Leadville Testing Well
ID: 140FGA25R0009Type: Combined Synopsis/Solicitation
Overview

Buyer

INTERIOR, DEPARTMENT OF THEUS FISH AND WILDLIFE SERVICEFWS, GAOAFalls Church, VA, 22041, USA

NAICS

Water and Sewer Line and Related Structures Construction (237110)

PSC

NATURAL RESOURCES/CONSERVATION- WELL DRILLING/EXPLORATORY (F015)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)
Timeline
  1. 1
    Posted Apr 8, 2025, 12:00 AM UTC
  2. 2
    Updated Apr 8, 2025, 12:00 AM UTC
  3. 3
    Due May 8, 2025, 7:00 PM UTC
Description

The Department of the Interior, specifically the U.S. Fish and Wildlife Service, is seeking qualified contractors for the Leadville Testing Well project, which involves drilling an exploratory water well in Leadville, Colorado. The contractor will be responsible for drilling to a depth of 125-150 feet, ensuring compliance with all relevant federal, state, and local regulations, and completing the well between May 15 and July 31, 2025. This project is crucial for supporting sustainable fishery practices and environmental protection, emphasizing safety, pollution control, and adherence to stringent water quality standards. Interested contractors should contact Johnny Luang-Khot at johnny_luang-khot@fws.gov or call 703-358-2313 for further details and to ensure compliance with the total small business set-aside requirements.

