Blackwell Water Tower Rehab
ID: 12441926Q0001Type: Combined Synopsis/Solicitation
Overview

Buyer

AGRICULTURE, DEPARTMENT OFFOREST SERVICEUSDA FOREST SERVICE-SPOC EASTWashington, DC, 202500001, USA

NAICS

Water and Sewer Line and Related Structures Construction (237110)

PSC

REPAIR OR ALTERATION OF WATER SUPPLY FACILITIES (Z2NE)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)
Timeline
    Description

    The USDA Forest Service is seeking contractors for the Blackwell Water Tower Rehabilitation project at the Blackwell Job Corps Civilian Conservation Center in Laona, Wisconsin. The project involves rehabilitating the water tower, which includes cleaning and recoating the interior and exterior, replacing the overflow system, and potentially replacing a pump, with an estimated contract value between $100,000 and $250,000. This initiative is crucial for maintaining safe and reliable water infrastructure, adhering to environmental standards, and ensuring compliance with the Buy American Act. Interested contractors must RSVP for a site visit by October 28, 2025, and submit proposals that include separate technical and price components, with a deadline for submission following the site visit. For further inquiries, contact Adam Garrison at adam.garrison@usda.gov or Nicholas Zane at nicholas.zane@usda.gov.

    Point(s) of Contact
    Files
    Title
    Posted
    The USDA Forest Service is issuing Solicitation No. 12441926Q0001 for the Blackwell Water Tower Rehabilitation project at the Blackwell Job Corps Civilian Conservation Center in Laona, WI. This negotiated RFP, with an estimated value between $100,000 and $250,000, requires contractors to rehabilitate the water tower and optionally replace a pump. Performance and payment bonds are mandatory for awards over $35,000, due within 10 days of contract award. The contractor must commence work within 10 calendar days and complete it within 60 days after receiving the Notice to Proceed. A site visit is scheduled for October 30, 2025, and interested offerors must RSVP by October 28, 2025. Proposals must include separate technical and price components, adhering to specific instructions and evaluation criteria outlined in the solicitation, including compliance with Buy American Act requirements and various FAR and AGAR clauses.
    The Blackwell Job Corps Civilian Conservation Center is undertaking a water tower rehabilitation project in the Chequamegon-Nicolet National Forest. The project, overseen by the United States Department of Agriculture Forest Service, involves cleaning and recoating the water tower's interior and exterior, replacing the existing overflow system with a new duckbill valve, and regrading the surrounding area for proper drainage. Additionally, the project includes replacing and securing pipe insulation, installing new chemical injection and sample taps on the main riser with removable insulation jackets, and replacing various valves and fittings. All materials in contact with potable water must be lead-free and NSF 61 certified. The plan emphasizes field verification of existing conditions and proper utility location before excavation, ensuring adherence to safety and environmental standards for this crucial infrastructure upgrade.
    The Blackwell Job Corps Civilian Conservation Center in Laona, Wisconsin, is seeking a contractor for the Water Tower Rehabilitation project. This project includes base work for water tower rehabilitation and an optional item for pump replacement. The water tower rehabilitation involves replacing a valve, cleaning and recoating the exterior insulated sphere, stem, and bell, abrasive blasting and recoating the tank interior and platforms, replacing pipe insulation, installing sampling and chemical injection taps, reconfiguring the overflow/drain outlet, and providing a temporary bypass system with pressure monitoring and disinfection. The optional pump replacement involves removing and installing a new submersible pump in one of the existing wells, including the motor, foot valve, control box, and capacitors, followed by disinfection. The project adheres to strict codes and standards, requires licensed electricians and plumbers, and mandates third-party electrical inspections. Work hours are 8:00 AM-4:30 PM, Monday-Friday, with specific requirements for site use, waste disposal, safety, and environmental protection. Contractors must submit action and informational submittals, and a detailed project schedule outlines key milestones from award to final completion. Payment for the base item is lump sum, while the optional item is subject to funding availability and a 72-hour completion notice upon award. All work must comply with manufacturer instructions, state, and federal regulations, particularly those related to potable water systems and environmental protection.
    The BLA Water Tower Sustainable Products initiative focuses on extending the service life of an existing water tower through long-life coatings. This approach aims to reduce emissions by avoiding the reconstruction or manufacturing of a new system. The specified coatings comply with both State and Federal VOC limitations, indicating an emphasis on environmental sustainability and regulatory adherence in this government project.
