ContractSolicitationTotal Small Business Set-Aside (FAR 19.5)

Maintenance, Repair, and Preservation of YT-810

DEPT OF DEFENSE N4523A26Q1001
Response Deadline
Dec 12, 2025
Deadline passed
Days Remaining
0
Closed
Set-Aside
Total Small Business Set-Aside (FAR 19.5)
Notice Type
Solicitation

Contract Opportunity Analysis

The Department of Defense, through the Puget Sound Naval Shipyard Intermediate Maintenance Facility, is soliciting proposals for the maintenance, repair, and preservation of the YT-810 Deception harbor tug. The contract will encompass a range of services including vessel cleaning, hull preservation, and various repairs to the tug's systems, with the work scheduled to take place from March 19 to June 11, 2026, in the Puget Sound, WA region. This procurement is critical for ensuring the operational readiness and longevity of the vessel, which plays a vital role in naval operations. Interested small businesses must submit their quotes by December 12, 2025, and are encouraged to contact Alice Robertson or Chris Davidson for further information and clarification.

Classification Codes

NAICS Code
336611
Ship Building and Repairing
PSC Code
J019
MAINT/REPAIR/REBUILD OF EQUIPMENT- SHIPS, SMALL CRAFT, PONTOONS, AND FLOATING DOCKS

