ContractSolicitationTotal Small Business Set-Aside (FAR 19.5)

Y--AK SAIC ANCHORAGE HYDRATION STATION

INTERIOR, DEPARTMENT OF THE 140FC126Q0001
Response Deadline
Dec 15, 2025
Deadline passed
Days Remaining
0
Closed
Set-Aside
Total Small Business Set-Aside (FAR 19.5)
Notice Type
Solicitation

Contract Opportunity Analysis

The Department of the Interior, through the U.S. Fish and Wildlife Service, is soliciting proposals for the installation of a hydration station at the Service Office of Law Enforcement in Anchorage, Alaska. The project requires the contractor to provide all necessary labor, materials, tools, and equipment to complete the installation, ensuring compliance with local building codes and federal regulations, with a construction magnitude of less than $25,000. This installation is crucial for enhancing operational efficiency and ensuring access to hydration for personnel at the facility. Interested small businesses must acknowledge receipt of amendments and submit proposals by the specified deadlines, with the completion date for the project set for January 23, 2026. For further inquiries, contact Tiffannie Pannell at tiffannie_pannell@fws.gov or by phone at 505-248-6792.

Classification Codes

NAICS Code
237110
Water and Sewer Line and Related Structures Construction
PSC Code
Y1ND
CONSTRUCTION OF SEWAGE AND WASTE FACILITIES

Solicitation Documents

6 Files
Sol_140FC126Q0001.pdf
PDF1189 KB12/10/2025
AI Summary
This document is a Request for Proposal (RFP) for the installation of a hydration station in Anchorage, AK, at the Service Office of Law Enforcement, with a construction magnitude of less than $25,000. The solicitation outlines performance requirements, including a start date after award issuance and completion by December 31, 2025. Key requirements include adherence to Federal Acquisition Supply Chain Security Act (FASCSA) orders, submission of a work progress plan, and compliance with environmental, historical preservation, and hazardous material regulations. Contractors must use the Invoice Processing Platform (IPP) for electronic invoicing and payment. The document also details various FAR clauses incorporated by reference, covering areas such as labor standards, bonds, and contractor responsibilities, emphasizing compliance with federal and local regulations throughout the project.
B04_WAGE_DETERMINATION_09-19-25.pdf
PDF5052 KB12/10/2025
AI Summary
No AI summary available for this file.
A04_SOW_11-19-2025.pdf
PDF918 KB12/10/2025
AI Summary
The document outlines a federal government Request for Proposal (RFP) for the installation of a new hydronic heating station. The selected contractor will be responsible for providing all necessary labor, materials, tools, and equipment to complete the installation in compliance with local building codes, plumbing standards, and other relevant regulations. Key tasks include conducting a site visit to inspect existing water lines, plumbing connections, electrical service, and wall structures, as well as submitting all required permits and approvals. The contractor must properly dispose of or recycle the removed unit and repair/reinforce walls as needed. The RFP emphasizes proper drainage, operational integrity, and wall sensor functionality for the new system, with all work to be completed by December 31, 2025.
Sol_140FC126Q0001_Amd_0001.pdf
PDF87 KB12/10/2025
AI Summary
Amendment 0001 to solicitation 140FC126Q0001 clarifies the completion date for the Hydration Station installation project. The original solicitation specified December 31, 2025, but the correct completion date is January 23, 2026. This amendment extends the period of performance for the installation from December 18, 2025, to January 23, 2026. Offerors must acknowledge receipt of this amendment by signing and submitting it with their proposals. If a proposal has already been submitted, a signed copy of this amendment page should be included. The amendment also details the administrative information for the solicitation, including the issuing and administering offices located in Falls Church, VA. Contractors are required to RSVP for the site visit 48 hours in advance.
Sol_140FC126Q0001_Amd_0002.pdf
PDF81 KB12/10/2025
AI Summary
Amendment 0002 for solicitation 140FC126Q0001, effective November 24, 2025, details submission and dissemination procedures for questions and responses related to Project Hydration Station. Offers must acknowledge receipt of this amendment by completing items 8 and 15 and returning copies, or through separate communication, prior to the specified hour and date for offer receipt. Additionally, contractors planning to attend the site visit must RSVP to the Point of Contact at least 48 hours in advance. The amendment emphasizes that all other terms and conditions of the original solicitation remain unchanged and in full force.
B09-Amendment_P00002_Q-A_0002.pdf
PDF136 KB12/10/2025
AI Summary
Amendment P00002 addresses questions regarding the installation of a hydration station at the AK-ANCHORAGE SAC Office. The new station will require electrical power and an existing 120V GFCI outlet is available. Water supply and drain lines are already in place. The wall structure at the mounting location is metal stud. Access to the federal facility for installation will require escorts for personnel.

Related Contract Opportunities

Project Timeline

postedOriginal Solicitation PostedNov 24, 2025
amendedAmendment #1Dec 9, 2025
amendedLatest AmendmentDec 10, 2025
deadlineResponse DeadlineDec 15, 2025
expiryArchive DateDec 30, 2025

Agency Information

Department
INTERIOR, DEPARTMENT OF THE
Sub-Tier
US FISH AND WILDLIFE SERVICE
Office
FWS, CONSTRUCTION A/E TEAM 1

Point of Contact

Name
Pannell, Tiffannie

Official Sources