CABLE ASSEMBLY, RADI
ID: W31P4Q-25-Q-0021-0002Type: Solicitation
Overview

Buyer

DEPT OF DEFENSEDEPT OF THE ARMYW6QK ACC-RSAREDSTONE ARSENAL, AL, 35898-5090, USA

NAICS

Current-Carrying Wiring Device Manufacturing (335931)

PSC

CABLE, CORD, AND WIRE ASSEMBLIES: COMMUNICATION EQUIPMENT (5995)
Timeline
    Description

    The Department of Defense, specifically the Army Contracting Command at Redstone Arsenal, is soliciting proposals for a firm-fixed-price contract to manufacture 10 units of "CABLE ASSEMBLY, RADI" (NSN: 5995-01-618-5033, Part Number: 13646605-4). This procurement has transitioned from a 100% small business set-aside to a full and open competition, requiring Production Lot Testing (PLT) for all units, with a completion period of 60 days; Contractor First Article Testing (FAT) is not required, although waivers may be considered. The goods are critical for communication equipment applications within military operations, and proposals must be submitted via email to Tamela D. Riggs-Holman by January 7, 2026, following the issuance of the solicitation on November 25, 2025.

    Point(s) of Contact
    Files
    Title
    Posted
    This government file outlines the detailed procedures for contractors to submit Engineering Change Proposals (ECPs), Value Engineering Change Proposals (VECPs), Requests for Deviations (RFDs), and Requests for Variances (RFVs) for federal government contracts. It distinguishes between Class I and Class II ECPs, specifying
    This Request for Quotation (RFQ) W31P4Q-25-Q-0021 is a 100% small business set-aside for a firm-fixed-price contract to manufacture 10 "CABLE ASSEMBLY, RADI" units (NSN: 5995-01-618-5033, Part Number: 13646605-4). The solicitation, issued by the Army Contracting Command-Redstone, requires Production Lot Testing (PLT) for all units, with a 60-day completion period. Contractor First Article Testing (FAT) is not required, but waivers will be considered. Proposals are due 30 days after the issue date of August 21, 2025, with a closing date of September 24, 2025, and must be emailed to Tamela D. Riggs-Holman. The document outlines detailed packaging, marking, inspection, and acceptance criteria, including MIL-STD-129 and MIL-STD-2073-1, and requires origin inspection and destination acceptance. It also incorporates numerous federal acquisition regulations (FAR) and Defense FAR Supplement (DFARS) clauses by reference, covering areas such as contractor inspection, item unique identification and valuation, safeguarding covered defense information, prohibition on certain telecommunications equipment, and various socio-economic and ethical requirements. A critical warning about export-restricted technical data is included, emphasizing compliance with the Arms Export Control Act.
    This document is Amendment 0001 to Solicitation W31P4Q-25-Q-0021, issued by the ARMY CONTRACTING COMMAND-REDSTONE. The amendment primarily updates the proposal due date to October 8, 2025, at 4:00 P.M. Central Time. The solicitation is for a Firm Fixed Price supply contract for 10 units of "CABLE ASSEMBLY,RADI" (NSN: 5995-01-618-5033, Mfr Part Number: 13646605-4). Offers must acknowledge receipt of this amendment by completing items 8 and 15 and returning copies, acknowledging on each offer copy, or by separate letter/telegram. Failure to acknowledge may result in rejection of the offer. All other terms and conditions of the original solicitation remain unchanged.
    This document is Amendment 0002 to Solicitation W31P4Q-25-Q-0021, issued by the ARMY CONTRACTING COMMAND-REDSTONE. Its primary purpose is to change the solicitation from a 100% Small Business Set-Aside to a Full and Open competition. The solicitation is for a Firm Fixed Price contract for a one-time purchase of 10 CABLE ASSEMBLY, RADI (NSN: 5995-01-618-5033, Part Number: 13646605-4). Key details include no Contractor First Article Testing (FAT) requirement, but requests for FAT waivers will be considered, and Production Lot Testing (PLT) is required for all units, with a 60-day completion period. The proposal due date is 30 days after the issue date, with proposals to be emailed to TAMELA.D.RIGGS.CIV@MAIL. The issue date is November 25, 2025, and the closing date is January 7, 2026. The document also specifies packaging, marking, inspection, acceptance, and delivery terms, with the FOB point at destination and shipment to SR W0H9 US ARMY AVN & MISSLES CMD in Redstone Arsenal, AL. It also contains distribution and export control warnings.
    Lifecycle
    Title
    Type
    CABLE ASSEMBLY, RADI
    Currently viewing
    Solicitation
    Similar Opportunities
    Loading similar opportunities...