Point(s) of Contact
Files
Title
Posted
Apr 9, 2025, 3:04 AM UTC
The Leadville National Fish Hatchery's Statement of Work outlines the requirements for drilling an exploratory water well intended for fish rearing operations. The contractor is tasked with drilling to a depth of 125-150 feet, ensuring compliance with all relevant federal, state, and local regulations. The well must be completed between May 15 and July 31, 2025, with a focus on safety and environmental protection during the project. The contractor is responsible for pollution control, safety measures, and the proper disposal of waste. Key construction specifics include the installation of PVC well casing, a protective steel casing, and adherence to stringent water quality standards. The document emphasizes the need for proper reporting, including well logs, and outlines the qualifications necessary for contractors, including licensing and previous experience. Communication with the Contracting Officer is essential for coordinating project execution and compliance. This project reflects the government's commitment to sustainable fishery practices and environmental protection while ensuring regulatory adherence.
Apr 9, 2025, 3:04 AM UTC
The document appears to be a fragmented and corrupted file, containing invalid data and unreadable characters, making it challenging to extract coherent information. However, it seems to relate to government requests for proposals (RFPs), federal grants, and state or local RFPs. Typically, such files aim to outline specific needs or project requirements for public sector initiatives, providing structure on eligibility, funding mechanisms, application processes, and timelines for prospective bidders or grant applicants. In the context of government RFPs and grants, the central purpose is often to solicit responses from organizations or individuals capable of fulfilling governmental objectives or providing necessary services. Key components generally include a statement of work, criteria for selection, evaluation processes, and funding availability. Given the critical role of proper documentation in ensuring transparency and accountability within public funding and service procurement, the integrity of such files is paramount. In conclusion, while the file lacks discernible content, its intended function likely aligns with the standard practices of governmental solicitation processes aimed at promoting effective project management and resource allocation.
Apr 9, 2025, 3:04 AM UTC
The document outlines Solicitation No. 140FGA25R0009 issued by the Federal Government for a construction contract targeting the drilling and testing of a water well in Leadville, Colorado. The contractor is expected to supply all necessary labor, materials, equipment, and supervision, adhering to various federal clauses like the Buy American Act and environmental regulations. The performance period spans from May 15, 2025, to July 31, 2025, with specific timelines for commencement and completion following the notice to proceed. Contractors must comply with stringent inspection, payment processing, and safety protocols, including handling hazardous materials appropriately. The solicitation specifies requirements for competitive bids, contract clauses, and special provisions, ensuring adherence to local, state, and federal regulations throughout the project. The overarching aim is to secure a contractor capable of delivering the project efficiently while meeting all legal obligations and standards set forth in the document.
Lifecycle
Title
Type
Leadville Testing Well
Currently viewing
Combined Synopsis/Solicitation
Similar Opportunities
CO-ROCKY MTN ARSENL NWR-GEOTHERMAL WELL REHABILITA
Buyer not available
The U.S. Fish and Wildlife Service (FWS) is soliciting proposals for geothermal well rehabilitation services at the Rocky Mountain Arsenal National Wildlife Refuge in Commerce City, Colorado. The primary objective of this procurement is to repair identified leaks in the geothermal heating systems, which includes replacing flange gaskets and insulation, as well as flushing and recharging the system to ensure its operational integrity. This initiative is crucial for maintaining sustainable energy systems within the refuge, which plays a vital role in wildlife conservation efforts. Interested small businesses must submit their quotes by May 2, 2025, and can contact Khalilah Brown at khalilahbrown@fws.gov or 571-547-3407 for further information.
F--Drill and Install New Pitless Well, Waterline and Photovoltaic System - Manzana
Buyer not available
The Department of the Interior, through the National Park Service, is seeking contractors for a project involving the drilling and installation of a new pitless well, waterline, and photovoltaic system at the Manzanar National Historic Site in California. The project requires adherence to specific construction specifications, including the installation of a well pump, air release vault, pressure tank vault, and photovoltaic system, while ensuring compliance with environmental regulations and maintaining communication with the contracting officer. This initiative is crucial for enhancing water access and sustainability at a site of historical significance. Interested contractors should submit their capability and interest statements to Bradley Metler at bradleymetler@nps.gov, as this is currently a Sources Sought Notice with an Invitation for Bid anticipated to be posted soon.
F--Dune Climb Well Replacement
Buyer not available
The National Park Service, under the Department of the Interior, is preparing to issue a Request for Quote (RFQ) for the Dune Climb Well Replacement project at Sleeping Bear Dunes National Lakeshore in Empire, MI. This project involves drilling a new well approximately 90 feet deep, connecting it to the comfort station water system, and abandoning the old well in compliance with local regulations. The contract, valued between $25,000 and $100,000, is set aside exclusively for small businesses, with a firm-fixed price expected to be awarded by early July 2015, and performance commencing in July 2025. Interested contractors should contact Jarrod Brown at jarrodbrown@nps.gov or 234-571-7515 for further details, and are encouraged to attend a site visit to better understand the project requirements.
REHABILITATE TEMPLE BAR WELL #4
Buyer not available
