Regional Monitoring Center Remodeling, San Jose
ID: 19AQMM25R0005Type: Solicitation
Overview

Buyer

STATE, DEPARTMENT OFSTATE, DEPARTMENT OFACQUISITIONS - AQM MOMENTUMWASHINGTON, DC, 20520, USA

NAICS

Commercial and Institutional Building Construction (236220)

PSC

CONSTRUCTION OF OFFICE BUILDINGS (Y1AA)
Timeline
    Description

    The U.S. Department of State is soliciting proposals for the remodeling of the Regional Monitoring Center located in San Jose, Costa Rica. The project encompasses comprehensive renovations, including demolition, construction of new walls and ceilings, installation of mechanical and electrical systems, and compliance with local safety regulations. This initiative is part of a broader effort to enhance national security operations and improve public infrastructure in collaboration with local authorities. Interested contractors must submit their proposals by January 10, 2025, and can direct inquiries to Scott M. David at ScottDM@state.gov or Joonpil Hwang at hwangj2@state.gov for further details.

    Point(s) of Contact
    Scott M. David
    ScottDM@state.gov
    Joonpil Hwang
    hwangj2@state.gov
    Files
    Title
    Posted
    The solicitation document 19AQMM25R0005 is an Invitation for Bid (IFB) for the renovation of the Regional Monitoring Center located in San Jose, Costa Rica. Issued by the Office of Acquisition Management on November 6, 2024, it outlines the requirements for contractors to complete the project within 160 calendar days from the notice to proceed. The document specifies that performance and payment bonds are required within 30 calendar days of award, and offers must be submitted by December 13, 2024, at 12:00 ET. The project includes two main line items: the renovation itself, under a Firm Fixed Price contract, and DBA insurance, which is categorized as Cost Reimbursable. Detailed instructions regarding the submission of sealed bids and requirements for vendor qualifications are provided. The solicitation emphasizes compliance with all stated work requirements and the necessity for a clear acknowledgment of any amendments to the solicitation. This document illustrates the procedural and contractual frameworks surrounding federal construction projects, highlighting the importance of adherence to timelines and bonding requirements for prospective contractors. In essence, it serves as a structured guide for government procurement in construction projects aimed at enhancing functionality in government facilities.
    The document is an amendment to solicitation number 19AQMM25R0005 for the Regional Monitoring Center renovation project in San Jose, Costa Rica. Issued by the Office of Procurement Executive, the amendment provides responses to questions from potential contractors and includes two new drawings and an updated Scope of Work (SOW). Key details include a contract type of Firm Fixed Price with a performance period of 160 calendar days upon issuance of a Notice to Proceed. Additionally, a section outlines a cost-reimbursable insurance requirement. The amendment emphasizes the importance of acknowledging receipt prior to bid deadlines to avoid rejection of offers. Overall, the document reflects the procedural formalities of government contracts, ensuring clarity and transparency in the solicitation process while allowing for contractor engagement and compliance with updated requirements.
    The document is an amendment to the solicitation for the Regional Monitoring Center renovation project in San Jose, Costa Rica, identified by contract number 19AQMM25R0005. Issued by the Office of Procurement Executive, it officially extends the proposal due date from December 13, 2024, to January 10, 2025. The amendment notes that aside from this date change, all other terms and conditions of the previous documents remain intact. The document includes a summary of line items related to the contract. There are two items: (1) the renovation of the Regional Monitoring Center, which is on a firm fixed price basis and has a performance period of 160 calendar days from the notice to proceed; and (2) DBA insurance, which is cost-reimbursable and shares the same performance period. Both items carry no current pricing details, suggesting that they are awaiting proposals or estimates. Overall, this amendment serves to clarify procedural aspects of the bidding process and ensure all potential bidders have equal access to information, reflecting the transparency and regulatory requirements typical in federal procurement processes. This timely extension allows more vendors to submit offers, supporting competitive bidding and ultimately aiming for successful project execution.
