their proposals electronically through the Procurement Integrated Enterprise Environment (PIEE) by September 18, 2024, with a total estimated project cost between $5 million and $10 million. For further inquiries, contractors can contact Adam Brooks at adam.m.brooks@usace.army.mil or by phone at 502-315-7049.
    Audio Video Upgrade
    Active
    Dept Of Defense
    The Department of Defense, specifically the Department of the Air Force, is soliciting proposals for an Audio Video Upgrade at Keesler Air Force Base in Biloxi, Mississippi. The project aims to enhance the audiovisual systems in Building 6732, requiring contractors to provide comprehensive services including equipment supply, installation, and training for personnel on system operations. This upgrade is crucial for improving communication capabilities during online meetings and ensuring that the systems operate independently from the Air Force Network (AFNET). Interested small businesses, particularly those that are women-owned, must submit their proposals by September 18, 2024, with inquiries directed to SrA Kristopher Kostenko at kristopher.kostenko@us.af.mil or by phone at 228-377-8596.
    Highline Docks
    Active
    Dept Of Defense
    The Department of Defense, specifically the Department of the Air Force, is seeking quotations for the procurement of highline docks, with a focus on small business participation under a Total Small Business Set-Aside. The solicitation requires offerors to provide new highline docks that meet specific load capacity and dimensional criteria, to be delivered to Fort Bliss, Texas, and Tyndall Air Force Base, Florida. This procurement is critical for supporting military logistics and operations, ensuring the efficient handling of cargo. Interested vendors must submit their proposals by 12:00 p.m. Eastern Time on September 20th, 2024, and are encouraged to direct any inquiries to SrA Gage Garfin at gage.garfin@us.af.mil.
    B267 Expand Hazardous Waste Facility
    Active
    Dept Of Defense
    The Department of Defense, specifically the Department of the Air Force, is soliciting bids for the expansion of the hazardous waste storage facility at Columbus Air Force Base in Mississippi. The project involves site preparation, foundation laying, construction of block walls, installation of a roof, and the addition of safety features such as explosion-proof electrical equipment and fire protection systems. This expansion is crucial for enhancing the facility's capacity to manage hazardous waste safely and in compliance with federal regulations. Interested contractors must submit their proposals by September 12, 2024, and are encouraged to attend a site visit on September 10, 2024, to better understand the project requirements. The estimated contract value ranges between $250,000 and $500,000, and inquiries can be directed to Daniel Stilts at daniel.stilts@us.af.mil or LiConstance Hayes at 14cons.pka.construction@us.af.mil.
    Construct Perimeter Security Fence
    Active
    Dept Of Defense
    The Department of Defense, specifically the Department of the Army, is seeking bids from qualified small businesses for the construction of a secondary perimeter security fence at the Tennessee Air National Guard Base in Memphis, TN. The project involves installing a 5,500-foot-long anti-climb fence, complete with multiple gates and crash-rated vehicle swing gates, to enhance base security. This construction effort is critical for maintaining the safety and integrity of military operations, with a contract value estimated between $1 million and $5 million. Interested contractors must register in the System for Award Management (SAM) and are encouraged to attend a pre-bid conference on August 28, 2024, with bids due by October 9, 2024. For further inquiries, contact Christopher Rhyne at christopher.rhyne.1@us.af.mil or by phone at 901-291-7109.
    Combined Chapel Services (Gospel Music Director/Fishbowl Coordinator/Contemporary Music Director/Lighthouse Coordinator) at Keesler Air Force Base (KAFB), Mississippi.
    Active
    Dept Of Defense
    The Department of Defense is soliciting proposals for Combined Chapel Services at Keesler Air Force Base (KAFB) in Biloxi, Mississippi, focusing on the roles of Gospel Music Director, Fishbowl Coordinator, Contemporary Music Director, and Lighthouse Coordinator. The objective is to provide ministry support services that ensure effective religious programming in a diverse environment while adhering to Air Force standards and fostering interfaith relationships. This contract, estimated at $13 million, is set to run from November 2024 through January 2029, with a total small business set-aside designation. Interested contractors should contact Erica Brown-Tanner at erica.browntanner@us.af.mil or 228-377-0492, and must submit their past performance questionnaires by September 13, 2024.
    Building 610 Fabric Doors
    Active
    Dept Of Defense
    The Department of Defense, specifically the Department of the Army, is soliciting bids for a construction contract to repair the fabric door of Building 610 at the 174th Attack Wing in Syracuse, New York. This project, identified as Project HAAW232014, is a total small business set-aside with an estimated value between $500,000 and $1,000,000, requiring bidders to utilize Assa Abloy certified technicians for the installation and maintenance of the Mega Door systems. The successful contractor will be responsible for ensuring compliance with safety and environmental regulations while completing the necessary repairs within a timeline of 270 days. Interested parties must attend a pre-bid conference on September 4, 2024, and submit their bids, which must remain valid for at least 90 days, to the primary contact, Briana McCaffery, at briana.mccaffery@us.af.mil, or by phone at 315-233-2130.