Planning, Design and Fabrication for Hot Springs N
ID: 140P2124R0035Type: Combined Synopsis/Solicitation
Overview

Buyer

INTERIOR, DEPARTMENT OF THENATIONAL PARK SERVICEHARPERS FERRY CENTER(1100)HARPERS FERRY, WV, 25425, USA

NAICS

Custom Architectural Woodwork and Millwork Manufacturing (337212)

PSC

CONSTRUCTION OF EXHIBIT DESIGN (NON-BUILDING) (Y1PB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)
Timeline
    Description

    The Department of the Interior, through the National Park Service, is seeking proposals from qualified small businesses for the planning, design, and fabrication of exhibits at Hot Springs National Park in Arkansas. The project aims to develop both indoor and outdoor exhibit elements that reflect the park's geothermal springs, historical significance, and cultural heritage, ensuring compliance with federal accessibility standards throughout the process. This initiative is crucial for enhancing visitor engagement and education, as the park is recognized for its unique natural resources and historical context as the first federally protected hot springs site in the U.S. Interested contractors must submit their proposals electronically by September 11, 2024, with questions due by August 28, 2024. For further inquiries, contact Shelia Bender at Dee_Dee_Bender@nps.gov or by phone at 304-535-6227.

    Point(s) of Contact
    Files
    Title
    Posted
    The Wind Cave project, led by Harpers Ferry Center, focuses on planning and designing a museum exhibit that enhances visitor experiences. The project encompasses various elements, including scenes, content groups, structures, and custom exhibits, to create an engaging narrative around the Wind Cave National Park. Key components of the planning include the organization of scenes and associated elements such as lighting systems, graphic layouts, images, and electronic programs. Notable scenes within the exhibit comprise a Welcome and Reception area, Visitor Center Orientation, and interpretive panels, all aimed at providing educational insights into the park's natural environment and historical context. The project also incorporates a comprehensive tracking system for the scope of work (SOW) including percent completion and quick tasks. The structure of the document outlines various forms for components such as lighting systems, graphic layouts, accessioned objects, and electronic equipment, detailing descriptions, inventory lists, and categories essential for successful exhibit development. This undertaking showcases a commitment to creating interactive and informative experiences, underlining the importance of government support in preserving and presenting natural and historical heritage through well-planned exhibits.
    The National Park Service document outlines the exhibit planning, design, and fabrication specifications for projects conducted at various national parks. It establishes a structured process divided into phases, including pre-design, schematic design, design development, production design, and installation, each with specific tasks and deliverables aimed at ensuring high-quality exhibits. Key components include project management, content development, accessibility compliance, and a focus on audience-centered experiences. The document emphasizes collaboration among multi-disciplinary teams, thorough planning, and adherence to federal accessibility standards, such as the Architectural Barriers Act Accessibility Standards (ABAAS) and the Americans with Disabilities Act (ADA). It also delineates procedures for managing travel, meetings, and quality control throughout the project lifecycle. The outlined process adheres to best practice project management strategies, ensuring that all exhibit elements are conceived, developed, and executed to enhance visitor engagement while maintaining historical accuracy and cultural relevance. Ultimately, the guidelines serve to foster effective communication and coordination between NPS and contractors, ensuring that exhibits meet both regulatory standards and the needs of diverse audiences.
    The document outlines an asset inventory cost summary for the interpretive media related to the Fordyce Bathhouse exhibits within the Valor in the Pacific National Monument, Hawaii. It includes a breakdown of elements involved, such as Wayside Panels, Structures, Cases, and Custom Elements, alongside their respective tracking numbers and descriptions. Each component's associated costs, installation details, and inventory specifics are also included, although all listed values currently reflect $0. The document serves as a guideline for entering project data into the HFC Museum Exhibit Planner and emphasizes the necessity for precise calculations within the overall budget. The structure categorizes various media assets and facilities while detailing required compliance measures for accessibility and design standards. The assessment aims to ensure organized tracking for project management and budgets, highlighting the requirement for regular updates and validation against project specifications. This summary serves as a framework for planning and executing future exhibit projects, ensuring alignment with government funding guidelines and regulations pertinent to RFPs and grants.
