GVIC FISH SCREEN REHABILITATION
ID: 140R4024R0024Type: Solicitation
Overview

Buyer

INTERIOR, DEPARTMENT OF THEBUREAU OF RECLAMATIONUPPER COLORADO REGIONAL OFFICESALT LAKE CITY, UT, 84138, USA

NAICS

Water and Sewer Line and Related Structures Construction (237110)

PSC

CONSTRUCTION OF OTHER NON-BUILDING FACILITIES (Y1PZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)
Timeline
    Description

    The Department of the Interior, through the Bureau of Reclamation, is soliciting bids for the rehabilitation of fish screens at the Grand Valley Irrigation Company (GVIC) located in Mesa County, Colorado. This project, estimated to cost between $1,000,000 and $5,000,000, aims to enhance water infrastructure as part of the Upper Colorado River Endangered Fish Recovery Program, focusing on the installation of new concrete structures and fish screens, along with a control and cleaning system. The rehabilitation is crucial for preserving aquatic ecosystems and ensuring compliance with environmental regulations. Interested small businesses must submit their sealed bids by January 29, 2025, with inquiries due by January 10, 2025, and the expected performance period running from April 1, 2025, to May 1, 2026. For further details, potential bidders can contact Ana Fife at afife@usbr.gov or by phone at 801-524-3671.

    Point(s) of Contact
    Files
    Title
    Posted
    The GVIC Fish Screen Rehabilitation project is part of the Upper Colorado River Endangered Fish Recovery Program, focusing on rehabilitating fish screening infrastructures in Mesa County, Colorado. The project involves several major components, including the demolition of existing structures, installation of new concrete and fish screens, and the establishment of a control and cleaning system. The rehabilitation must be completed by May 1, 2026, aligning with the Grand Valley Irrigation Company’s schedule for water supply. Key aspects of the document include strict work site regulations to prevent interference with ongoing operations and maintenance of the GVIC systems, a comprehensive project management plan, and detailed requirements for safety and environmental compliance. Submittal procedures are outlined for various components, ensuring thorough reviews and adherence to safety standards throughout the construction phase. Overall, this document serves as a guide for contractors to follow, detailing the scope, timeline, and necessary coordination efforts required to ensure successful project completion in alignment with federal guidelines and local regulations.
    The document outlines the specifications and plans for the Grand Valley Irrigation Company's Fish Screen Rehabilitation project, part of the Upper Colorado River Endangered Fish Recovery Program. It details project diagrams, demolition plans, and construction methodologies necessary for the renovation of the fish screen facility located in Grand Junction, Colorado. Key elements include access routes, equipment handling, environmental considerations, and structural modifications, particularly regarding bypass and fish return channels, alongside safety precautions. The document serves as a technical guide for contractors involved in the project, providing critical details on existing structures and specific requirements to ensure compliance with environmental regulations. The plans address access limitations, necessary demolition, and construction standards, outlining the expected coordination during the project lifecycle. By funding this endeavor through federal grants, the Bureau of Reclamation aims to enhance the facility's functionality while contributing to regional ecological restoration efforts.
    The document outlines grounding details and specifications for electrical installations as required by the United States Department of the Interior, Bureau of Reclamation. It emphasizes the necessary materials and methods for grounding metal conduits, detailing the types of grounding clamps, cable sizes, and connections to ensure safety and compliance in electrical systems. Key figures illustrate installation practices, including bonding conduits at expansion joints, embedding ground connectors, and providing specifications for metal conduit grounding. It further stipulates that ground cables must be sufficiently long to secure connections to equipment, and all grounding connections should be made with specific materials like silicon bronze. The document elaborates on critical grounding procedures, including removing paint and scale before connections, ensuring that installations accommodate potential breaks in conduit runs, and grounding all junction boxes that contain protective equipment. In the context of government RFPs, this document serves as a technical standard ensuring safety, functionality, and adherence to regulatory requirements in electrical infrastructure projects, particularly relevant to federally funded and managed sites.