    The government document 19-AQMM-25-R-0005 outlines a Request for Proposals (RFP) for the renovation of a Regional Monitoring Center in San Jose, Costa Rica. The contract is structured as a hybrid model, combining a firm-fixed price for construction and a cost-reimbursable arrangement for Defense Base Act (DBA) insurance. It details the pricing for labor, materials, equipment, and required insurance, emphasizing that all taxes except specified exemptions should be included in the contract price. The document outlines the performance requirements, including inspection and acceptance standards, project communication protocols, and necessary documentation for shipments. It mandates regular inspections, weekly and monthly progress reporting, and requirements for delivering construction milestones on time. Special clauses address incidents of excusable delays, including weather-related impacts, while stipulating strict penalties for delays not covered under these clauses. The contract specifies that all work should align with local laws and U.S. government regulations while ensuring adequate coverage through necessary insurances. Overall, this RFP serves to ensure clarity in operational expectations, regulatory compliance, and fiscal guidelines for potential contractors, facilitating an organized approach to completing the renovation project while upholding standards expected by the U.S. government.
    The document outlines the contract terms for the renovation of a Regional Monitoring Center in San Jose, Costa Rica, under the request for proposals (RFP) framework. It details the pricing structure, contract type (hybrid—firm fixed price plus cost reimbursable), and specifies all costs that must be included in the contractor's proposal. Key sections define work specifications, packaging, shipment, inspection, acceptance criteria, and the procedures for handling delays, including for inclement weather. The contract mandates the contractor to manage compliance with federal regulations and local laws, including insurance and tax relief procedures. It stipulates clear guidelines for deliverables, progress reporting, and documentation required throughout the project lifecycle, ensuring ongoing communication between the contractor and government representatives. The purpose is to ensure clarity in expectations and responsibilities, maintain compliance with federal acquisition processes, and facilitate effective project execution while adhering to regulatory frameworks. This comprehensive structure is designed to safeguard both government interests and project success.
    The US Department of State's Bureau of International Narcotics and Law Enforcement Affairs is seeking construction services for the remodeling of the Municipality of San Jose Regional Monitoring Center in Costa Rica. The project includes comprehensive renovations, including demolition, new wall construction, utility installations, interior finishes, and compliance with safety regulations. Contractors must provide qualified engineers, adhere to national construction standards, and maintain a strict Quality Control Plan. The project timeline spans 160 days, beginning with the Notice to Proceed. A Firm Fixed Price contract will be awarded, requiring detailed cost estimates and monthly performance reports. The overall objective is to enhance local capabilities in national security operations, with the contractor coordinating closely with local suppliers and authorities. This project represents a significant investment in constructing essential infrastructure for the municipality, demonstrating U.S. commitment to supporting international law enforcement and governance.
    The U.S. Department of State, through the Bureau of International Narcotics and Law Enforcement Affairs (INL), is soliciting services for the construction and remodeling of the Municipality of San Jose Regional Monitoring Center in Costa Rica. The contractor will oversee demolition, construction, installation, and compliance with strict regulations and design specifications. A qualified project manager and engineering team must be on-site throughout the process. The contract will be firm fixed price, covering all associated costs, including Defense Base Act (DBA) insurance for workers. Key tasks include constructing new walls, ceilings, and finishes, while updating existing structures, elevating access provisions, and integrating electrical and mechanical systems per local codes and international standards. Safety regulations and licensing requirements are also emphasized for contractors. The project timeline is 160 days following the Notice to Proceed, with substantial deliverables requiring thorough documentation and regular reporting on progress. By ensuring the project meets local standards and operational needs, INL aims to enhance Costa Rica's capabilities in national security operations through improved infrastructure at the facility.
    The San Jose Monitoring Center retrofit project, led by the U.S. Embassy in collaboration with Costa Rica's Ministry of Public Security, aims to upgrade existing infrastructure. The comprehensive plan encompasses detailed specifications for preliminary work, building remodeling, and mechanical systems installation. Key tasks include land clearing, excavation, and construction of new walls and restroom facilities, following strict adherence to local regulations and technical specifications. The contractor is responsible for obtaining necessary permits and ensuring compliance with quality standards through rigorous trials and tests of materials used. The document outlines general and specific task specifications, emphasizing the need for meticulous execution, cost estimation, and work coordination. With multiple construction phases requiring approval from the Contracting Officer Representative (COR), the project highlights the importance of safety measures and quality assurance during the construction process. This initiative underscores the commitment to enhancing public safety and facility functionality, aligning with government initiatives for federal infrastructure improvement and local development standards. The project reflects objective planning and execution frameworks essential for successful infrastructure enhancement.