The Department of the Interior, through the National Park Service, is soliciting proposals for the rehabilitation of Temple Bar Well 4 at Lake Mead National Recreation Area. The project aims to enhance water flow and quality by inspecting and replacing existing infrastructure, including the pump, motor, and downpipe, while ensuring compliance with state and federal regulations. This initiative is crucial for maintaining water supply facilities and emphasizes environmental responsibility and community coordination during construction. Interested contractors should note that the estimated project value is between $100,000 and $250,000, with a total small business set-aside. Proposals are due by the specified deadline, and inquiries can be directed to Michelle Bennett at MichelleBennett@nps.gov or by phone at 702-293-8909. A pre-bid site visit is scheduled for May 6, 2025, with pre-registration required by May 5, 2025.
Keough Domestic Water Well, Black Hills National Forest, South Dakota
Buyer not available
The U.S. Department of Agriculture, specifically the Forest Service, is seeking proposals for the construction of the Keough Domestic Water Well located in the Black Hills National Forest, South Dakota. The project entails the construction, development, testing, and disinfection of a new domestic water well, including the installation of a submersible pump and all necessary connections to operationalize the well. This initiative is part of the government's commitment to enhancing water infrastructure in national forests, ensuring compliance with safety and environmental standards. Proposals are due by May 5, 2025, with a performance period from June 30, 2025, to October 28, 2025. Interested contractors can reach out to Holly Hlavac at holly.hlavac@usda.gov or Lucas Dahlman at Lucas.Dahlman@usda.gov for further inquiries.
BLM-WY-GRAY WALL LIVESTOCK WATER WELL
Buyer not available
The Bureau of Land Management (BLM) is seeking proposals for the construction of a livestock water well in Natrona County, Wyoming, under solicitation number 140L6225Q0012. The project involves drilling a well to a depth of approximately 150 feet, adhering to Wyoming's Water Well Minimum Construction Standards, and includes the installation of necessary casing and gravel packing. This initiative is crucial for enhancing water resource management, particularly for agricultural use in the region. Interested contractors must ensure active registration in the System for Award Management (SAM) and submit their quotations by May 30, 2025, following a site visit on May 14, 2025. The estimated budget for this project ranges from $10,000 to $25,000, and inquiries can be directed to Huong Le at hle@blm.gov.
LMDT MAIN VEHICLE ACCESS GATE REPLACEMENT
Buyer not available
The U.S. Department of the Interior, Bureau of Reclamation, is seeking proposals for the replacement of the main vehicle access gate at the Leadville Mine Drainage Tunnel Water Treatment Plant in Leadville, Colorado. The project involves installing a new remotely operated vertical pivot gate, which includes the removal of the existing gate and the installation of new components such as vehicle sensors and access controls, all while ensuring compliance with safety standards and maintaining a safe distance from nearby power lines. This procurement is critical for enhancing infrastructure safety and security, with an estimated contract value between $100,000 and $250,000. Interested contractors must attend a site visit on April 9-10, 2025, submit questions by April 22, 2025, and provide proposals by April 30, 2025, with a project completion timeframe of 120 calendar days post-award. For further inquiries, contact Monte Baird at MBaird@usbr.gov or call 406-247-7805.
AK-RES AGNT IN CHRG-Pipe, Drywall, and Outside Gra
Buyer not available
The Department of the Interior, specifically the U.S. Fish and Wildlife Service, is soliciting proposals for a construction contract to repair pipes, drywall, and perform outside grading at a site in Fairbanks, Alaska. The project, estimated to cost between $25,000 and $100,000, requires contractors to submit sealed bids by May 12, 2025, with work expected to commence by May 19, 2025, and be completed by June 30, 2025. This initiative is crucial for maintaining government infrastructure and ensuring the safety and efficacy of public works projects. Interested contractors should direct inquiries to Jessica Tines at jessicatines@fws.gov for further details.
Z--CO-BROWNS PARK NWR-QUARTERS 2/3 HVAC
Buyer not available
The Department of the Interior, through the U.S. Fish and Wildlife Service, is seeking a licensed contractor for the installation of HVAC systems at Browns Park National Wildlife Refuge Quarters 2 and 3 in Maybell, Colorado. The project requires the contractor to provide all necessary labor, materials, and equipment for the installation of two mini-split HVAC units, including outdoor heat pumps and indoor wall units, along with comprehensive testing and training for government staff. This initiative is crucial for ensuring efficient climate control in government housing, reflecting the commitment to maintaining operational standards and environmental compliance. Interested contractors must acknowledge the amendment to the solicitation, with the new submission deadline set for May 21, 2025, and the performance period scheduled from June 1 to July 31, 2025. For further inquiries, contact Johnny Luang-Khot at johnnyluang-khot@fws.gov or call 703-358-2313.
Y--BLM-CO GFO MILL CREEK CAMPGROUND EXPANSION
Buyer not available
The Bureau of Land Management (BLM) is seeking qualified contractors for the Mill Creek Campground Expansion project in Hinsdale County, Colorado. The project involves site work, road construction, installation of precast concrete toilets, campsite development, and bridge maintenance, aimed at enhancing visitor facilities and ensuring public safety while maintaining campground operations during construction. This initiative reflects the government's commitment to improving recreational areas, with a contract value estimated between $250,000 and $500,000, and a performance period of 365 days from the Notice to Proceed. Interested parties should contact Contracting Specialist Courtni Strickland at c1strickland@blm.gov by the closing date of May 31, 2025, following the pre-bid site visit scheduled for May 16, 2025.