    The document provides a detailed cost summary and inventory for the Valor in the Pacific National Monument, focusing specifically on the exhibit development at Pearl Harbor Historic Sites, Hawaii. The total original contract price amounts to $3,692,559, covering project management, pre-production, shipping, installation, and closeout costs. The fabrication costs—including replacement costs for exhibition components—add up to $2,640,900, leading to a calculated total project cost of $3,734,900. It breaks down specific areas such as Exhibit Area 01 and Area 02, detailing individual components, quantities, and their respective costs. This summary emphasizes the meticulous planning for educational exhibits, ensuring historical accuracy while prioritizing visitor engagement, accessibility, and interactive learning experiences. The project's comprehensive nature illustrates the federal agency's commitment to preserving and interpreting significant historical sites, as part of broader initiatives for educational outreach and cultural heritage conservation.
    The document outlines the Art Documentation Form used by the U.S. Department of the Interior's National Park Service to catalog and manage artworks. Each piece of art requires its own form, detailing essential information such as the artist's name, contract price, size, medium, and any copyright restrictions. The form is crucial for entering data into the HFC Image Management System, ensuring accountability and facilitating future retrieval of artwork. Additionally, there is a Receipt for Property section which denotes personal responsibility for any property listed, emphasizing the importance of prudent care and record-keeping for public assets. The documentation process adheres to compliance or funding requirements related to federal grants or RFPs, showcasing the government's commitment to preserving art and managing resources efficiently. Proper submission of the Art Documentation Form is a prerequisite for the acceptance of artwork into the repository.
    The document outlines the completion report requirements for audiovisual productions contracted by the National Park Service (NPS). Key components include documenting the program's title, media number, total running time, completion date, and formats with accessibility features. It requires detailed descriptions including show themes, usage rights, and the restrictions on music, narration, and footage. Attachments must account for all elements such as licenses, permissions, and a comprehensive source material list in time-coded order with rights information. Specifically, Attachment B provides an example format for listing source materials, capturing thumbnails, descriptions, and permissions, crucial for utilizing archival content effectively. This report serves to ensure transparency and compliance in the use and distribution of audiovisual materials in alignment with federal regulations, emphasizing the importance of proper documentation and rights management in government-funded projects.
    The document outlines the Interpretive Media Asset Inventory for a project at Valor in the Pacific National Monument, focusing on the Fordyce Bathhouse Exhibits. It provides a structured inventory of media components, including wayside panels, bases, structures, and electronic programs, categorized by unique tracking numbers for easy reference. Each category includes descriptions, requirements, and notes pertaining to costs and materials, indicating that all entries currently reflect $0 in cost. This inventory serves as a comprehensive asset management resource, detailing essential project elements required for exhibits, including design life, accessibility compliance, and installation specifics. The project demands adherence to guidelines for fabrication and equipment tracking, ensuring effective management of procurement and budgets. Given the context of federal RFPs, this document plays a crucial role in outlining project specifications and readiness for future funding and approval processes, underscoring the importance of accountability and transparency in government-funded projects.
    The document presents a condition assessment for the Hot Springs Mountain Tower, located in Hot Springs National Park, Arkansas. It outlines the project titled "Health Conditions Assessment," which is part of the National Park Service's initiative to evaluate and potentially enhance park features. The plans include detailed layouts for various observation decks—upper and lower—alongside the main building floor plan, with specific notes on structural elements and facility features like fire extinguishers, viewing telescopes, and display areas for potential exhibits. The open-air observation deck is especially noted for its suitability for outdoor exhibits, suggesting a visitor engagement aspect in the park’s development. The document highlights the importance of assessing current conditions and planning for upgrades or changes to promote a better visitor experience while upholding safety and compliance standards. This initiative aligns with federal efforts to maintain and improve national parks through careful planning and resource allocation, which may involve RFPs and grants for implementation.