Solicitation Documents

22 Files
C9 N4523A26Q1001 YT-810 Amendment 0003 - RFC Answers 1-7.pdf
PDF174 KBDec 9, 2025
AI Summary
The document addresses questions and answers related to a government Request for Proposal (RFP) or similar solicitation. It details several amendments and clarifications made in response to vendor inquiries. Key issues include the removal of a specific user manual (Schottel User Manual 1241871 Ver 1.0) via Amendment 0001, discrepancies between the Price Worksheet and the Statement of Work (SOW) items 3.11.1-3.11.5, and issues with SOW item 3.10 and SOW item 3.11.3.4 and 3.11.3.5, all addressed by Amendment 0002. Furthermore, missing SOW items from the worksheet (3.3.1, 3.7.5, 3.11.4, and 3.11.5) were clarified with 3.11.5 being integrated into 3.11.4 and included in a revised Attachment 2. The government declined to remove Technical Evaluation Factor 4. Finally, the deadline for quote submissions was extended to December 12, 2025, through Amendment 0003. This document is crucial for vendors to understand the updated requirements and deadlines for the solicitation.
C9 N4523A26Q1001 YT-810 Amendment 0003.pdf
PDF955 KBDec 9, 2025
AI Summary
Amendment 0003 for Solicitation N4523A26Q1001, issued by Puget Sound Naval Shipyard IMF, updates the Attachment 6 Drawings and References and extends the proposal due date to December 12, 2025, at 2:00 PM PST. This Request for Quote (RFQ) is for Firm Fixed Price Maintenance, Repair, and Preservation of YT-810. The period of performance is from March 19, 2026, to June 11, 2026, with the work to be performed in the Puget Sound, WA region. Offerors must submit quotes, including a Government Property Management System Plan, to Christopher Davidson and Alice Robertson. A secondary shipcheck is scheduled for December 2, 2025, and attendance is strongly encouraged. All other terms and conditions of the solicitation remain unchanged. The NAICS code is 336611 (Ship Building and Repairing) and the PSC is J019 (Maintenance, Repair, and Rebuilding of Equipment: Ships, Small Craft, Pontoons, and Floating Docks).
C9 N4523A26Q1001 YT-810 RFC Answers 1-8.pdf
PDF176 KBDec 9, 2025
AI Summary
The document addresses questions and answers related to a government Request for Proposal (RFP), detailing amendments and clarifications made to the Statement of Work (SOW) and Price Worksheet. Key updates include the removal of the "Schottel User Manual 1241871 Ver 1.0" from reference, the issuance of Amendment 0002 to correct discrepancies between the Price Worksheet and SOW items (3.11.1, 3.11.2, 3.11.3, 3.11.4, 3.11.5), and clarification on SOW Item 3.10. Additionally, Amendment 0002 addresses incorrect table references in SOW Items 3.11.3.4 and 3.11.3.5, and the inclusion of missing items (3.3.1, 3.7.5, 3.11.4) in the revised Price Worksheet, with 3.11.5 being integrated into 3.11.4. The government rejected the request to remove Technical Evaluation Factor 4 but extended the solicitation submission deadline to December 12, 2025, via Amendment 0003. Finally, the document directs inquirers regarding representations and certifications to FAR 52.212-3.
C8 N4523A26Q1001 Solicitation.pdf
PDF2239 KBDec 9, 2025
AI Summary
This Request for Quote (RFQ) N4523A26Q1001 outlines a firm-fixed-price contract for the maintenance, repair, and preservation of the YT-810 vessel from March 19 to June 11, 2026, within the Puget Sound, WA region. The solicitation, issued under NAICS code 336611 (Ship Building and Repairing), requires offerors to submit quotes by December 5, 2025, and clarification requests by November 21, 2025. Key requirements include a Government Property Management System Plan, adherence to FAR Provision 52.212-2 for technical acceptability, and participation in a mandatory ship check on November 13, 2025. The contract incorporates a
C8 N4523A26Q1001 YT-810 Attachment 1 Statement of Work.pdf
PDF1126 KBNov 19, 2025
AI Summary
The government Statement of Work (SOW) N4523A26Q1001 outlines comprehensive docking and maintenance requirements for the YT-810 Deception, a Yard Tug Medium. The contractor is responsible for high-quality workmanship, adhering to commercial marine industry standards and technical references. Key tasks include vessel delivery and pickup coordination, hull preservation, tank testing, and various system repairs (propulsion, steering, electrical, piping). The SOW details administrative requirements, including weekly schedules, subcontractor lists, safety protocols, environmental and hazardous waste management, and quality control. Regular progress meetings and stakeholder reviews are mandated. Testing, inspections, and Process Control Procedures (PCPs) are crucial, with specific documentation and notification requirements for government oversight. The contractor must also provide a secure on-site office for government representatives and maintain a Heavy Weather Plan for vessel protection.
C8 N4523A26Q1001 YT-810 Attachment 2 Price Worksheet.xlsx
Excel95 KBNov 19, 2025
AI Summary
