This Statement of Work (SOW) outlines requirements for a customized machine base and supplemental weldments for cannon manufacturing process equipment. The project encompasses the design, fabrication, test fitment, shipping, installation, and training for a machine base capable of handling workpieces between 2500 mm and 6750 mm in length, 80 mm and 350 mm in outer diameter, and up to 2250 kg in weight. Key requirements include specific axis definitions (X, Y, Z, C, U, W), detailed specifications for various operating sub-systems (e.g., Chuck Spindle, Main Barrel Collar Clamp, Laser Measurement), and precise machine base dimensions (e.g., bed length 18000/18250 mm, width 2000 mm). The base must incorporate primary and secondary linear motion guide rails (e.g., SCHNEEBERGER MONORAIL) with integrated absolute position scales, helical gear racks, and a riser weldment. The contractor is responsible for site preparation, rigging, installation, startup, testing, and providing a minimum one-year warranty. Benet Laboratories will provide technical data and drawings. Delivery is expected within 38 weeks to the Watervliet Arsenal.
This Statement of Work outlines requirements for a customized machine base and weldments for cannon manufacturing process equipment. The project encompasses the main base, pedestal, mounting braces, motion guides, gear racks, and automation component anchoring points. Key requirements include specific workpiece characteristics (2500-6750mm length, 80-350mm diameter, max 2250kg weight) and precise axis definitions (X, Y, Z, C, U, W). The machine base must accommodate various sub-systems, including a 3500kg Chuck Spindle, 1300kg Main Barrel Collar Clamp, and 6000kg Process Application Sub-System. Machine base specifications include a bed length of 18000-18250mm, width of at least 2000mm, and a height of 525-750mm, with specific linear guide and helical gear rack details. The contractor is responsible for site preparation, rigging, installation, startup, testing, and training, while the Watervliet Arsenal will designate the site and provide utilities. Benet Laboratories will supply technical data and 3D models. The contractor must provide a one-year warranty, with final acceptance at Watervliet Arsenal. Delivery is expected within 38 weeks.
This government solicitation, W911PT26QA006, issued by the ACC Watervliet Arsenal, seeks bids for a customized machine base for cannon manufacturing process equipment. The acquisition is a Firm Fixed Price contract, with proposals due by December 1, 2025. Offerors must provide a complete submission, including technical documentation such as product literature and an itemized quote for CLIN 0001, to Amanda Robinson via email. The award will be based on the lowest evaluated bid that meets all solicitation and responsibility criteria, with no discussions anticipated. The document details extensive clauses covering small business utilization, anti-discrimination, foreign procurement restrictions, and prohibitions on specific telecommunications equipment and software from entities like Kaspersky Lab and ByteDance (TikTok). It also outlines delivery requirements, contractor responsibilities for security and information release, and payment procedures, emphasizing strict adherence to quality and delivery schedules for the Watervliet Arsenal.
The document is an amendment to Solicitation Number W911PT26QA006, issued by ACC Watervliet Arsenal, modifying a previous solicitation dated October 29, 2025. The amendment, dated November 25, 2025, incorporates Revision B of the Statement of Work and extends the response due date for offers to December 8, 2025, at 4:00 PM. The primary change detailed in the amendment is the modification of CLIN 0001, which now specifies a "Customized Machine Base for Cannon Manufacturing Process Equipment and Installation per Benet Labs Equipment Engineering Statement of Work (Attachment 0001) Revision B dated 25 November 2025." Offerors must acknowledge receipt of this amendment to ensure their offers are considered valid.