    The Hot Springs National Park Foundation Document outlines the strategic framework for the park’s management and planning, focusing on protecting its unique geothermal spring resources and promoting public health. Established in 1832 and designated a national park in 1921, it spans 5,500 acres and attracts over 1.5 million visitors annually. The document details essential components including the park’s purpose to safeguard geothermal waters, its significance as the only national park centered around health and wellness, and fundamental resources such as the thermal water system and historic Bathhouse Row. Key issues identified include the preservation of the thermal water recharge zone, management of aging water distribution infrastructure, and the future of the unoccupied Army-Navy Hospital property. Opportunities for enhancing visitor interaction with geothermal water and nature through improved facilities are also highlighted. The foundation document serves as a comprehensive guide ensuring coordinated planning efforts while addressing environmental and structural challenges, ultimately striving to maintain the park's integrity for future generations.
    The Long-Range Interpretive Plan for Hot Springs National Park outlines the National Park Service's strategies for enhancing visitor experience and education over the next five to seven years. The document emphasizes the significance of the park, which includes the preservation of its natural thermal springs and rich historical context as the first federally protected hot springs site in the U.S. Key interpretive themes include the historical importance of the hot springs, the role of Bathhouse Row as a health resort, and the ecological uniqueness of the Ouachita Range. The plan addresses improvements needed for visitor orientation and accessibility, the implementation of new technologies, and the expansion of interpretive and educational services, including partnerships with local schools. It sets a vision for the park’s interpretive goals, such as upgrading signage, enhancing interpretive media, and diversifying personal services to engage visitors meaningfully. With a commitment to inclusivity and adherence to accessibility standards, the park aims to foster connections between visitors and the significant historical and natural resources it offers. This plan acts as a comprehensive guide for managing interpretive efforts and ensuring a vibrant visitor experience while protecting the park’s unique resources.
    The document is a Cost Estimate Form related to a project that comprises various components, including project management, fabrication drawings, exhibit structures, display objects, electronic programs, graphics, conservation, shipping, installation, and travel. Each section outlines the estimated costs associated with materials and labor, all currently listed as $0.00. The form captures detailed information on labor hours, rates, and material quantities for different tasks involved in the project, with mark-ups on materials specified at 15 percent. The overall framework of the document suggests a comprehensive approach to budgeting for a project, potentially related to exhibitions or installations funded through government RFPs or grants. The emphasis on itemized costs for various project elements underscores the importance of financial planning and compliance with federal or local funding requirements. The form serves as a foundational tool for potential contractors to prepare informed bids and align with financial constraints outlined in governmental solicitations for proposal submissions.
    The "Programmatic Accessibility Guidelines for National Park Service Interpretive Media" provides a comprehensive framework aimed at ensuring that interpretive media in national parks is accessible to individuals with physical, sensory, or cognitive disabilities. The guidelines emphasize compliance with federal laws, such as the Rehabilitation Act of 1973, and outline responsibilities for superintendents in maintaining accessibility standards across park facilities and programs. The document is structured into various sections, focusing on interpretive planning, evaluation methods, and specific audiovisual and exhibit guidelines. Key topics include the necessity of integrating accessibility features from the project’s inception, utilizing universal design principles, and incorporating various media formats (e.g., captions, audio descriptions) to enhance visitor experience. Particular guidelines address physical infrastructure, including adequate signage, exhibit design, assistive listening technologies, and the incorporation of tactile and multisensory elements. Additionally, the analysis covers the importance of early visitor engagement during planning phases to identify accessibility needs effectively. Overall, this document serves as a crucial resource to enhance the accessibility of national park interpretive media, ensuring that all visitors have equal opportunities to engage with cultural and natural resources.