    The document outlines the technical specifications and wiring diagrams for a PLC (Programmable Logic Controller) panel associated with GVIC water screens used in municipal water management systems. The design includes 120VAC control power and 208VAC service power tailored for various motors and torque monitors controlling water screen functionalities. The panel is structured to interoperate with a Master SCADA system, emphasizing automation through hand-off-auto functions for motor operation. Detailed wiring configurations illustrate connections for control circuits, e-stops, and overload protection, ensuring operational safety and reliability. Access points for maintenance and adherence to color-coded wiring standards are also provided. The drawings encompass enclosure layouts, necessary for housing the electrical control components and indicating future SCADA integration. Furthermore, the document is crucial for contractors responding to federal and local RFPs regarding water management infrastructure upgrades, reinforcing operational efficiency while promoting compliance with municipal regulations.
    The document outlines the framework for calculating the subcontracting percentage under FAR Clause 52.219-14 within U.S. Department of the Interior contracts. It consists of a Subcontracting Percentage Worksheet to assist prime contractors and subcontractors in documenting labor costs, including direct labor, fringe benefits, and general and administrative (G&A) costs. The process involves entering direct labor and fringe benefits for both the prime and subcontractor, computing subtotal figures, and applying the G&A rate to each subtotal. The final calculation of the subcontracting labor cost percentage is derived by using the formula which compares total labor costs of the subcontractor against the combined costs of both entities. The guidance stresses compliance with federal regulations, specifically that overhead costs must be deemed allowable per FAR 31.205-6(m), with a warning that non-compliance could invalidate the overhead calculations. This process ensures transparency and adherence to governing rules in federal contracts and grants, facilitating equitable allocation of subcontracting efforts in federal projects.
    The Bureau of Reclamation's solicitation (140R4024R0024) for the GVIC Fish Screen Rehabilitation project seeks input on contractors' past performance to support source selection. Responses are due by November 15, 2024, and must be sent to the Acquisition Management Division, specifically to Ana Fife. The questionnaire requires the contractor to provide key details about their previous contracts, including contractor information, contract initiation and completion dates, contract value, and type. An evaluating organization representative must complete sections assessing the contractor's performance across several criteria: quality of products and services, overall performance, fulfillment of technical requirements, adherence to schedule, cost control, customer satisfaction, and an overall assessment. Each criterion includes a range of evaluative options from “Exceptional” to “Unsatisfactory”. The document underlines the importance of past performance as a metric for assessing potential contractors within the framework of government RFPs and grants. Notably, the questionnaire aims to collect comprehensive evaluation feedback to ensure accountability and quality in contractor selection for federal projects.
    The Bid Bond document serves as a formal guarantee from both the principal (the bidding party) and sureties (the guarantors) to the U.S. government, ensuring financial responsibility in the bidding process for federal contracts. It requires the principal to undertake contractual obligations once their bid is accepted, including the procurement of required bonds in a specified timeframe. The bond's validity is contingent upon the principal fulfilling these obligations or compensating the government for any excess costs incurred due to non-compliance. Key components include details about the bidding party, sureties’ information, and the penal sum, which indicates the bond's monetary limits. The document outlines obligations, conditions, and instructions for completion, emphasizing the need for corporate seals and evidence of authority when signed by representatives. Designed for federal RFPs and contracts, it assures that bidders meet their commitments, thereby facilitating trust and accountability in government procurement processes.
    The document serves as a Performance Bond, an essential requirement for contractors engaged with the federal government. It stipulates that the Principal, along with their Surety, is bound to fulfill all terms and conditions outlined in the contract, including any modifications, to ensure the Government's financial interests are secured. The bond becomes void if the Principal complies fully with their obligations. It necessitates disclosure of the Principal's legal name, business address, type of organization, and surety information, with a detailed penal sum representing the bond's value. The document outlines requirements for both corporate and individual sureties, emphasizing the need for corporate sureties to be approved by the Department of Treasury. Additionally, it includes administrative instructions, compliance with the Paperwork Reduction Act, and emphasizes the necessity of corporate seals and signatures as part of the execution. This summary encapsulates a crucial element of federal contracting, ensuring that contractors are financially responsible for project execution and compliance with legal requirements.
