FSR 535/536 Recondition & Resurfacing - Coconino NF
ID: 127EAX26R0001Type: Solicitation
Overview

Buyer

AGRICULTURE, DEPARTMENT OFFOREST SERVICEUSDA-FS, CSA SOUTHWEST 7Albuquerque, NM, 871023498, USA

NAICS

Highway, Street, and Bridge Construction (237310)

PSC

CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS (Y1LB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)
Timeline
    Description

    The Department of Agriculture, specifically the Forest Service, is soliciting proposals for the reconditioning and resurfacing of approximately 4.00 miles of FSR 535 and the replacement of six culverts on FSR 535 and FSR 536 in the Coconino National Forest near Flagstaff, Arizona. The project aims to enhance road conditions and infrastructure, ensuring the roads maintain their intended use while adhering to federal construction standards. This initiative is crucial for maintaining access and safety within the national forest, which supports both recreational and operational activities. Interested contractors should note that proposals are due by January 9, 2026, at 15:30 local time, with an estimated project value between $250,000 and $500,000. For further inquiries, potential bidders can contact Blaine Greenwalt at blaine.greenwalt@usda.gov.

    Point(s) of Contact
    Files
    Title
    Posted
    This document, identified as 127EAX26R0001, pertains to the Coconino National Forest FSR 535/536 Road Reconditioning project. It is a Q&A log, addressing inquiries related to the project. The key information provided is that there will be no pre-bid meeting for this job. Additionally, the site is currently accessible due to recent dry and warm weather conditions. This document serves to clarify logistical details for potential bidders or interested parties regarding the project.
    This document, "127EAX26R0001 Coconino NF FSR 535/536 Road Reconditioning Q&A #2," clarifies several aspects of a road reconditioning project for the Coconino National Forest. Key points address material sourcing and processing, confirming that a rock crusher is not needed for road aggregate from the Forest Service pit and that pit run material is unavailable. Site maps are referenced as being in the solicitation plans. Culvert replacement details specify sizes (18", 24", 30") and emphasize field verification of lengths, with the contractor responsible for purchasing them. The Forest Service will not require third-party compaction testing; compliance will be based on specified methods and government inspection. Water for aggregate processing is not required, but if needed, Flagstaff is the closest source. Surface course aggregate is unsuitable for culvert bedding or backfill. Finally, turnarounds are permitted in pre-disturbed areas, with the contractor responsible for repairing any damage.
    The Coconino National Forest's FSR 535/536 Road Reconditioning project, identified as 127EAX26R0001, addresses contractor inquiries regarding equipment and environmental requirements. The Forest Service clarifies that while surfacing material is government-furnished at the Big Draw Pit, contractors are responsible for providing all necessary equipment for loading and other contract items. Additionally, the government confirms that a Stormwater Pollution Prevention Plan (SWPPP) or other erosion control measures are not required for this contract. This decision is based on the area being pre-disturbed and the project's intent to maintain the road's original purpose.
    This government Request for Proposal (RFP) (Solicitation No. 127EAX26R0001) outlines a construction project to recondition and resurface approximately 4.00 miles of FSR 535 and replace six culverts on FSR 535 and FSR 536 in the Coconino National Forest near Flagstaff, Arizona. The project, estimated between $250,000 and $500,000, also includes optional work items for an additional 1.41 miles on FSR 535. The contractor must commence work within 10 calendar days of receiving the notice to proceed and complete the project within 180 days. All work must adhere to the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-14) and Forest Service Supplemental Specifications (FSSS). Proposals are due by January 9, 2026, at 15:30 local time, and will result in a single firm-fixed price contract. The RFP also details numerous FAR and AGAR clauses, including Buy American Act requirements, insurance coverage, and various certifications and representations required from offerors.
    The document contains digital signatures from Raymond Holt, dated August 6, 2025, and Danny Montoya, dated August 7, 2025. These signatures indicate formal approval or acknowledgment within a government file, likely related to federal government RFPs, federal grants, or state and local RFPs. The presence of these dated digital signatures suggests a formalized process of authorization and record-keeping within a governmental context.
    The project "0304 Q4 CON ENG FRD FSR 535/536 Recondition & Resurfacing NEW OUT-Timber Sales Roads Prep" outlines a comprehensive road reconditioning and resurfacing effort for Forest Service Roads (FSR) 535 and 536 in the Flagstaff Ranger District. The project includes base work with mobilization, roadway reconditioning, and the application of government-sourced aggregate surface course from Big Draw Pit at specified depths. Additionally, the base work involves culvert improvements, including loading, hauling, and spreading structural backfill to ensure adequate cover, and the removal and replacement of various sizes of culverts (18", 24" squash, and 30") with new galvanized culverts. Temporary traffic control is also a component of the base work. The project further includes two options, Option A and Option B, each detailing additional roadway reconditioning and aggregate surface course application for FSR 535. The solicitation provides estimated quantities for each pay item, categorized by base work and options, to facilitate bidding and project execution.
