WY NP GRTE 13(1), Repair North Park Road at Milepost 15.8
ID: 69056726R000006Type: Presolicitation
Overview

Buyer

DEPARTMENT OF TRANSPORTATIONFEDERAL HIGHWAY ADMINISTRATION690567 WESTERN FEDERAL LANDS DIVVANCOUVER, WA, 98661, USA

NAICS

Highway, Street, and Bridge Construction (237310)

PSC

CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS (Y1LB)
Timeline
    Description

    The Department of Transportation, through the Federal Highway Administration, is seeking bids for the "WY NP GRTE 13(1), Repair North Park Road at Milepost 15.8" project located 15 miles north of Jackson, Wyoming. The project involves essential roadway work, including asphalt surface repair, deep patching, roadway excavation, geotechnical stabilization, and the installation of an underdrain system over a 0.2-mile stretch. This initiative is crucial for maintaining the integrity and safety of the North Park Road, which is vital for access within the Grand Teton National Park. The estimated price range for the contract is between $700,000 and $2,000,000, with an anticipated solicitation date in Spring 2026 and a tentative completion date set for Fall 2026. Interested vendors can contact the Contracts G. Office at wfl.contracts@dot.gov or call 360-619-7520 for further information.

    Point(s) of Contact
    Files
    Title
    Posted
    The Grand Teton National Park in Teton County, Wyoming, is seeking bids for the "WY NP GRTE 13(1), Repair North Park Road at Milepost 15.8" project. This solicitation, part of the Yellowstone, Grand Teton, and Surrounding Area Multiple Award Task Order Contract, involves asphalt surface repair, deep patching, roadway excavation, geotechnical stabilization, and the installation of an underdrain system over a 0.2-mile stretch. The estimated price range for the project is $700,000 to $2,000,000, with an anticipated solicitation date in Spring 2026 and a tentative completion date in Fall 2026. Key work items include construction survey and staking, quality control, contractor sampling and testing, construction schedules, soil erosion and sediment control (840 LNFT of fiber roll), clearing and grubbing (0.5 ACRE), removal of a pipe culvert, roadway excavation (1,380 CUYD), select borrow (800 CUYD), stabilization geotextile (2,800 SQYD), crushed roadway aggregate (580 TON), asphalt concrete pavement (260 TON), rental equipment, general labor, permanent traffic control (removing and resetting signs and delineators), permanent pavement markings (3,200 LNFT), and extensive temporary traffic control measures.
    Lifecycle
    Title
    Type
    Similar Opportunities
    Loading similar opportunities...