    The document presents Standard Form 25A, utilized for executing payment bonds required under federal contracting regulations. It outlines the obligations of the Principal and Sureties, binding them to the United States in a specified penal sum. The bond ensures payment to those supplying labor and materials for the designated contract, safeguarding their rights. The document stipulates that liability limits must be clearly stated, and outlines procedures for executing the bond, including the need for corporate seals and the importance of authorized signatures. Additionally, it specifies the requirement for individual sureties to complete an Affidavit of Individual Surety. The form emphasizes compliance with the Paperwork Reduction Act and details the information collection process. Overall, this form is essential for the protection of subcontractors and suppliers in government contracts, aiming to ensure financial security and proper business practices in public procurement.
    The document outlines the price schedule for the GVIC Fish Screen Rehabilitation project located in Mesa County, Palisade, Colorado, under Solicitation No. 140R4024R0024. It details various supply and service categories required for the project, with specific quantities, units, unit prices, and total amounts listed for items, all reflecting a total of $0.00. Key components include mobilization, surveying, concrete work for bypass channels and structures, metalwork for plumbing and electrical supports, various installation services, comprehensive plumbing and electrical systems, as well as excavation, road surfacing, and gate installations. The listing suggests extensive work aimed at rehabilitating fish screening structures, crucial for preserving aquatic ecosystems. The structured format categorizes services into distinct sections, highlighting the thorough planning and requirement for specialized materials and labor in aquatic project management. Overall, the document signifies governmental efforts toward environmental restoration and infrastructure improvement through well-defined funding requests and project specifications.
    The Bureau of Reclamation has issued Solicitation No. 140R4024R0024 for the rehabilitation of fish screens at the Grand Valley Irrigation Company (GVIC) located in Mesa County, Colorado. The project, estimated at $1,000,000 to $5,000,000, aims to enhance water infrastructure, providing necessary specifications and requirements outlined in detailed sections covering safety, environmental controls, resource management, and the use of existing utilities. A total small business set-aside under NAICS Code 237110 is in place, encouraging participation from qualifying firms. The contractor must begin work within ten days of receiving a notice to proceed, with an expected completion timeline of 366 days thereafter. The document includes clauses for liquidated damages, inspection and acceptance, and performance bonding requirements to ensure contractual adherence. Additionally, past performance assessments will be recorded electronically to evaluate contractor performance. Key contacts and electronic invoicing protocols further structure this federal procurement, emphasizing compliance and accountability in the project execution. This initiative underscores the government's commitment to sustainable water management and environmental protection through infrastructure rehabilitation.
    This document outlines an amendment to a solicitation for bids, primarily aimed at extending the response deadline for proposals. The amendment indicates that bids, initially due on January 8, 2025, have been rescheduled to January 29, 2025, with inquiries regarding the solicitation due by January 10, 2025. It is issued by the Regional Office of the Bureau of Reclamation, based in Salt Lake City, Utah, and references contract modifications and acknowledgment procedures for contractors. The period of performance for the project is set from April 1, 2025, to May 1, 2026. The document details the necessary steps for contractors to confirm receipt of this amendment, emphasizing that failure to comply may result in rejection of their offers. Overall, this amendment is part of standard federal procurement procedures, enabling better vendor participation and project management by adjusting timelines as needed.
    This government solicitation, issued by the Bureau of Reclamation's Upper Colorado Region, invites bids for the rehabilitation of the GVIC Fish Screen in Mesa County, Colorado, with an estimated project cost between $1,000,000 and $5,000,000. The solicitation specifies that it is a sealed bid and includes comprehensive requirements for contractors regarding performance and payment bonds. The project is categorized under NAICS 237110, focusing on water and sewer line construction, and is set aside for small businesses with an annual revenue cap of $45 million. The performance period is defined from April 1, 2025, to May 1, 2026, following a site visit where questions from bidders can be submitted for clarification until seven days after. Sealed offers must be delivered by a specified deadline, emphasizing transparency and compliance with procurement regulations. The document reinforces the importance of contractor qualifications and responses, ensuring potential bidders understand the scope and requirements for successful implementation of the project. This solicitation reflects government efforts to enhance infrastructure while promoting small business participation.