    The US Department of Agriculture (USDA) Statement of Work outlines a project for reconditioning and resurfacing approximately 4.00 miles of FSR 535 and replacing six culverts on FSR 535 and FSR 536 in the Coconino National Forest, Flagstaff Ranger District, Arizona. Optional work includes an additional 1.41 miles on FSR 535. The project involves redefining ditch lines, shoulders, roadbeds, and aggregate surfaces using government-sourced crushed aggregate from Big Draw Pit. Commercial sources will supply bedding material and structural backfill. All work must adhere to the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-14) and Forest Service Supplemental Specifications (FSSS). Key deliverables include a Traffic Control Plan, Equipment Mobilization Notification, Contractor Quality Control Plan, weekly status reports, and commercial material source specifications.
    Lifecycle
    Similar Opportunities
    Coconino Portal Sign Installation
    Agriculture, Department Of
    The Department of Agriculture, specifically the Forest Service, is seeking qualified contractors for the Coconino Portal Sign Installation project, which involves the removal and disposal of existing portal signs and bases, construction of new bases, and installation of government-furnished signs at eight designated sites across the Coconino National Forest in Arizona. This project is crucial for enhancing the visibility and accessibility of the forest's signage, thereby improving visitor experience and safety. The contract is set aside for small businesses, with an estimated value between $25,000 and $100,000, and bids are due by email no later than 1:00 pm CDT on January 23rd, 2026. Interested contractors should contact Troy A. McCullough at troy.mccullough@usda.gov for further details and are encouraged to attend a site visit on January 6th, 2026, with questions due by January 12th, 2026.
    Dutton Hill G-Z Stewardship IRSC - R3 Coconino National Forest, Flagstaff Ranger District, Arizona
    Agriculture, Department Of
    The Department of Agriculture, specifically the U.S. Forest Service, is soliciting proposals for the Dutton Hill G-Z Stewardship Integrated Resource Service Contract (IRSC) within the Coconino National Forest, located in Flagstaff, Arizona. This project aims to enhance forest health and reduce wildfire risks across approximately 8,829 acres through mechanical and hand thinning, while also providing timber products to local industries. The contract will encompass mandatory and optional work activities in three treatment areas: Double Springs, Dutton Hill, and LO Pocket, with a firm, fixed-price structure and a performance period extending until November 30, 2029. Interested contractors must register in the System for Award Management (SAM) and submit their proposals by January 14, 2026, with further inquiries directed to Joshua Bahling at joshua.bahling@usda.gov or Jacob Dahlin at jacob.dahlin@usda.gov.
    New Mexico Forest Engineering and Road Maintenance (FERM)
    Agriculture, Department Of
    The Department of Agriculture, specifically the Forest Service, is soliciting proposals for the New Mexico Forest Engineering and Road Maintenance (FERM) project, aimed at road maintenance and construction within the New Mexico National Forest areas, including the Carson, Cibola, Gila, Lincoln, Santa Fe, and Kiowa Forests. The procurement seeks to establish Blanket Purchase Agreements (BPAs) for various services, including construction, emergency work, and complex maintenance tasks, with a strong emphasis on sustainable practices and compliance with federal regulations. This initiative is crucial for maintaining infrastructure and supporting environmental stewardship in national forests, ultimately benefiting local communities and ecosystems. Interested vendors, particularly small businesses, are encouraged to submit their proposals, with inquiries directed to Chad A.T. Bullock at chad.bullock@usda.gov or Joey Korst at joseph.korst@usda.gov, as the solicitation remains open for continuous submissions.
    Kimball Creek Culvert Replacement FR-304
    Agriculture, Department Of
    The U.S. Department of Agriculture's Forest Service is seeking proposals from qualified small businesses for the replacement of the Kimball Creek Culvert on Forest Road 304 in Grand Marais, Minnesota. The project involves comprehensive tasks including the demolition of the existing culvert, installation of a new structural plate arch, traffic control, and environmental protection measures, particularly as Kimball Creek is a designated trout stream requiring specific work timing between June 30th and September 15th. This procurement is a Total Small Business set aside, with an estimated project value between $1 million and $5 million, and proposals are expected to be submitted following the solicitation release on or about January 5, 2026. Interested vendors should contact Michelle Reed at michelle.r.reed@usda.gov for further details and ensure they are registered in the Systems for Awards Management (SAM) prior to proposal submission.
    ID FS NEZPR117 221(1), National Forest Service System Road 221 Rehabilitation
    Transportation, Department Of