    The document outlines an independent government cost estimation for a Regional Monitoring Center project in San Jose, Costa Rica, specifically detailing the first-floor remodeling. It includes a comprehensive breakdown of labor and material costs, with a total project cost indicated at $5,000. The cost estimation specifies various construction tasks ranging from demolition, foundation work, and concrete structures to electrical systems and air conditioning installations. Each construction task is categorized with unit costs listed, although precise labor and material costs are marked as not applicable or missing. The estimate encompasses both direct and indirect costs, including DBA costs and overhead, culminating in a total cost projection crucial for funding and project execution management. Overall, the document serves as a necessary financial foundation for securing funding through federal grants or local RFP processes for municipal improvement projects.
    The "Firm and Project Information Questionnaire" serves as a comprehensive document utilized for federal and state procurement processes. It collects essential details regarding the bidding firm, including contact information, ownership, legal representatives, project personnel, subcontractors, and suppliers. Furthermore, it requires bidders to affirm compliance with legal and regulatory requirements such as necessary licenses, insurance, and bond capabilities. The document emphasizes the importance of accurate and verifiable information, notably addressing any criminal records or political affiliations that may conflict with U.S. interests. The inclusion of a certification section, which necessitates the signature of a legal representative, reinforces the accountability of the submitting firm. This questionnaire facilitates the evaluation of potential contractors to ensure they meet the standards required for public contracts, thereby promoting transparency and integrity in the bidding process.
    The Past Performance Questionnaire (PPQ) is a document submitted as part of a Request for Proposal (RFP) process by a contractor seeking a construction services contract with the U.S. Department of State. This specific contract is aimed at the construction of a Monitoring Center in San Jose, Costa Rica. The PPQ invites assessors to evaluate the contractor's past performance in several key areas, including quality of service, management ability, quality control, subcontractor relations, and cost accuracy. Section I must be filled out by the contractor, providing details such as company information, contract number, scope of work, and performance history. Section II is for the assessor to rate the contractor's performance based on defined criteria. Ratings range from Exceptional to Unsatisfactory, with specific evaluations required for multiple aspects of performance. The questionnaire also seeks to ensure that any adverse performance issues can be addressed prior to final contract decisions. The completed PPQs are requested to be submitted to the Contracting Officer by December 1, 2024, underscoring the document’s role in assessing contractor suitability for government contracts.
    The document outlines details regarding an elevator installation project administered by the Municipalidad de San José, Costa Rica. It contains information necessary for public registry compliance, including legal identifiers such as land registry numbers and public registry citations. The file specifies that the project details have been updated recently, with modifications noted and a review date outlined for further evaluations. The elevator design and installation are crucial for municipal infrastructure, potentially enhancing accessibility and compliance with safety standards. This overview aligns with the broader context of government Requests for Proposals (RFPs) and grants aimed at improving public facilities, indicating a commitment to infrastructure development in urban areas while ensuring proper oversight and adherence to regulations.
    The document outlines the specifications and details regarding furniture procurement for the Municipalidad de San José, Costa Rica. It includes multiple furniture layouts for various areas, such as reception, meeting rooms, and administrative spaces, all indicating dimensions and materials to be used. Key specifications involve tables made of E1 grade solid particle wood with laminated PVC surfaces, structure requirements for desks and workstations, and compliance with safety and aesthetic standards. The contractor is responsible for supplying, installing, and delivering the furniture along with appropriate manuals. This procurement process aligns with government RFPs, emphasizing adherence to quality standards and local regulations. The document serves as a framework for contractors to understand the project requirements and ensure proper execution of the furniture installation project within the stipulated time frame.