    Lifecycle
    Title
    Type
    Similar Opportunities
    Z--Arroyo Canal Fish Screen/Sack Dam Fish Passage
    Active
    Interior, Department Of The
    The Department of the Interior, through the Bureau of Reclamation, is soliciting proposals for the Arroyo Canal Fish Screen and Sack Dam Fish Passage Project, aimed at enhancing fish passage and ecological conditions along the San Joaquin River in California. The project involves extensive construction activities, including the installation of fish screens, dewatering, and rehabilitation of existing structures, with a total estimated contract value between $100 million and $200 million. This initiative is critical for improving local infrastructure and supporting environmental restoration efforts, ensuring compliance with federal regulations throughout the project lifecycle. Interested contractors must submit their proposals by December 19, 2024, and can direct inquiries to Sydney Johnson at sgjohnson@usbr.gov or by phone at 916-978-5431.
    Chatfield Irrigation Conduits Repair
    Active
    Dept Of Defense
    The Department of Defense, through the U.S. Army Corps of Engineers, is soliciting bids for the repair of irrigation conduits at the Chatfield Dam and reservoir in Colorado. The project involves the rehabilitation of a 48-inch pipe and an optional 54-inch pipe, focusing on sealing leaks and ensuring the pipes' functionality for at least another 25 years. This work is critical for maintaining the water supply infrastructure in the region. Interested contractors must submit their quotes by January 10, 2025, and are encouraged to contact Tina L. Keimig or Lee M. McCormick for further details. The estimated budget for the project ranges from $100,000 to $250,000, and compliance with federal regulations, including insurance and material usage guidelines, is mandatory.
    Y--AVC - Crowley Reach 1
    Active
    Interior, Department Of The
    The U.S. Bureau of Reclamation is seeking small business sources for the Arkansas Valley Conduit (AVC) Crowley Reach 1 construction project, which aims to provide a reliable municipal and industrial water supply from Pueblo Reservoir to 40 communities in southeastern Colorado. The project involves the installation of approximately 5.3 miles of 30-inch water transmission pipe and associated infrastructure, including valves, crossings, and traffic management measures, with an estimated cost between $45 million and $55 million. This initiative is crucial for enhancing water supply capabilities for a projected future population of 50,000 people in the service area, reflecting the government's commitment to infrastructure development and support for small enterprises. Interested businesses must submit their qualifications and bonding capabilities by January 15, 2025, to Monte Baird at mbaird@usbr.gov, with responses clearly marked in the subject line.
    Z--Folsom Right Wing Dam - North Fork Ditch Bypass
    Active
    Interior, Department Of The
    The Department of the Interior, specifically the Bureau of Reclamation, is preparing to solicit proposals for a firm fixed-price construction contract for modifications to the Folsom Right Wing Dam’s North Fork Ditch Bypass, with a focus on small business participation. The project involves critical tasks such as site preparation, removal of existing infrastructure, installation of drainage systems, and utility installations, with estimated costs ranging from $5 million to $10 million. This initiative underscores the government's commitment to enhancing infrastructure while supporting small businesses in significant construction projects. The solicitation, identified as 140R2025R0004, is expected to be posted on the Government Point of Entry around January 3, 2025, with proposals due by February 3, 2025; interested contractors must be registered in the System for Award Management (SAM) to qualify for bidding. For inquiries, contractors can contact Ronald Gamo at rgamo@usbr.gov or by phone at 916-978-4304.
    CO-ROCKY MTN NWR-REHAB VC GEOTHERMAL SYS
    Active
    Interior, Department Of The
    The U.S. Fish and Wildlife Service is soliciting proposals for a firm fixed-price construction contract to rehabilitate the geothermal heating system at the Visitor Center of the Rocky Mountain Arsenal National Wildlife Refuge in Colorado. The project involves identifying and repairing leaks within the geothermal system, which includes testing 25 vertical wells and associated lines, and requires contractors to provide detailed assessments and cost estimates for necessary repairs. This initiative underscores the government's commitment to maintaining operational efficiency and environmental integrity in its facilities. Interested contractors must submit sealed offers by January 17, 2025, with the project expected to commence within 15 calendar days following the award notice, and can contact Sanford Carson at sanfordcarson@fws.gov for further information.
