The U.S. Army Corps of Engineers, Wilmington District, seeks proposals under solicitation number W912PM-25-B-A011 for a project aimed at preventing streambank erosion at the Greenville Utilities Commission. The project involves the installation of riprap along a 400-linear foot section of the Tar River’s east streambank, adjacent to water intake structures. This includes the removal and grading of existing embankment protection, followed by riprap placement at a specified slope. A filter system consisting of a 6-inch layer of stone on geotextile fabric will support the riprap. The contract, which will be a Firm Fixed Price and a 100% Small Business Set-Aside, has a construction magnitude between $1 million and $5 million. The solicitation will be available electronically starting approximately June 10, 2025, with no hard copies provided. Bidders must register in the System for Award Management (SAM) for eligibility and can find further details through designated contact persons. This contract falls under NAICS code 237990, focusing on heavy and civil engineering construction.
This document serves as an amendment to a federal government solicitation, specifically altering Solicitation Number W912PM25BA011. The purpose of the amendment includes extending the deadline for receipt of offers, which must be acknowledged by the submitters to avoid potential rejection. Additionally, the amendment allows for changes to previously submitted offers and includes administrational modifications, such as updated drawings and a site visit sign-in sheet. The document maintains that all other terms and conditions remain unchanged and in full force. It is issued by the Army Corps of Engineers and includes contact details for the contracting officer, reinforcing transparency and communication during the solicitation process. The overall focus is on facilitating the solicitation process while ensuring compliance with federal regulations and preserving document integrity.
The Greenville Utilities Commission CAP 14 Bank Stabilization Project seeks to address necessary improvements in bank stabilization along the Tar River in Greenville, North Carolina, as outlined in Solicitation # W912PM25BA011 dated July 15, 2025. The amendment notes that there are no changes to the project specifications, but updates have been made to the site map (GI02), specifically reflecting changes in sheet references within the notes. The document highlights important features such as limited work areas, including a staging area and a spoil/borrow area, with strict restrictions against work within designated wetland areas. Geographical data is included, indicating construction work limits and the project's designated boundaries. The summary indicates the project aims to stabilize the river bank effectively while maintaining compliance with environmental regulations. This initiative demonstrates the government's commitment to enhancing the ecological integrity of urban waterways.
The document presents an abstract of bids responding to a solicitation by the U.S. Army Corps of Engineers for projects related to the Greenville Utilities Commission under the Continuing Authorities Program (CAP 14 - GUC). The file includes details on issued solicitation numbers, dates, and an overview of bidders.
Three line items are listed: Mobilization and Demobilization, Greenville Erosion Protection Project, and Performance and Payment Bonds, each with specified costs from different bidders. Bid amounts include $14,482 for mobilization, $1,709,847 for erosion protection, and $15,258 for bonds from one offeror, while another bidder presented higher amounts. For each contractor, the document details bid security type and amounts, amendments acknowledged, and certifications.
Overall, this summary reflects key aspects of the bidding process for federal projects, including adherence to regulations, competitive bidding, and the financial implications of proposed contracts. The purpose is to provide a transparent account of bids and facilitate decision-making in project procurement.