    The document outlines the request for proposal (RFP) for the Municipality of San Jose Regional Monitoring Center remodeling project in Costa Rica, detailing the contractors' questions and corresponding clarifications regarding project specifications. Key topics include HVAC requirements, structural demolition particulars, and electrical system integrations. Specifics highlighted involve the inclusion of air conditioning units, requirements for the installation of emergency generators and UPS systems, and clarifications on construction materials and methodologies. The contractor must adhere to Costa Rica's construction codes and provide temporary partitions during renovation to maintain the building's operational integrity. Additional considerations include the management of project timelines due to the need for permits, debris disposal, and the maintenance of existing equipment during the upgrade. The RFP emphasizes comprehensive planning to ensure compliance with local codes and operational continuity, along with detailed accountability for various components of the construction project. The document serves as a guideline for contractors to submit proposals reflecting an understanding of the project's scope and requirements.
    The document outlines the engineering specifications and guidelines for the San Jose Monitoring Center project, focusing on structural safety and compliance with local regulations. It details the types of materials to be used, including cold-formed steel profiles and concrete blocks, emphasizing their respective strength requirements and quality standards. The construction methods include specific instructions on welding, installation of bolts, and reinforcement designs, ensuring adherence to the American Welding Society standards. Essential notes address waterproofing measures for exposed areas, drainage systems for retaining walls, and fire resistance of structural elements. Furthermore, the document delineates responsibilities for inspections and quality control throughout the construction process. It mandates thorough checks for all materials, specific torque requirements for bolts, and strict follow-ups on structural integrity through inspections. The overall objective is to provide detailed instructions to contractors for ensuring a robust and compliant construction workflow, thus mitigating risks and enhancing safety during and after project completion. This document serves as an essential reference in the context of government contracts and regulations guiding public infrastructure projects.
    The document outlines a project for the remodeling of the Monitoring Center of the Municipality of San José, overseen by engineers from Estruc Consultores en Ingeniería. This initiative, part of a Cooperation Program between the U.S. Government and Costa Rica, focuses on upgrading the facility in line with contemporary standards. Key elements of the project include the demolition of existing structures, construction of new walls and ceilings, installation of elevated flooring, and mechanical enhancements. Architectural plans detail the distribution of spaces, structural reinforcements, and proposed finishes, emphasizing the intent to modernize without compromising the building's integrity. The comprehensive documentation includes specific scales for plans and sections, a table of demolished areas, and technical specifications for diverse elements such as plumbing, windows, and insulation. This remodeling aims to enhance operational efficiency and safety, reflecting a commitment to sustainable development as part of local infrastructure improvements.
    The document contains detailed architectural and engineering plans for renovations at various locations managed by the Municipality of San José. Key focuses include elevator specifications, expanded bathrooms, and furniture arrangements in several areas like reception, dining, and monitoring rooms, all adhering to specific technical standards. The summaries also provide information on necessary modifications for accessibility compliance, referencing relevant legal frameworks such as Law 7600. The document outlines the dimensions, materials, and design specifications for furniture, ensuring ergonomic considerations and durability for heavy use. Moreover, it details sanitary facilities, kitchen layouts, and safety measures, including fire alarm system installations and evacuation routes. Overall, the plans underscore the municipality’s commitment to upgrading public infrastructure while ensuring compliance with health and safety regulations. This aligns with government initiatives to enhance community facilities and public service efficiency.
    The document outlines the electrical and fire safety plans for the San Jose Monitoring Center, focusing on modifications scheduled for May 2024. It details the electrical distribution layouts, lighting plans, and emergency systems, providing specifications for various components such as emergency exit luminaires, lighting fixtures, and power outlets. Essential equipment includes LED lights, emergency lamps with specific lux performance, and a range of electrical outlets and switches, all compliant with safety standards. It emphasizes that all installations and final connections should be completed by the contractor, ensuring adherence to UL listed protocols. The document serves as a comprehensive guide for contractors involved in the project to facilitate safe electrical installations and effective fire detection systems, reflecting the government's commitment to enhancing operational safety and regulatory compliance in public constructions.
