Forest Service - Groveland Storm Damage Repair
ID: 127EAW26R0002Type: Solicitation
Overview

Buyer

AGRICULTURE, DEPARTMENT OFFOREST SERVICEUSDA-FS, CSA SOUTHWEST 6Albuquerque, NM, 871023498, USA

NAICS

Highway, Street, and Bridge Construction (237310)

PSC

REPAIR OR ALTERATION OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS (Z2LB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)
Timeline
    Description

    The U.S. Department of Agriculture, through the Forest Service, is soliciting proposals for the Groveland Storm Damage Repair project located in the Stanislaus National Forest, California. This total small business set-aside contract, valued between $500,000 and $1,000,000, aims to repair landslides on two Forest roads, involving tasks such as constructing retaining structures, re-establishing road prisms, resurfacing, and implementing erosion control measures. The project is critical for restoring access and safety to the affected areas following damage from severe weather events in 2023. Proposals are due by January 12, 2026, at 11:00 AM PDT, with a mandatory site visit scheduled for January 6, 2026. Interested contractors should direct inquiries to Tanya Torres at tanya.torres@usda.gov and are required to adhere to various performance and bonding requirements throughout the project duration.

    Point(s) of Contact
    Files
    Title
    Posted
    The US Department of Agriculture is seeking a contractor for the Groveland Storm Damage Repair project on the Stanislaus National Forest. This project involves repairing landslides on two Forest roads (2S30 and 1S03) near Harden Flat, CA, which were damaged during the Winter and Spring of 2023 and are eligible for Emergency Relief for Federally Owned Roads (ERFO) funding. The scope of work includes constructing reinforced soil fills, re-establishing road prisms, resurfacing roads, and ancillary work like vegetation clearing, drainage system construction, and erosion control. The estimated start date is February 2026, with a 250-calendar-day performance period, subject to botany restrictions from March 1 to July 9, and an extended restriction from December 1 to August 15 for one site. The contractor is responsible for all labor, materials, equipment, permits, and security, and must provide key personnel including a Project Manager, Superintendent, Quality Control Manager, and Project Safety Manager.
    The Groveland Storm Damage Repair project for the Stanislaus National Forest (Solicitation 127EAW26R0002) outlines a comprehensive schedule of items for storm damage remediation at three sites: Crocker Ridge (MP 2.16 and MP 6.82) and Sawmill Mountain (MP 10.9). Key tasks include mobilization, construction surveys, contractor sampling and testing, soil erosion and sediment control, and removal of asphalt. Major work involves extensive roadway excavation, installation of contractor-designed reinforced soil slopes and geogrid reinforcement, and application of aggregate surface course and asphalt concrete. Additionally, the project requires geocomposite underdrains, seeding, erosion control mats, permanent pavement markings, and temporary traffic control. All quantities are estimated, requiring contractor verification. A single award will be made, and contractors must provide pricing for all items. A bid bond is mandatory for proposals exceeding $150,000. Contractors must also submit company details, including contact information, UEI, and Tax ID, with their proposals.
    The “FOREST SERVICE SUPPLEMENTAL SPECIFICATIONS For GROVELAND STORM DAMAGE REPAIR” outlines the requirements for repairing Crocker Ridge Road and Sawmill Mountain Road in the Stanislaus National Forest. The document, part of federal government RFPs, federal grants, and state/local RFPs, details specifications for construction, materials, and project execution. Key sections include terms and definitions, bid and award procedures, scope of work, control of materials (emphasizing weed-free materials), and acceptance criteria. It also addresses legal relations, public safety, and environmental protection, particularly regarding surface water withdrawals and erosion control. The specifications cover excavation, embankment construction, and disposal of materials, with detailed requirements for compaction and finishing. The overall purpose is to ensure that repairs are conducted to Forest Service standards, maintaining safety, environmental integrity, and efficient project delivery.
