The Department of Defense, specifically the Army, is conducting a Sources Sought notice to identify potential contractors for the provision and installation of four Battery Energy Storage Systems (BESS) at a U.S. Army Installation in Vicenza, Italy. The project involves a design-build construction effort to integrate these systems with an Uninterruptible Power Supply (UPS) function, ensuring a minimum rated power of 250 kVA/500 kWh connected to the existing Micro Grid at the installation. This initiative is crucial for enhancing energy resilience and efficiency at military installations, with an estimated project value between $1 million and $5 million. Interested firms are encouraged to submit their capabilities statements, including relevant experience and technical specifications, to the primary contacts, John Orban and Stacey Miller, by the specified deadline.