    The document outlines technical specifications for the mechanical and plumbing systems to be implemented at the San Jose Monitoring Center in Costa Rica. It includes detailed plans for mechanical distribution, plumbing layouts, and guidelines for the installation of wastewater drainage systems using PVC materials, along with relevant dimensions and design considerations. The contractor is expected to manage excavation and repairs for connecting to the existing potable water network and to construct concrete manhole boxes to minimize odors. The document emphasizes the need for compliance with safety and engineering standards while executing the planned modifications. Overall, the file serves as a technical guide for bidders responding to a Request for Proposal (RFP), detailing the scope of work and required infrastructure adjustments necessary for the modernization of the facility.
    Lifecycle
    Similar Opportunities
    Siquirres Community Center Renovation, Costa Rica
    Active
    State, Department Of
    The U.S. Department of State is seeking qualified contractors for the renovation of the Siquirres Community Center in Costa Rica, under Solicitation No. 19AQMM25R0004. The project involves extensive remodeling, including the construction of new facilities such as a community hall, dance/martial arts room, and outdoor recreational areas, with a firm-fixed-price contract structure and a performance period of 120 days from the notice to proceed. This initiative aims to enhance local infrastructure and community engagement, reflecting the U.S. government's commitment to improving public services abroad. Interested contractors must submit their proposals by January 10, 2025, and can direct inquiries to Scott M. David at ScottDM@state.gov or Joonpil Hwang at hwangj2@state.gov.
    INL Colombia Construction IDIQ
    Active
    State, Department Of
    The U.S. Department of State is seeking qualified contractors for the INL Colombia Construction Indefinite Delivery Indefinite Quantity (IDIQ) contract, aimed at supporting various construction projects in Colombia. The procurement encompasses the construction of administrative, lodging, and utility facilities, with a total potential value of up to $50 million, structured over a base year and four option years. This initiative is crucial for enhancing operational infrastructure in support of U.S. law enforcement efforts abroad, ensuring compliance with local regulations and safety standards. Interested contractors must submit their proposals by February 21, 2025, and can direct inquiries to Scott M. David at ScottDM@state.gov or Joonpil Hwang at hwangj2@state.gov.
    Demolition & Construction of New Boundary Wall- LOCHAB Phase Two
    Active
    State, Department Of
    The U.S. Department of State is preparing to solicit bids for the demolition and construction of a new boundary wall as part of phase two for the LOCHAB residence in Nairobi, Kenya. This project aims to enhance the security and integrity of the U.S. Embassy's residential facilities, with an anticipated construction period of 120 days upon contract award. The contract will be a firm fixed price type, and all responsible sources are encouraged to submit quotations, as the government may award the contract based on initial offers without further discussions. Interested contractors must register in the System for Award Management (SAM) prior to submitting proposals, and they can contact Leslie Marks at marksLE@state.gov or Eric Kamau at KamauEM@state.gov for further information. The solicitation will be posted on SAM.gov when available, and a pre-quotation conference will be scheduled, with details provided in the solicitation.
    Security grills for one residence.
    Active
    State, Department Of
    The U.S. Department of State, through the U.S. Embassy in San Salvador, is seeking quotations for the installation of security grills at a residence located in Cumbres de Cuscatlan, El Salvador. Interested contractors are required to submit sealed electronic quotations in accordance with the detailed instructions provided in the solicitation package, which emphasizes compliance with local laws and federal regulations. This procurement is crucial for enhancing the security of the residence, ensuring that all personnel involved meet safety standards and undergo necessary security checks. Key deadlines include a site visit scheduled for December 20, 2024, and the submission of quotes by January 2, 2025, at 4:00 PM local time. For further inquiries, contractors may contact Julio Gochez at Gochezje@state.gov or Ana Beatriz Coto at CotoAB@state.gov.
    Amended Residential Building Renovation _ Windows & Bars Replacement and Exterior Works
    Active
    State, Department Of
    The U.S. Department of State, through the U.S. Embassy in Monrovia, Liberia, is seeking qualified contractors for the amended solicitation titled "Residential Building Renovation - Windows & Bars Replacement and Exterior Works." The project involves replacing existing aluminum windows and window bars at a residential facility, along with additional tasks such as external painting services and the provision and installation of roofing gutters. This renovation is crucial for maintaining the integrity and functionality of the embassy's residential properties, ensuring a safe and comfortable living environment. Interested bidders must submit their proposals by January 13, 2025, following a site visit on December 27, 2024, and are encouraged to contact Monroviabids@state.gov for further inquiries.