    The document details the Groveland Storm Damage Repair project within the Stanislaus National Forest, Groveland Ranger District, focusing on 2023 Emergency Relief for Federally Owned Roads (ERFO) repairs. The project addresses three sites: Crocker Ridge Road at MP 2.16 and MP 6.82, and Sawmill Mountain Road at MP 10.9. It outlines travel directions, a schedule of items, best management practices, and specific repair details for each site, including grading volumes, reinforced soil slope work, and drainage systems. Key project notes emphasize road closures during construction, traffic advisory signs, contractor safety plans, erosion control, spill prevention, and the use of approved water sources and material sites. Limited operation periods are specified for each site, restricting work during certain months. The document also provides detailed drawings for deadman, asphalt concrete paving, rolled erosion control, and drainage systems, highlighting compliance with FP-14 standards and manufacturer recommendations.
    This government file outlines a comprehensive fire plan for construction and service contracts, effective August 2, 2012, within delineated contract areas. It details contractor and Forest Service responsibilities for fire prevention and suppression, including specific equipment requirements during the Fire Precautionary Period (April 1 to December 1 in California). Contractors must provide designated fire supervisors, maintain fire tools, extinguishers, spark arresters, and mufflers, and adhere to power saw regulations. A tank truck/trailer or an approved Compressed Air Foam System (CAFS) with specific performance standards is mandatory. The plan also covers general provisions like compliance with state law, permit requirements for burning/welding, blasting procedures, smoking restrictions, storage area clearances, fire reporting protocols, communication systems, and fuel clearing. Emergency precautions are governed by Project Activity Levels (PAL), which dictate minimum requirements and restrictions based on fire danger ratings. The document includes a historical climatology chart of PAL values and a variance application/agreement for operating during high-risk 'Ev' levels, demonstrating a thorough approach to fire safety and risk mitigation in contract operations.
    The Stanislaus National Forest issued a Request For Information (RFI) Form 127EAW26R0002 for the Groveland Storm Damage Repair project. This form is for submitting questions related to the solicitation, evaluation factors, statement of work, or technical data. All RFI submissions must be made in writing via an editable version of the form to Tanya.Torres@usda.gov, the Contracting Officer. Telephone inquiries will not be accepted. Responses to RFI questions will be posted as amendments to the solicitation on SAM.gov. Companies are required to provide their name, the submitter's name, the date of inquiry, and a phone number, along with their numbered questions.
    The USDA Forest Service has issued a pre-solicitation notice for the Groveland Storm Damage Repair project in Stanislaus National Forest, Tuolumne County, California. This project, identified as 127EAW26R0002, is a total small business set-aside construction initiative with an estimated value between $500,000 and $1,000,000. The scope of work involves comprehensive construction services to remediate landslides on two forest roads (2S30 and 1S03) near Harden Flat, CA. This includes building retaining structures, re-establishing road prisms, resurfacing roads, clearing vegetation, and implementing drainage and erosion control systems. The contract duration is anticipated to be 250 calendar days, with work commencing in January 2026. The solicitation, including specifications and drawings, is tentatively scheduled for posting on SAM.gov around December 5, 2025. Interested contractors must be registered in SAM.gov to be eligible for award.
    The USDA Forest Service has issued Solicitation No. 127EAW26R0002 for the Groveland Storm Damage Repair project in Stanislaus National Forest, California. This total small business set-aside construction project, valued between $500,000 and $1,000,000, involves repairing landslides on two Forest roads. The scope includes constructing retaining structures, re-establishing road prisms, resurfacing, and ancillary tasks like vegetation clearing, drainage, and erosion control. Proposals are due by January 12, 2026, at 11:00 AM PDT via email to Tanya Torres, who can also address RFIs until January 7, 2026. A mandatory site visit is scheduled for January 6, 2026. Contractors must commence work within 10 days of receiving a notice to proceed and complete it within 250 calendar days. Performance and payment bonds are required for projects exceeding $150,000, and all invoices must be submitted through the Invoice Processing Platform (IPP). Key personnel, insurance, and adherence to various FAR and AGAR clauses are also stipulated.
    Lifecycle