    Z--Battle Creek - South Diversion Dam and Canal Removal
    Active
    Interior, Department Of The
    The Bureau of Reclamation, part of the Department of the Interior, is preparing to issue a Request for Proposal (RFP) for a firm fixed-price construction contract focused on the removal of the Battle Creek South Diversion Dam and associated canal. The project involves significant demolition work, including the dismantling of multiple diversion dams and the excavation and filling of the South Canal, with an estimated project cost ranging from $10 million to $15 million. This procurement is crucial for environmental restoration efforts in the region and is open to all responsible sources, with a requirement for 100% performance and payment bonds. Interested contractors must be registered in the System for Award Management (SAM) and can expect the solicitation to be posted on or around January 3, 2025, with proposals due approximately by February 3, 2025. For inquiries, contact Rosana Yousef Goarji at RYousefgoarji@usbr.gov or call 916-978-5004.
    Filters, Heaters, and Temperature Control Boxes
    Active
    Interior, Department Of The
    The Department of the Interior, Bureau of Reclamation, is seeking proposals for the procurement of specific Pentair filtration systems, immersible heaters, and temperature control boxes to support the expansion of the Lake Mead Hatchery. The procurement includes two sets of a 100-gallon per minute pre-assembled filter, two heaters, and two temperature control boxes, all of which are essential for maintaining optimal conditions in fish hatchery operations. This opportunity is classified as a Total Small Business Set-Aside under NAICS Code 333310, promoting participation from small businesses, and emphasizes the importance of compatibility with existing systems to avoid increased long-term costs. Interested vendors must submit their quotes by January 6, 2025, and can direct inquiries to Angela Craig at adcraig@usbr.gov or by phone at 702-293-8459.
    Rehabilitation of a bridge/water control structure
    Active
    Interior, Department Of The
    The Department of the Interior, through the U.S. Fish and Wildlife Service, is soliciting bids for the rehabilitation of a bridge and water control structure at the Quivira National Wildlife Refuge in Stafford, Kansas. The project involves significant structural repairs, including a full-depth repair of Cell 3 of the C1 Bridge, which is crucial for both vehicular access and water management within the refuge. This initiative is vital for maintaining public infrastructure and ensuring compliance with environmental and safety regulations, as the bridge has shown signs of deterioration that could impact its load capacity and safety. Interested contractors should note that the estimated contract value is between $25,000 and $100,000, with a project completion timeline of 180 days following the notice to proceed. For further inquiries, contact Shanen Fox at shanenfox@fws.gov or call 503-736-4469.
    Z--SJC AZOTEA PORTAL AND DROP STRUCTURES
    Active
    Interior, Department Of The
    The Department of the Interior, specifically the Bureau of Reclamation's Upper Colorado Regional Office, is preparing to solicit proposals for the construction of the SJC Azotea Tunnel Portal and Drop Structures in Rio Arriba County, New Mexico. The project involves critical construction activities such as water diversion, dewatering excavations, and the creation of new reinforced concrete structures, alongside earthwork, riprap removal and replacement, and the installation of drainage systems and safety access ladders. This initiative is vital for the renovation of essential water management infrastructure, with an estimated project value between $1 million and $5 million and a completion timeframe of approximately 15 months. Interested small businesses should note that the Request for Proposals is expected to be released on January 3, 2025, and can contact Mary Maestas at mmaestas@usbr.gov or by phone at 505-462-3581 for further information.
    Z--Reclamation - Interior Region 10 California - Grea
    Active
    Interior, Department Of The
    The Bureau of Reclamation, part of the Department of the Interior, is soliciting proposals for the B.F. Sisk Dam Safety of Dams (SOD) Modifications, Phase II project, located in California. This project aims to enhance dam safety through significant structural modifications, including the construction of shear keys, drainage systems, and monitoring systems for slope stability, with an estimated cost between $250 million and $500 million. The procurement is unrestricted, and contractors are required to adhere to strict environmental and labor standards, including compliance with the Davis-Bacon Act. Proposals must be submitted electronically by January 27, 2025, with a performance period extending from June 2, 2025, to June 2, 2028. Interested parties can contact Roxana Ahola at rahola@usbr.gov or by phone at 916-978-5549 for further information.