    The Department of Transportation, specifically the Federal Highway Administration, is preparing to solicit bids for the rehabilitation of National Forest Service System Road 221 (ID FS NEZPR117 221(1)) located in Idaho County, Idaho. This project encompasses a comprehensive 29.7-mile rehabilitation effort, which includes pavement preservation, repair, subexcavation, and drainage improvements, with a tentative completion date set for Fall 2026. The estimated contract value ranges from $10 million to $20 million, and proposals will be accepted from a select group of six prime contractors as part of a Multiple Award Task Order Contract (MATOC) for the region. Interested vendors can obtain further details and preliminary plans by contacting the Contracts G. Office at wfl.contracts@dot.gov or by phone at 360-619-7520, with the solicitation expected to be released in Winter 2025/2026.
    Forest Service - Groveland Storm Damage Repair
    Agriculture, Department Of
    The U.S. Department of Agriculture, through the Forest Service, is soliciting proposals for the Groveland Storm Damage Repair project located in the Stanislaus National Forest, California. This total small business set-aside contract, valued between $500,000 and $1,000,000, aims to repair landslides on two Forest roads, involving tasks such as constructing retaining structures, re-establishing road prisms, resurfacing, and implementing erosion control measures. The project is critical for restoring access and safety to the affected areas following damage from severe weather events in 2023. Proposals are due by January 12, 2026, at 11:00 AM PDT, with a mandatory site visit scheduled for January 6, 2026. Interested contractors should direct inquiries to Tanya Torres at tanya.torres@usda.gov and are required to adhere to various performance and bonding requirements throughout the project duration.
    Kimball Creek Culvert Replacement FR-304
    Agriculture, Department Of
    The U.S. Department of Agriculture's Forest Service is seeking proposals from qualified small businesses for the replacement of the Kimball Creek Culvert on Forest Road 304 in Grand Marais, Minnesota. The project involves comprehensive tasks including the demolition and removal of the existing culvert, installation of a new structural plate arch, traffic control, and environmental protection measures, particularly as Kimball Creek is a designated trout stream requiring specific work timing between June 30th and September 15th. This procurement is a Total Small Business set aside, with an estimated project value between $1 million and $5 million, and proposals are expected to be submitted following the solicitation release on or about January 7, 2026. Interested vendors should contact Michelle Reed at michelle.r.reed@usda.gov for further information and ensure they are registered in the Systems for Awards Management (SAM) at www.sam.gov.
    ID BOR SRAO TCROWN(1), Crown Point Trail and Parking Area
    Transportation, Department Of
    The Department of Transportation, through the Federal Highway Administration, is seeking qualified contractors for the Crown Point Trail and Parking Area project (ID BOR SRAO TCROWN(1)) located in Valley County, Idaho. The project involves trail construction, resurfacing, slope repair, and paving over a length of 2.7 miles, with an estimated price range between $700,000 and $2,000,000, and a tentative completion date set for Fall 2026. This initiative is part of the Idaho, Montana, and Surrounding Areas Multiple Award Task Order Contract (MATOC) and emphasizes accessibility and environmental protection in compliance with federal standards. Interested vendors must register on SAM.gov to access the Interested Vendors List and are encouraged to monitor the site for solicitation documents expected to be released in early Spring 2026. For inquiries, contact the Contracts G. Office at WFL.contracts@dot.gov or call 360-619-7520.
    WA ERFO FS MTBKR605 2022-1(3), Mt. Baker – Forest Road 11 MP 23.9 Repair
    Transportation, Department Of
    The Department of Transportation, through the Federal Highway Administration, is seeking contractors for the emergency repair of Forest Road 11 at Mile Post 23.9 in the Mt. Baker-Snoqualmie National Forest, located in Whatcom County, Washington. The project involves critical roadway repairs, including subexcavation, aggregate surfacing, and the installation of root-wad/riprap embankments, aimed at addressing a significant roadway failure. This infrastructure repair is essential for maintaining safe access and environmental protection within federal lands. The estimated contract value ranges from $700,000 to $2,000,000, with a tentative solicitation date set for Winter/Spring 2025 and a completion deadline by Fall 2026. Interested parties can direct inquiries to the Contracts G. Office at wfl.contracts@dot.gov or by phone at 360-619-7520.
    White Sage Aerial Seeding
    Agriculture, Department Of
    The Department of Agriculture, specifically the Forest Service, is seeking contractors for an aerial seeding project covering 950 acres affected by the White Sage fire in the Kaibab National Forest, Arizona. The objective is to apply a specific seed mixture to prevent the encroachment of invasive species, particularly cheatgrass, into sensitive cactus habitats, ensuring uniform coverage at a rate of 30 seeds per square foot. This project is critical for the protection of local ecosystems and requires strict adherence to quality control, safety, and environmental compliance standards. Interested parties should direct inquiries to Vincent Gulley at vincent.gulley@usda.gov or call 202-321-7822, with a deadline for questions set for December 26, 2025, at 12:30 PM EST, and an anticipated project start date in November 2025.