    Title
    Type
    Similar Opportunities
    DEVA 335272 Repair Flood Damaged Titus Canyon Road
    Interior, Department Of The
    The Department of the Interior, through the National Park Service, is soliciting proposals for the "DEVA 335272 Repair Flood Damaged Titus Canyon Road" project in Death Valley National Park. The primary objective is to repair approximately 14 miles of flood-damaged roadway and the Falls Canyon Trailhead parking area, restoring it to its pre-flood condition while implementing enhancements to prevent future flood damage. This project is crucial for maintaining access to remote areas and ensuring environmental protection, as it requires adherence to strict guidelines for wildlife and vegetation preservation. Proposals are due by January 28, 2026, at 11:00 AM MT, with a construction budget estimated between $5 million and $10 million. Interested contractors should contact Rachel Dyer at racheldyer@nps.gov for further information.
    Bighorn National Forest- GAOA Roadside Tree Clearing/Grubbing
    Agriculture, Department Of
    The U.S. Department of Agriculture's Forest Service is seeking bids for the "Bighorn National Forest - GAOA Roadside Tree Clearing/Grubbing" project, which involves clearing, grubbing, tree removal, stump removal, and material disposal along designated forest service roads in Wyoming. The contract aims to enhance forest management and safety by removing roadside trees and debris, ensuring compliance with environmental regulations and public safety standards. This Total Small Business Set-Aside opportunity has a performance period from June 1, 2026, to October 31, 2027, with proposals due by January 6, 2026, at 12:00 PM Mountain Time. Interested contractors can contact Curtis Landreth at curtis.r.landreth@usda.gov or 308-251-6801 for further details.
    TULE PROPERTY CLEARING
    Dept Of Defense
    The Department of Defense, through the U.S. Army Corps of Engineers, is soliciting proposals for the Tule Property Clearing project located in Porterville, California. This contract, valued at $19 million, involves comprehensive site preparation services, including refuse cleanup, well and fence removal, and environmental compliance measures, with a performance period from March 31, 2026, to December 31, 2026. The project is critical for clearing encumbrances in support of the Tule River Spillway Enlargement Project, ensuring environmental safety and compliance with federal regulations. Interested small businesses must submit their proposals by January 27, 2026, and direct any inquiries to La Chad Jefferson at lachad.c.jefferson@usace.army.mil or Raymond R. Greenheck at raymond.r.greenheck@usace.army.mil.
    Pactola Loop B Campground Reconstruction Project
    Agriculture, Department Of
    The Department of Agriculture, specifically the USDA Forest Service, is seeking contractors for the Pactola Loop B Campground Reconstruction Project located in the Black Hills National Forest, Pennington County, South Dakota. This project, part of a Congressionally directed initiative under the Great American Outdoors Act, aims to enhance the campground's capacity and amenities, including road improvements, the construction of a new trailhead, and upgrades to the water system. The anticipated contract, valued between $1,000,000 and $5,000,000, is designated as a total small business set-aside, with a firm fixed-price structure governed by Federal Acquisition Regulation Part 12. Interested parties must submit a Statement of Capability by January 12, 2025, and are encouraged to attend a mandatory pre-bid site visit on January 6, 2026, at 12:00 p.m. Mountain Time. For further inquiries, contact Janice King at janice.king@usda.gov or Lucas Dahlman at lucas.dahlman@usda.gov.
    Kimball Creek Culvert Replacement FR-304
    Agriculture, Department Of
    The U.S. Department of Agriculture's Forest Service is seeking proposals from qualified small businesses for the replacement of the Kimball Creek Culvert on Forest Road 304 in Grand Marais, Minnesota. The project involves comprehensive tasks including the demolition of the existing culvert, installation of a new structural plate arch, traffic control, and environmental protection measures, particularly as Kimball Creek is a designated trout stream requiring specific work timing between June 30th and September 15th. This procurement is a Total Small Business set aside, with an estimated project value between $1 million and $5 million, and proposals are expected to be submitted following the solicitation release on or about January 5, 2026. Interested vendors should contact Michelle Reed at michelle.r.reed@usda.gov for further details and ensure they are registered in the Systems for Awards Management (SAM) prior to proposal submission.
