The Department of Veterans Affairs (VA) has issued a presolicitation notice for Project 565-24-113,
This government solicitation, 36C24626B0004, issued by the Department of Veterans Affairs, is an Invitation for Bid (IFB) for the replacement of a 120-ton auxiliary chiller and two 250 gpm pumps at Building 3 of the Fayetteville VAMC. The project, designated 565-24-113, is a Total SDVOSB Set-Aside with a construction magnitude between $250,000 and $500,000. Key dates include a site visit on December 23, 2025, questions due by January 2, 2025, and sealed bids due by January 26, 2026. Bids must be emailed to Michael.Proctor2@va.gov. A virtual bid opening is scheduled for January 27, 2026. The scope of work requires integration with the existing Building Automation System and adherence to VA master specifications and safety regulations. Offerors must provide a bid guarantee, proof of SDVOSB certification, and complete various certifications including those related to Arms Control Treaties and Buy American requirements. The document also includes wage determinations for North Carolina Statewide Heavy Dredging, outlining minimum hourly rates and benefits for various classifications, subject to Executive Orders 14026 or 13658.
The Department of Veterans Affairs, Network Contracting Office 6, issued a Sources Sought Notice (36C24626B0004) for market research to identify qualified vendors. The project involves removing and replacing a 120-ton auxiliary chiller at Building 3 of the Fayetteville Veterans Affairs Medical Center, along with two 250 gpm pumps in an adjacent mechanical room. The scope includes installing new piping, valves, supports, controls, and integrating the new chiller with the existing Building Automation System (BAS) to ensure chilled water redundancy. The anticipated Magnitude of Construction is between $250,000 and $500,000, with a six-month period of performance. The NAICS code is 238220 ($19.0 million size standard). Responses are due by October 22, 2025, at 3:00 PM EDT, via email to Michael.Proctor2@va.gov. The notice emphasizes potential set-asides for Service-Disabled Veteran-Owned Small Businesses (SDVOSBs) or Veteran-Owned Small Businesses (VOSBs), requiring compliance with specific VAAR clauses. Interested firms must provide company details, SAM registration, capabilities, bonding capacity, socio-economic size, and address specific project questions.
The provided file contains contact information for Eaton, specifically a phone number, fax number, and a website address (www.eaton.com/energysolutions.com). This information is typical for a business entity and would likely be found in government RFPs, federal grants, or state and local RFPs as a point of contact for inquiries, submissions, or general information related to Eaton's energy solutions offerings.
This government file, Project No. 565-24-113, outlines the specifications for replacing the auxiliary chiller in Building 3 at the Fayetteville, NC VAMC. It details general requirements, safety protocols, and administrative procedures for contractors. Key aspects include comprehensive safety plans (Accident Prevention Plan and Activity Hazard Analyses), strict security measures for personnel, documents, and site access, and detailed guidelines for site operations, material storage, and utility management to ensure continuous Medical Center functioning. The document also covers submittal requirements for shop drawings, product data, and samples, emphasizing compliance, review processes, and contractor responsibilities for accuracy. Warranty management, testing procedures, and the provision of operating manuals and training for VA personnel are also critical components, highlighting the stringent standards for this federal government RFP to ensure project success and facility safety.