    Construction Inspection Services for the Chief of Mission Residence
    Active
    State, Department Of
    The U.S. Department of State, through the U.S. Embassy in Pristina, is soliciting quotes for Construction Inspection Services for the Chief of Mission Residence in Kosovo. The primary objective of this procurement is to ensure quality control and oversight of construction activities, including supervising work, reviewing submittals, addressing Requests for Information (RFIs), conducting site visits, and producing inspection reports. This contract, set aside for small businesses, is crucial for maintaining compliance with local building codes and standards while ensuring the safety and quality of U.S. Government facilities. Quotations are due by January 10, 2025, at 12:00 local time, and must be submitted electronically to PristinaProcurement@state.gov. Interested offerors must also provide proof of registration in the System for Award Management (SAM) and complete several required documents to be considered for this opportunity.
    Amended Residential Renovation and Electrical Upgrade
    Active
    State, Department Of
    The U.S. Embassy in Monrovia, Liberia, is seeking qualified contractors for a comprehensive residential renovation and electrical upgrade project under solicitation number 19L16025Q0001. The project involves extensive renovations of a residential building, approximately 595.29 square meters in size, requiring carpentry, masonry, painting, plumbing, and electrical work, while ensuring compliance with safety codes and enhancing the property's value. Contractors must submit their quotes by January 6, 2025, after attending a mandatory site visit on December 17, 2024, and are required to provide a performance bond, insurance, and proof of registration with the System for Award Management (SAM). Interested parties can direct inquiries to Monroviabids@state.gov for further details.
    New CAA Annex, Nairobi, Kenya, US Embassy Compound
    Active
    State, Department Of
    The U.S. Department of State is seeking qualified contractors for the design-build construction of a new Controlled Access Area (CAA) Annex at the Embassy Compound in Nairobi, Kenya. This project, estimated to cost between $175 and $250 million, involves the construction of a six-level building that will include offices, meeting rooms, and support spaces, along with necessary site and security improvements. The initiative underscores the U.S. government's commitment to maintaining secure and functional diplomatic facilities overseas, and it is open for full and open competition. Interested contractors must submit their pre-qualification documents electronically by December 31, 2024, and should direct inquiries to primary contact Jose Vasquez at vasquezj4@state.gov or secondary contact Blondell Taylor at taylorbk2@state.gov.
    Construction Security Monitoring Services - Solicitation
    Active
    State, Department Of
    The Department of State is seeking proposals for Construction Security Monitoring Services to support the Bureau of Overseas Buildings Operations at various domestic and overseas construction sites. The contract aims to provide Site Security Personnel (SSP) to ensure the security integrity of construction sites, prevent unauthorized access, and manage the introduction of unauthorized materials. This indefinite delivery, indefinite quantity (IDIQ) contract has a minimum value of $25,000 and a maximum of $75 million, with the potential for up to two awards to small businesses. Interested contractors must hold a Top Secret Facility clearance and are encouraged to submit their proposals, including past performance questionnaires, to Contract Specialist Gloria Paul by the specified deadline.
    19AQMM25R0023 US Embassy Kampala CAA Renovation Notice of Solicitation of Submissions for Contractor Pre-Qualification
    Active
    State, Department Of
    The U.S. Department of State is soliciting pre-qualification submissions for Design-Build Construction Services aimed at renovating and expanding the Controlled Access Area (CAA) at the U.S. Embassy in Kampala, Uganda. This project, valued between $90 million and $115 million, requires firms to possess Secret facility and personnel clearances, as well as a robust project management plan that adheres to the 2023 Bureau of Overseas Buildings Operations (OBO) design standards. The renovation is critical for maintaining operational embassy functions while enhancing the quality and security of diplomatic facilities. Interested contractors must submit their qualifications electronically by January 21, 2025, and can direct inquiries to Sonja Ablola at ablolass@state.gov or Kaitlin Lockett at lockettkf@state.gov for further information.