The J-2 Price Proposal Worksheet provides instructions for contractors to accurately complete a price proposal for government submittal. Contractors must fill in all yellow-highlighted cells with company details, labor mix and rates, and project-specific information. Key data points include company name, date, labor categories (e.g., Shipfitter, Welder), regular and overtime hours, and various base rates like Fringe, Overhead, G&A, and Profit. Facilities Capital Cost of Money (FCCOM) is optional; if used, it must be calculated per CASB-CMF form and included with the submission. The worksheet auto-populates certain fields and calculates totals. The document also lists numerous work items, from arrival conferences and required documents to specific vessel repairs and inspections (e.g., Hull Blasting, Tank Visual Inspection, Schottel Z-Drive Repair), which contribute to the overall price. Contractors are reminded to ensure all yellow cells are completed before submission, and that the labor and profit rates established will be used for all contract modifications.
C8 N4523A26Q1001 YT-810 Attachment 9 Growth Management Program Tracking Log.xlsx
Excel24 KBDec 9, 2025
AI Summary
This government file outlines a contract for the vessel YT-810 with a performance period from March 19, 2026, to June 11, 2026. The document details a cost breakdown structure across 30 requests, encompassing categories such as Prime MH, Prime Material, Prime Total, SubC Labor, SubC Material, SubC Total, ODC, Travel ODC, and Total Price. However, all monetary values and the overall Growth Management Program Value are listed as 'TBD' or '#VALUE!', indicating that this is a placeholder or template document where the financial specifics are yet to be determined. The file also includes sections for 'Contract Established Rates' for Labor Rate/MH, Fringe, Overhead, G&A Rate, and Profit Rate, which are also left blank. This suggests the document serves as a framework for an upcoming contract, awaiting the input of specific financial figures and detailed work statements.
C8 N4523A26Q1001 YT-810 Exhibit A CDRLs and DIDs Request.pdf
PDF101 KBDec 9, 2025
AI Summary
The document, Exhibit A CDRLs and DIDs Request for N4523A26Q1001 YT-810, outlines the procedure for requesting Contract Data Requirements Lists (CDRLs) and Data Item Descriptions (DIDs) related to the federal government solicitation N4523A26Q1001 YT-810. To obtain these documents, interested parties must send an email with the subject line “N4523A26Q1001 YT-810 Exhibit A CDRLs and DIDs Request” to either Alice Robertson (alice.n.robertson.civ@us.navy.mil) or Chris Davidson (christopher.t.davidson7.civ@us.navy.mil). The requested Exhibit A CDRLs and DIDs will subsequently be delivered to the requester via the DoD SAFE system. This process ensures secure distribution of critical contract-related information for potential bidders on government RFPs.
C8 N4523A26Q1001 YT-810 Exhibit B GFP Attachment.pdf
PDF5 KBDec 9, 2025
AI Summary
This GFP Attachment details the solicitation N4523A25Q1108 for the “Maintenance, Repair, and Preservation of YT-810.” It outlines both provisioned and requisitioned items required for the project. The primary provisioned item is one YT-810 Deception Yard Tug, valued at $14,000,000.00, scheduled for delivery on February 2, 2026. Additionally, the solicitation includes several requisitioned anode probes from Cathelco, with various part numbers (CA091157FEA, CA091157MGA, CA091157MGB), quantities ranging from one to two units, and individual costs between $1,456.25 and $2,535.00. These anode probes are also slated for delivery on February 2, 2026. The document specifies details such as CAGE codes, NSNs, property classifications, and usage for all items.
C9 N4523A26Q1001 YT-810 Amendment 0001 - RFC Answers 1.pdf
PDF210 KBNov 19, 2025
AI Summary
This government response clarifies an amendment to a Request for Proposal (RFP) or similar government contract document. Specifically, it addresses a question regarding the availability of the “Schottel User Manual 1241871 Ver 1.0.” The response indicates that this manual has been removed from the Consolidated List of Reference in the Statement of Work, directing the inquirer to Amendment 0001 and Section 3.7 of the Statement of Work for further details. This shows a commitment to providing clear and updated information to potential contractors or grant applicants, ensuring all parties are working with the most current project requirements.
C9 N4523A26Q1001 YT-810 Amendment 0002.pdf
PDF898 KBDec 9, 2025
AI Summary
Amendment 0002 to Solicitation N4523A26Q1001, issued by Puget Sound Naval Shipyard IMF, updates the Statement of Work and Price Worksheet for the Maintenance, Repair, and Preservation of YT-810. The proposal due date remains December 5, 2025, at 2:00 PM PDT. A secondary ship check date is set for December 2, 2025, from 8:00 AM to 2:00 PM on Naval Base Kitsap, requiring notification by November 26, 2025. Offerors must adhere to specific PPE requirements for ship checks and acknowledge the amendment. All other terms and conditions of the solicitation remain unchanged. This Request for Quote (RFQ) is for a Firm Fixed Price contract, with a performance period from March 19, 2026, to June 11, 2026, in the Puget Sound, WA region. Contractors must submit a Government Property Management System Plan. Contract financing will be provided as progress payments.
