ContractCombined Synopsis/SolicitationTotal Small Business Set-Aside (FAR 19.5)

HVAC Ductwork Cleaning

DEPT OF DEFENSE FA489725QC020
Response Deadline
May 22, 2025
Deadline passed
Days Remaining
0
Closed
Set-Aside
Total Small Business Set-Aside (FAR 19.5)
Notice Type
Combined Synopsis/Solicitation

Contract Opportunity Analysis

The Department of Defense, specifically the Department of the Air Force, is seeking qualified contractors to provide HVAC ductwork cleaning services at Mountain Home Air Force Base in Idaho. This procurement involves a one-time service requirement to clean ductwork and Variable Air Volume (VAV) boxes in Building 2700, addressing issues related to dust and debris from a recent roof replacement. The selected contractor will be responsible for supplying personnel, materials, tools, and transportation, and must adhere to federal, state, and local regulations throughout the project. Proposals are due by May 22, 2025, and interested parties must attend a pre-proposal site visit on May 8, 2025, with registration required by May 6, 2025. For further inquiries, potential bidders can contact Raphael Parker at raphael.parker.2@us.af.mil or Dan Parks at daniel.parks.14@us.af.mil.

Classification Codes

NAICS Code
561790
Other Services to Buildings and Dwellings
PSC Code
J041
MAINT/REPAIR/REBUILD OF EQUIPMENT- REFRIGERATION, AIR CONDITIONING, AND AIR CIRCULATING EQUIPMENT

Solicitation Documents

5 Files
1 Combo RFQ - Ductwork Cleaning Services.pdf
PDF7211 KBMay 13, 2025
AI Summary
The document presents a Request for Quote (RFQ) issued by the 366th Contracting Squadron at Mountain Home Air Force Base, Idaho, for HVAC ductwork cleaning services. It outlines the requirements, including a scope of work that mandates the contractor to supply personnel, materials, tools, and transportation. The RFQ emphasizes that proposals are due by May 22, 2025, and must be submitted via email to specified contacts, adhering to a format guided by federal acquisition regulations. Key components of the RFQ include the necessary compliance with federal, state, and local regulations, and the expectations for price and past performance evaluations, with contracts awarded based on the lowest evaluated price meeting acceptable standards. A pre-proposal site visit is scheduled, requiring attendees to register in advance. The document also contains stipulations regarding small business participation, reporting requirements, and clear instructions for submitting proposals. Overall, this RFQ serves as a formal solicitation for HVAC services essential for maintaining operational standards at the base, while encouraging small business participation in federal procurement processes.
Attach 2 - WD - Rev24.15-5513.pdf
PDF515 KBMay 13, 2025
AI Summary
The document appears to be a complex mixture of technical and administrative data commonly associated with government requests for proposals (RFPs), grants, and operational evaluations. Its primary focus seems to relate to outlining requirements, potential funding opportunities, and procedural frameworks necessary for various projects at federal, state, and local levels. Key sections address the importance of compliance with established guidelines and the assessment of risks, such as the identification of hazardous materials and infrastructure needs. Instructions likely pertain to frameworks for conducting evaluations, proposals for construction or renovation, and addressing potential health and safety issues within the contexts of environmental regulations. Supporting details may include references to specific standards, necessary documentation for grant applications, and outlines of the procedural rigor involved in project assessments. The narrative underscores the necessity of careful planning and execution to comply with federal and local requirements, ensuring both operational success and regulatory adherence. Overall, this document encapsulates the administrative and procedural expectations associated with initiating projects through government funding, emphasizing the need for clear communication, risk assessment, and detailed project planning.
Attach 1 - PWS Ductwork Cleaning Bldg 2700.pdf
PDF256 KBMay 13, 2025
AI Summary
The solicitation for ductwork cleaning at Mountain Home AFB, Idaho, outlines the contract requirements for cleaning ductwork and Variable Air Volume (VAV) boxes in Building 2700. The contract addresses prior issues of fire alarm activation due to dust and debris resulting from a recent roof replacement. The contractor must follow professional cleaning methodologies and provide a post-project report documenting the work with before and after photographs. Work must be completed within 60 days of contract award, and contractors will work during standard hours on weekdays, excluding federal holidays. Key requirements include the need for appropriate personnel access, adherence to environmental regulations concerning hazardous materials, and the integration of quality control measures to ensure service standards. The contractor must manage and dispose of hazardous waste responsibly, coordinating closely with the base's environmental and security personnel throughout the project to comply with federal and installation guidelines. This solicitation emphasizes the importance of safety, security, and environmental protections as integral to achieving the required cleaning services, showcasing the commitment of the government to maintain facility standards and mitigate risks as part of federal contracting procedures.
Attach 3 - HVAC Prints Bldg. 2700.pdf
PDF13885 KBMay 13, 2025
AI Summary
No AI summary available for this file.
HVAC Duct work Cleaning Questions and Answers.pdf
PDF98 KBMay 13, 2025
AI Summary
The HVAC Ductwork Cleaning Q&A document provides essential clarifications regarding a federal Request for Proposals (RFP) for duct cleaning services. Key points include conditions for equipment usage on the roof, work hours, and the specifications for cleaning. Contractors can position equipment on the roof as long as protection is used. The total facility area for duct cleaning is 85,000 square feet, with no requirement for cleaning exhaust systems. Prevailing wage rates apply as per federal regulations. The cleaning process may require limited cutting of ductwork for access, ensuring any modifications are professional in appearance. Operations can only occur within one quarter of the facility at a time. Inspections will be conducted during pre, mid, and post-cleaning phases, with a government representative present for oversight. The document outlines the nuanced requirements and constraints of the project, emphasizing compliance with federal labor standards and quality assurance protocols. This Q&A serves to clarify expectations and ensure that potential contractors understand the scope and operational requirements of the project.

Related Contract Opportunities

Project Timeline

postedOriginal Solicitation PostedMar 13, 2025
amendedAmendment #1· Description UpdatedMar 27, 2025
amendedLatest Amendment· Description UpdatedMay 13, 2025
deadlineResponse DeadlineMay 22, 2025
expiryArchive DateJun 6, 2025

Agency Information

Department
DEPT OF DEFENSE
Sub-Tier
DEPT OF THE AIR FORCE
Office
FA4897 366 CONS PKP

Point of Contact

Name
Raphael Parker

Place of Performance

Mountain Home AFB, Idaho, UNITED STATES

Official Sources