    This government file outlines a Schedule of Items for a Water Tower Rehabilitation project, detailing both base and optional items. The base item is 'Water Tower Rehabilitation' and the optional item is 'Pump Replacement'. Both are listed with a quantity of one and currently show no associated unit or total prices, indicating that this document is likely a preliminary schedule within an RFP or grant application. The structure suggests a breakdown of costs for a project focused on maintaining and upgrading water infrastructure.
    This document addresses contractor questions regarding a government project, likely an RFP. Key clarifications include the project schedule, which begins post-contract award with bonding and submittals due as prescribed, followed by physical work, considering weather and potential extensions. It confirms that prevailing wages are applicable, with a Wage Rate Determination provided as "A6_Attachment 5 Wage Rate Determinations." No specific onsite training requirements are mandated. Lastly, the document clarifies that the specification for the exterior bowl (insulated portion) surface preparation will not be changed to include sphere and riser insulation replacement, as surface prep for insulated areas is already covered.
    This document clarifies that the scope of work includes recording the volume of water lost through the pressure relief valve when a bypass system is in operation. This detail is relevant for federal and state RFPs, particularly in projects involving water management, infrastructure, or environmental monitoring, where precise measurement and accountability of water flow and potential loss are critical for compliance, efficiency, and resource management.
    This government file details a Request for Proposal (RFP) for a project involving the maintenance and upgrade of a water tank, likely for the Blackwell Job Corps Center. It addresses various contractor questions regarding project scope, safety requirements, timelines, and technical specifications. Key aspects include mandatory on-site supervision, an expected project start following contract award (seasonally adjusted), and the unlikelihood of Asbestos Containing Material or Lead Paint based on the tank's construction year, though testing is scheduled. The project involves cleaning, spot repair, and recoating the tank's exterior, securing and replacing pipe insulation, and specific preparation requirements for the tank's interior. The contractor is responsible for providing temporary pressure to the facility, draining, filling, and disinfecting the tower. The $250k cost magnitude is a flexible estimate. Other details cover well specifications, installation of a chemical injection tap, and the absence of lettering or logos on the tank. The contractor will conduct coatings inspections, with potential third-party quality assurance. The document also raises a concern about flies in the tower and requests a cost proposal for sealing manways.
    Lifecycle
    Title
    Type
    Combined Synopsis/Solicitation
    Similar Opportunities
    Water System Upgrades Santa Fe National Forest
    Buyer not available
    The Department of Agriculture, specifically the Forest Service, is seeking contractors for the Water System Upgrades project at the Santa Fe National Forest in New Mexico. This procurement involves the replacement of three drinking water systems located at Jacks Creek Campground, Field Tract Campground, and the Panchuela Administrative Site, which are critical for supporting high-use recreational areas and administrative functions. The project includes extensive demolition and construction tasks, such as installing new water lines, pump houses, and associated infrastructure, with a firm-fixed-price contract valued between $500,000 and $1,000,000. Interested parties must attend a mandatory site visit on December 2, 2025, at 11:00 AM and submit their proposals by December 9, 2025, at 3:30 PM PST; for further inquiries, contact Blaine Greenwalt at blaine.greenwalt@usda.gov.
    Z--DEVA 318717 - Rehab Furnace & Cow Creeks WTP/WWTP
    Buyer not available
    The National Park Service (NPS) is soliciting proposals for the rehabilitation of the Furnace Creek and Cow Creek water and wastewater treatment systems at Death Valley National Park, under Solicitation No. 140P2025R0082. The project aims to modernize critical infrastructure, addressing frequent service interruptions and ensuring the availability of potable water while mitigating health, safety, and environmental risks. This significant undertaking, with a construction magnitude exceeding $10 million, includes the replacement of wastewater laterals, upgrades to treatment facilities, and the installation of new water mains and lift stations. Interested contractors must submit proposals by January 14, 2026, and are encouraged to attend a pre-proposal site visit on November 5, 2025, to gain a comprehensive understanding of the project scope. For further inquiries, contact Amber Hughes at amberhughes@nps.gov.