    The document outlines the "Content Management Data Fields Guidelines" for exhibit planning, design, and fabrication projects within the National Park Service (NPS). Its primary objective is to provide a structured approach for contractors to manage and document various exhibit elements through a standardized content management database. The guidelines specify data fields necessary for different exhibit components, including Accessioned Objects, Cases, Custom Elements, Electronic Equipment, Electronic Programs, Graphic Layouts, and Images. Each component has defined criteria, such as descriptions, dimensions, materials, sources, and related elements, facilitating a comprehensive understanding of the exhibit's requirements. The guidelines emphasize the importance of consistent data collection and management practices, whether using the Museum Exhibit Planner (MEP) or alternative software. This structured approach aims to enhance exhibit development efficiency, ensuring adherence to best practices and standards established by the NPS. The document serves as an essential reference for contractors engaged in creating NPS exhibitions, contributing to effective project management and documentation throughout the planning and design process.
    The Intellectual Property Guidelines for Harpers Ferry Center outline the management of intellectual property rights in the context of interpretive media development. The document addresses copyright, patents, trademarks, and trade secrets, detailing the processes for acquiring use rights and managing contractor submissions. Key concepts include the definition of copyright protection, the role of fair use, and the rights in data clauses from the Federal Acquisition Regulation. The guidelines emphasize the importance of contractual clarity regarding ownership and licensing of creative works produced by contractors, highlighting the potential need for government employees and contractors to acquire use rights for pre-existing copyrighted materials. Additionally, the document addresses the distinctive nature of software acquisitions, including considerations for open-source software. Overall, it serves as a comprehensive framework to ensure compliance with intellectual property laws while facilitating creative endeavors within the government’s interpretive initiatives. These guidelines are particularly relevant in the context of federal RFPs and grants, ensuring secure use of creative works produced under government contracts.
    The document is a Sample Use Rights Letter intended for contractors working with the National Park Service (NPS) to acquire image licensing for exhibitions. The letter outlines a request for written permission from a copyright owner to use a specified image in an upcoming exhibit at a designated NPS location. It details the image identification, the required dimensions for exhibition display, and stipulates how credit for the image should be given, limiting it to the copyright owner's name and the organization. The letter emphasizes the need for written consent for the duration of the exhibition and provides contact information for follow-up questions. The permission grant section at the end of the letter is for the copyright owner to formally agree to the usage terms. This document demonstrates the procedural requirements and considerations involved in utilizing copyrighted materials for federal government projects, specifically within the context of RFPs and grants related to cultural and historical exhibitions.
    The document is a Request for Proposal (RFP) from the National Park Service for exhibit planning, design, fabrication, and installation services for the Hot Springs Mountain Tower at Hot Springs National Park, Arkansas. Aimed at small business concerns under the NAICS code 337212, the solicitation invites qualified contractors to submit proposals outlining how they will manage the entire process, including planning, design, fabrication, transportation, and installation of exhibits. Key components of the project include developing both indoor and outdoor exhibit elements that reflect the park's themes, including its geothermal springs, historical significance, and cultural heritage. The contractor must adhere to strict timelines and requirements, provide quality control, and maintain open communication with park representatives. The total budget for production ranges between $440,000 and $460,000, excluding costs for removing existing exhibits and infrastructure improvements. Proposals are to be submitted electronically by September 11, 2024, with questions due by August 28, 2024. The document details various phasing milestones, quality assurance measures, and accessibility requirements for the exhibits, ensuring a comprehensive interpretive experience for visitors while maintaining regulatory compliance.
    Lifecycle
    Title
    Type
    Combined Synopsis/Solicitation
    Similar Opportunities
    M--HAFC EISE DESIGN BUILD VC EXHIBITS
    Active
    Interior, Department Of The
    The Department of the Interior, specifically the National Park Service, is seeking proposals for the design, fabrication, and installation of new exhibits at the Eisenhower National Historic Site in Gettysburg, Pennsylvania. The project aims to enhance visitor engagement and accessibility through the development of interpretive exhibits that reflect the life and legacy of Dwight D. Eisenhower, utilizing universal design principles and incorporating interactive elements such as tactile maps and digital signage. This initiative is crucial for preserving historical narratives and improving educational outreach at the site, with a total small business set-aside under FAR 19.5. Interested contractors must submit their proposals by September 20, 2024, and can direct inquiries to Sheila Spring at SheilaSpring@nps.gov or by phone at 304-535-6239.