C9 N4523A26Q1001 YT-810 Amendment 0002 - RFC Answers 1-5.pdf
PDF170 KBDec 2, 2025
AI Summary
This document addresses government responses to Requests for Clarification (RFCs) regarding a Statement of Work (SOW) and associated Price Worksheet. The responses clarify discrepancies and provide updates through forthcoming amendments. Specifically, the "Schottel User Manual 1241871 Ver 1.0" has been removed from the reference list. Multiple questions regarding inconsistencies between the Price Worksheet and SOW items (3.11.1-3.11.5), an item marked "Not Used" with scope requirements (3.10), incorrect table references (3.11.3.4 and 3.11.3.5), and missing items from the worksheet (3.3.1, 3.7.5, 3.11.4, and 3.11.5) are resolved. Amendment 0002 will incorporate these changes, including an updated Price Worksheet and SOW errata. Item 3.11.5 has been integrated into 3.11.4, ensuring all necessary items are accounted for in the revised documents. These amendments aim to rectify errors and provide clarity for all stakeholders involved in the RFP.
C9 N4523A26Q1001 YT-810 Attachment 1 Statement of Work - Errata 2.pdf
PDF1154 KBDec 9, 2025
AI Summary
This Statement of Work (SOW) outlines the requirements for docking and maintenance of the YT-810 Deception, a Yard Tug Medium. The project includes vessel cleaning, zinc anode replacement, hull preservation, and various repairs to hull, decks, propulsion, steering, machinery, electrical, and piping systems. The contractor is responsible for high-quality workmanship, compliance with safety and environmental regulations, and providing necessary facilities for government representatives. Key aspects include detailed documentation, regular progress meetings, comprehensive testing, and adherence to a heavy weather plan. The SOW emphasizes strict material procurement, weight control, and hazardous waste management protocols.
C8 N4523A26Q1001 YT-810 Attachment 2 Price Worksheet UPDATED.xlsx
Excel96 KBDec 9, 2025
AI Summary
The J-2 Price Proposal Worksheet provides instructions for contractors to submit pricing information to the Government for federal government RFPs. Contractors must fill in all yellow-highlighted fields, including company name, date, labor mix and rates (regular and overtime hours for categories like Shipfitter, Welder, Electrician), and other applicable information. Non-yellow cells are locked and auto-calculate. Facilities Capital Cost of Money (FCCOM) is optional; if used, a CASB-CMF form must be included; otherwise, "N/A" should be entered. The document also lists various work packages and tasks, from arrival conferences and required documents to specific repairs and testing, such as hull blasting, tank inspections, and system operational tests. Labor rates and profit rates established in the base contract will be used for all modifications. The overall goal is to ensure a comprehensive and accurate price proposal submission.
C9 N4523A26Q1001 YT-810 Attachment 1 Statement of Work - Errata 1.pdf
PDF836 KBNov 19, 2025
AI Summary
This government Statement of Work (SOW) outlines the docking and maintenance requirements for the YT-810 Deception, a Yard Tug Medium. The contractor is responsible for high-quality marine industry workmanship, adhering to specified technical references, and complying with all requirements. The scope includes vessel cleaning, zinc anode replacement, hull preservation, various repairs (hull, valves, deckhouse, propulsion, steering, machinery, electrical, piping, weight handling systems), and dock/sea trials. Key sections cover general requirements, definitions, required documents (schedules, lists, plans), progress meetings, availability requirements (electrical service, government office space), vessel care, workmanship standards, corrective action requests (CARs), condition found/inspection discrepancy reports (CFR/IDR), safety protocols (OSHA compliance, scaffolding, hot work), material standards, preservation, environmental and hazardous waste management, weight control, label plates, integrated logistic support, gas free certifications, testing requirements (Test and Inspection Plan, G-Points, I/V/Q Checkpoints), process control procedures (PCPs), compartment inspections, technical representative qualifications, and a heavy weather plan. The document emphasizes adherence to regulations, comprehensive documentation, and strict quality control throughout the project.
C9 N4523A26Q1001 YT-810 Amendment 0001.pdf
PDF739 KBDec 9, 2025
AI Summary
No AI summary available for this file.
C8 N4523A26Q1001 YT-810 Attachment 3 RFC Form.docx
Word23 KBDec 9, 2025
AI Summary
