The Department of Homeland Security, specifically the U.S. Coast Guard, is seeking qualified contractors to perform repairs on the CO2 fire suppression system aboard the CGC Henry Blake. The primary objective is to replace failed time delays in the CO2 systems located in the Engine Room, Emergency Diesel Generator Room, and Paint Locker, ensuring compliance with the required 60-second delay for annual certification. This maintenance is critical for the operational safety of the vessel and adherence to fire safety regulations. The work is scheduled to take place from August 11 to August 15, 2025, at NAVSTA Everett, with contractors required to follow strict security protocols. Interested parties can contact Justin Wooldridge at justin.r.wooldridge2@uscg.mil or 206-820-5327 for further details.