    NERI OUTDOOR RELIEF MAP EXHIBIT
    Active
    Interior, Department Of The
    The Department of the Interior, through the National Park Service, is soliciting proposals for the design, fabrication, and installation of a 3-foot by 6-foot bronze resin three-dimensional relief map at the Canyon Rim Visitor Center in West Virginia. This project aims to create an informative and accessible display that accurately represents the topographical features of the New River Gorge National Park, enhancing visitor education and engagement while complying with federal accessibility standards. The contract is set aside for small businesses under NAICS code 238990, with a focus on recent and relevant experience in similar projects. Interested contractors must submit detailed quotes electronically by the specified deadline, and inquiries should be directed to Melvin Gartrell at melvingartrell@nps.gov. The installation is expected to be completed by August 1, 2025, and adherence to wage determinations under the Service Contract Act will be required.
    REQUEST FOR EXPRESSIONS OF INTEREST FOR AN HISTORIC PROPERTY AVAILABLE WITHIN OZARK NATIONAL SCENIC RIVERWAYS.
    Active
    Interior, Department Of The
    The Department of the Interior's National Park Service is seeking expressions of interest for the adaptive reuse of the historic Big Spring Lodge and associated structures in Ozark National Scenic Riverways, Missouri. The service seeks innovative ideas for the lodge's transformation while preserving its historical significance. Potential uses could include lodging, conference facilities, special event spaces, and F&B operations. Interested parties can download the RFEI for more details and should contact Eric Nikkel to receive future updates. A site visit is scheduled for August 28, 2024, and questions must be submitted by September 6, 2024. Is there anything else I can help you with regarding this opportunity?
    Z--YELL 307127 - Rehabilitate historic Structures
    Active
    Interior, Department Of The
    The Department of the Interior, through the National Park Service, is seeking proposals for the rehabilitation of historic structures at Fort Yellowstone within Yellowstone National Park. The project aims to preserve seventeen historical housing units, addressing significant deterioration and deferred maintenance to ensure the integrity and continued use of these nationally significant buildings. This procurement is crucial for maintaining the historical narrative of Yellowstone National Park and is anticipated to be a negotiated firm-fixed price contract with an estimated value exceeding $10 million. Interested vendors should contact Vicki Freese-Supler at vickilfreese-supler@nps.gov or 720-402-8467, with the solicitation expected to be issued around September 23, 2024, and a pre-proposal conference scheduled for September 24, 2024.
    Z--NATIONAL PARK SERVICE - NATIONAL MALL AND MEMORIAL
    Active
    Interior, Department Of The
    The National Park Service, under the Department of the Interior, is soliciting bids for the restoration of the Samuel Gompers Statue and the Edmund Burke Memorial located at the National Mall in Washington, DC. The project aims to provide cyclical maintenance and conservation services, including a condition assessment, treatment recommendations, and comprehensive documentation to restore both memorials to a preserved state. This initiative underscores the importance of preserving national heritage and ensuring that significant monuments continue to honor American history, accommodating approximately 25 million visitors annually. Interested small businesses must submit their proposals by September 20, 2024, with a pre-proposal site visit scheduled for August 22, 2024. The estimated contract value ranges between $100,000 and $250,000, and inquiries can be directed to Dr. Bophany Drakeford at BophanyDrakeford@nps.gov or by phone at 202-619-6357.