This document is a Request for Specification Clarification related to the maintenance, repair, and preservation of YT-810, under Requisition No. N4523A26Q1001. It outlines the process for contractors to submit questions regarding the specifications of a procurement. Key information includes the contact details for the Issuing Office POCS (Alice Robertson and Christopher Davidson), and a strict deadline for clarification requests to be received. The form also includes sections for internal use to track potential changes to specifications, drawings, requirements, or materials, along with a technical review and serial number. This document is crucial for ensuring clarity and addressing ambiguities in federal government RFPs before bids are finalized.
C8 N4523A26Q1001 YT-810 Attachment 4 Past Performance.docx
Word26 KBDec 9, 2025
AI Summary
The "CONTRACT PERFORMANCE DATA SHEET" (N4523A26Q1001, Attachment 4) is a federal government document used to assess a contractor's past performance. It requires information on contractor name, contract number, date completed, and contract type (FFP, Cost Reimbursement, or Other). The sheet details the item/service description, contract quantity/period of performance, and customer information including a point of contact for verification. The performance information section asks seven yes/no questions covering timely delivery, compliance with specifications, need for replacement/modification/rework, relaxation of specifications, contract termination for default, and quality awards. It also includes a section for describing corrective actions and their success, along with a narrative section for further details. This document is crucial for evaluating a contractor's reliability and quality of work in the context of government RFPs, federal grants, and state/local RFPs.
C8 N4523A26Q1001 YT-810 Attachment 5 Corporate Experience.docx
Word30 KBDec 9, 2025
AI Summary
The document,
C8 N4523A26Q1001 YT-810 Attachment 6 Drawings Request.pdf
PDF156 KBDec 9, 2025
AI Summary
The document, "Attachment 6 Drawings Request for N4523A26Q1001 YT-810," outlines the procedure for requesting drawings related to solicitation number N4523A26Q1001 YT-810. To obtain these drawings, interested parties must send an email with the subject line "N4523A26Q1001 YT-810 Drawings Request" to either Alice Robertson (alice.n.robertson.civ@us.navy.mil) or Christopher Davidson (christopher.t.davidson7.civ@us.navy.mil). The requested drawings will be securely transmitted to the requester via DoD SAFE. This document is a critical component within the context of government RFPs, as it provides essential instructions for accessing technical specifications necessary for potential bidders to prepare their proposals.
C8 N4523A26Q1001 YT-810 Attachment 7 BAVR Instructions.pdf
PDF193 KBDec 9, 2025
AI Summary
Attachment 7 outlines the instructions for obtaining security badges to attend a ship check for Solicitation N4523A26Q1001 YT-810. To apply, individuals must visit the BAVR website, click "Apply for New Badge," and complete only the mandatory red fields in the online form, using "Attending One Day Ship Check for Solicitation N4523A26Q1001 YT-810" as the purpose of the visit. Chontay Woodruff (chontay.r.woodruff.civ@us.navy.mil) should be listed as the sponsor. After submission, applicants must email Matthew Stubblefield (matthew.c.stubblefield.civ@us.navy.mil), Chontay Woodruff, and Alexandra Vanderpool (Alexandra.c.vanderpool.civ@us.navy.mil) to confirm their BAVR submission. Reggie Deriso will then process the form for badge issuance. For any questions, Matthew Stubblefield can be contacted at (360) 633-9321.
C8 N4523A26Q1001 YT-810 Attachment 8 Growth Management Request Form.docx
Word28 KBDec 9, 2025
AI Summary
The N4523A26Q1001 Growth Management Request Form is a government document used to manage changes and additional work on a contract, specifically for the YT-810 Ship/Hull. It outlines a process for authorizing "Growth Management," with a focus on "Level Of Effort (LOE) to Completion." The form details requirements for the Statement of Work, including scope, location, references, and Government Furnished Material (GFM). It also includes sections for contractors to submit proposals with estimated labor, material, and subcontractor costs, leading to a negotiated total price. The document requires agreement signatures from the Contractor Representative, PSNS Project Manager, and PSNS Contracting Officer, along with an effective date for the growth management. Final acceptance and completion of work also necessitate signatures from the Contractor Representative and the PSNS Contracting Officer’s Representative.

Related Contract Opportunities

Project Timeline

postedOriginal Solicitation PostedNov 5, 2025
amendedAmendment #1· Description UpdatedNov 13, 2025
amendedAmendment #2· Description UpdatedNov 18, 2025
amendedAmendment #3· Description UpdatedDec 1, 2025
amendedLatest Amendment· Description UpdatedDec 9, 2025
deadlineResponse DeadlineDec 12, 2025
expiryArchive DateDec 27, 2025

Agency Information

Department
DEPT OF DEFENSE
Sub-Tier
DEPT OF THE NAVY
Office
PUGET SOUND NAVAL SHIPYARD IMF

Point of Contact

Name
ALICE ROBERTSON

Place of Performance

UNITED STATES

Official Sources