    Kimball Creek Culvert Replacement FR-304
    Agriculture, Department Of
    The U.S. Department of Agriculture's Forest Service is seeking proposals from qualified small businesses for the replacement of the Kimball Creek Culvert on Forest Road 304 in Grand Marais, Minnesota. The project involves comprehensive tasks including the demolition and removal of the existing culvert, installation of a new structural plate arch, traffic control, and environmental protection measures, particularly as Kimball Creek is a designated trout stream requiring specific work timing between June 30th and September 15th. This procurement is a Total Small Business set aside, with an estimated project value between $1 million and $5 million, and proposals are expected to be submitted following the solicitation release on or about January 7, 2026. Interested vendors should contact Michelle Reed at michelle.r.reed@usda.gov for further information and ensure they are registered in the Systems for Awards Management (SAM) at www.sam.gov.
    TULE PROPERTY CLEARING
    Dept Of Defense
    The Department of Defense, specifically the Department of the Army through the W075 Endist Sacramento office, is preparing to issue a Request for Quote (RFQ) for the Tule Property Clearing project in Porterville, California. This project involves clearing encumbrances on properties adjacent to Lake Success to facilitate the Tule River Spillway Enlargement Project, requiring the removal of various structures and materials such as fencing, irrigation piping, and concrete blocks. The contract will be set aside for small businesses under NAICS Code 238910, with an estimated issuance date of December 23, 2025, and quotes due by January 27, 2026. Interested vendors should monitor SAM.gov for updates and are encouraged to contact La Chad Jefferson or Raymond R. Greenheck for further inquiries.
    Veterans Point Trail Rehabilitation Project
    Agriculture, Department Of
    The Department of Agriculture, specifically the USDA Forest Service, is seeking contractors for the Veterans Point Trail Rehabilitation Project located in the Black Hills National Forest, South Dakota. This project involves rehabilitating a 2,959-foot asphalt trail, which includes repairing severe asphalt deterioration, reconstructing timber retaining walls, and reinforcing eroded sections, with optional bid items for additional work on a lakeshore loop. The estimated contract value ranges from $250,000 to $500,000, and the project is set aside for small businesses, with a mandatory pre-bid site visit scheduled for January 6, 2026, and responses due by January 14, 2025. Interested parties should submit a Statement of Capability to Janice King at janice.king@usda.gov or Lucas Dahlman at lucas.dahlman@usda.gov.
    In-Stream and Log Hauling Services - Mining Reach Phase II
    Agriculture, Department Of
    The Department of Agriculture, specifically the Forest Service, is seeking proposals for In-Stream and Log Hauling Services as part of the Mining Reach Phase II project in the Wind River Watershed, located in Carson, Washington. The primary objective of this procurement is to enhance salmon habitat for ESA-listed lower Columbia Steelhead by adding large woody debris to the river, which will improve water quality and streambank stability. This total small business set-aside contract, under Solicitation Number 1240BF25Q0057, is structured as a Requirements contract with a performance period from February 1, 2026, to January 31, 2031, and requires offers to be submitted electronically by January 19, 2026, at 1:00 PM (PST). Interested parties can contact Darnell Williams at Darnell.Williams@usda.gov or by phone at 458-212-6091 for further information.
    FSR 535/536 Recondition & Resurfacing - Coconino NF
    Agriculture, Department Of
    The Department of Agriculture, specifically the Forest Service, is soliciting proposals for the reconditioning and resurfacing of approximately 4.00 miles of FSR 535 and the replacement of six culverts on FSR 535 and FSR 536 in the Coconino National Forest near Flagstaff, Arizona. The project aims to enhance road conditions and infrastructure, ensuring the roads maintain their intended use while adhering to federal construction standards. This initiative is crucial for maintaining access and safety within the national forest, which supports both recreational and operational activities. Interested contractors should note that proposals are due by January 9, 2026, at 15:30 local time, with an estimated project value between $250,000 and $500,000. For further inquiries, potential bidders can contact Blaine Greenwalt at blaine.greenwalt@usda.gov.