    Y--YELL 310533 Rehabilitate and Improve Old Faithful
    Active
    Interior, Department Of The
    The Department of the Interior, through the National Park Service, is soliciting proposals for the rehabilitation and improvement of the Old Faithful Water Treatment System at Yellowstone National Park (Project No. YELL 310533). The project involves constructing a new water treatment plant, including the installation of advanced piping and control systems, while adhering to environmental protection standards and ensuring minimal disruption to park activities. This initiative is crucial for maintaining essential water supply infrastructure within the park, reflecting the government's commitment to both service improvement and environmental stewardship. Interested contractors should contact Vicki Freese-supler at vickilfreese-supler@nps.gov or 720-402-8467, with proposals due following a pre-proposal site visit and an expected performance period of 822 calendar days from the notice to proceed. The estimated project cost exceeds $10 million, and all inquiries must be submitted by October 1, 2024.
    Death Valley National Park - Repair Landfill Cap a
    Active
    Interior, Department Of The
    The Department of the Interior, through the National Park Service, is soliciting bids for the repair of the landfill cap and drainage systems at Furnace Creek in Death Valley National Park, California. The project, identified by solicitation number 140PS124Q0039, involves critical construction work to restore infrastructure damaged by flooding, including soil testing, erosion repairs, and the installation of new culverts and water bars. This initiative is vital for maintaining environmental safety and functionality within the park, emphasizing the government's commitment to ecological preservation and infrastructure resilience. Interested contractors must submit sealed offers by adhering to strict guidelines, with a project budget estimated between $100,000 and $250,000, and a mandatory site visit scheduled for September 30, 2024. For inquiries, contact Caitlin Hale at caitlinhale@nps.gov.
    Z--Visitor Center Renovation, Whiskeytown NRA
    Active
    Interior, Department Of The
    The Department of the Interior, through the National Park Service, is seeking proposals for the renovation of the historic visitor center at Whiskeytown National Recreation Area in Shasta County, California. The project, estimated to cost between $500,000 and $1 million, involves extensive renovations, sitework, and utility upgrades, with optional roofing and interior wall treatments, aimed at enhancing visitor experiences while preserving historical structures. This Request for Proposal (RFP) is exclusively open to small businesses as part of a Total Small Business Set-Aside, with the RFP expected to be published electronically around October 1, 2024, and submissions due 30 days after issuance. Interested parties can contact Brenda Lewis at BrendaLewis@nps.gov or call 206-220-4018 for further information.
    Z--Ext. Paint and Apply Fire Retardant to Roofs, LAVO
    Active
    Interior, Department Of The
    The Department of the Interior, through the National Park Service, is seeking qualified contractors for a project involving the exterior painting and application of fire retardant to roofs at Lassen Volcanic National Park. The scope of work includes painting the Yah-Mah-Nee Visitor Center, two Entrance Station Fee Booths, and an adjacent Amphitheater, as well as applying fire retardant to approximately 34,000 square feet of shake shingles on 19 historic structures. This initiative is crucial for preserving the park's historical integrity while ensuring compliance with federal safety and environmental standards. Interested small businesses must submit their quotes electronically by 3 PM PDT on September 18, 2024, with an estimated contract value between $100,000 and $250,000. For further inquiries, contact Phaedra Fuller at PhaedraFuller@nps.gov or by phone at 360-565-3009.
    The National Park Service (NPS) will release a prospectus on September 3, 2024, soliciting proposals to award a ten (10) year concession contract to provide guide tours of historic buildings within the Kennecott Mines National Historic Landmark.
    Active
    Interior, Department Of The
    The National Park Service (NPS) is set to release a prospectus on September 3, 2024, inviting proposals for a ten-year concession contract to provide guided tours of historic buildings at the Kennecott Mines National Historic Landmark in Alaska. The selected contractor will be responsible for delivering engaging and informative tours that highlight the historical significance of the site, which is a key attraction within the national park system. A site visit is scheduled for September 13, 2024, at 10:00 AM, allowing interested parties to familiarize themselves with the location and requirements; registration details can be found in the prospectus available on the NPS Commercial Services website. For further inquiries, potential bidders can contact Mark Keogh at markkeogh@nps.gov or David Lucas at davidlucas@nps.gov.