ContractSpecial NoticeTotal Small Business Set-Aside (FAR 19.5)

USCGC Henry Blake CO2 System repair

DEPARTMENT OF HOMELAND SECURITY 70Z08525Q0020719
Response Deadline
Aug 11, 2025
Deadline passed
Days Remaining
0
Closed
Set-Aside
Total Small Business Set-Aside (FAR 19.5)
Notice Type
Special Notice

Contract Opportunity Analysis

The Department of Homeland Security, specifically the U.S. Coast Guard, is seeking qualified contractors to perform repairs on the CO2 fire suppression system aboard the CGC Henry Blake. The primary objective is to replace failed time delays in the CO2 systems located in the Engine Room, Emergency Diesel Generator Room, and Paint Locker, ensuring compliance with the required 60-second delay for annual certification. This maintenance is critical for the operational safety of the vessel and adherence to fire safety regulations. The work is scheduled to take place from August 11 to August 15, 2025, at NAVSTA Everett, with contractors required to follow strict security protocols. Interested parties can contact Justin Wooldridge at justin.r.wooldridge2@uscg.mil or 206-820-5327 for further details.

Classification Codes

NAICS Code
336611
Ship Building and Repairing
PSC Code
J020
MAINT/REPAIR/REBUILD OF EQUIPMENT- SHIP AND MARINE EQUIPMENT

Solicitation Documents

1 Files
CO2 SOW Henry Bake.pdf
PDF56 KB8/7/2025
AI Summary
This Scope of Work (SOW) outlines the replacement of failed time delays on CO2 fire suppression systems aboard the CGC Henry Blake, specifically in the Engine Room, Emergency Diesel Generator (EDG) Room, and Paint Locker. The purpose is to ensure the systems meet the required 60-second delay for annual certification. Two qualified technicians will perform the replacement, provide necessary materials, and conduct retesting. The work is scheduled for August 11-15, 2025, at NAVSTA Everett. DC2 Zurcher will coordinate, oversee, and verify the work, while contractors are responsible for labor, materials, retesting, and documentation. The system must be fully operational with a verified 60-second delay. Contractors must adhere to NAVSTA Everett's security protocols, including identification checks and escort procedures. Post-installation, DC2 Zurcher will monitor performance. All technicians must be certified, and the ship’s firefighting doctrine will be updated during maintenance.

Related Contract Opportunities

Project Timeline

postedOriginal Solicitation PostedAug 7, 2025
deadlineResponse DeadlineAug 11, 2025
expiryArchive DateAug 26, 2025

Agency Information

Department
DEPARTMENT OF HOMELAND SECURITY
Sub-Tier
US COAST GUARD
Office
SFLC PROCUREMENT BRANCH 2(00085)

Point of Contact

Name
Justin Wooldridge

Place of Performance

Everett, Washington, UNITED STATES

Official Sources