    Fountain City Service Base (FCSB) 1st Floor Mississippi River Project Office (MRPO) Renovation Design-Build Construction Project
    Buyer not available
    The Department of Defense, specifically the U.S. Army Corps of Engineers (USACE), is preparing to solicit a design-build contract for the renovation of the 1st floor of the Fountain City Service Base Office Building in Wisconsin. The project entails comprehensive design and construction services, including engineering, development of plans and specifications, and the creation of final As-Built/Record Drawings, with an estimated contract value between $1 million and $5 million. This renovation is crucial for enhancing the operational capabilities of the Mississippi River Project Office, and the solicitation is expected to be issued in late December 2025 or early January 2026, with contract awards anticipated by September 30, 2026. Interested contractors must ensure they are registered in the System for Award Management (SAM) and can contact Scott E. Hendrix or Kenneth Eshom for further information.
    Y--YELL 310402 REPLACE GRANT WASTEWATER TREATMENT PLA
    Buyer not available
    The Department of the Interior, through the National Park Service (NPS), is soliciting proposals for the YELL 310402 Grant Wastewater Treatment Plant and Collections and Canyon Collections project, with an estimated value exceeding $10 million. The procurement aims to replace the Grant Village Wastewater Treatment Plant and rehabilitate the wastewater collection systems in both Grant and Canyon Villages, involving the construction of new facilities, installation of process equipment, and demolition of existing structures. This project is critical for enhancing wastewater management and environmental protection within Yellowstone National Park. Proposals are due by January 7, 2026, and interested contractors should contact Vicki Freese-Supler at vickilfreese-supler@nps.gov or 720-402-8467 for further details.
    Y--YELL 326133 REHABILITATE CANYON VILLAGE WASTEWATER
    Buyer not available
    The Department of the Interior, specifically the National Park Service (NPS), is soliciting proposals for the "YELL 326133 Rehabilitate Canyon Village Wastewater Treatment Systems" project at Yellowstone National Park, Wyoming. This federal contract involves extensive rehabilitation and upgrade work on wastewater treatment facilities, including the demolition of existing structures and the construction of new facilities, with a project magnitude exceeding $10 million. The contractor is expected to commence work within 10 calendar days of receiving the notice to proceed and complete the project within 975 calendar days, with a projected completion date of November 30, 2028. Interested parties must submit their proposals by December 19, 2025, and can direct inquiries to Vicki Freese-Supler at vickilfreese-supler@nps.gov or by phone at 720-402-8467.
    GAOA Vault Toilet Replacement - Santa Fe National Forest
    Buyer not available
    The Department of Agriculture, specifically the Forest Service, is soliciting proposals for the GAOA Vault Toilet Replacement project at the Santa Fe National Forest in New Mexico. The project entails the demolition of eight existing toilet facilities and their replacement with new vault toilets, addressing significant health and safety concerns associated with the current facilities. This initiative is crucial for maintaining public health and safety in recreational areas, as the existing toilets include composting, vault, and flush toilets that are no longer adequate. Interested contractors should note that the estimated contract value is between $500,000 and $1,000,000, with proposals due by December 9, 2025, and a mandatory site visit scheduled for December 3, 2025. For further inquiries, contact Blaine Greenwalt at blaine.greenwalt@usda.gov.
    PRESOLICITATION NOTICE FOR UPPER APPLETON WALL REPAIR, APPLETON, OUTAGAMIE COUNTY, WISCONSIN
    Buyer not available
    The Department of Defense, through the United States Army Corps of Engineers - Chicago District, is preparing to solicit bids for the Upper Appleton Wall Repair project located in Appleton, Outagamie County, Wisconsin. The project involves the rehabilitation of a 150-year-old masonry stone wall, which includes removing existing materials, applying a waterproofing system, and replacing materials on both sides of the Upper Appleton hydropower plant, addressing increased seepage issues. This construction effort is critical for maintaining the structural integrity of the hydropower facility and is estimated to cost between $5 million and $10 million, with a completion timeline of 439 calendar days. Interested small business contractors must register with the System for Award Management (SAM) and the DoD Procurement Integrated Enterprise Environment (PIEE) to access the solicitation, which is expected to be advertised in the second quarter of Fiscal Year 2026. For further inquiries, contact Ericka Hillard at ericka.d.hillard@usace.army.mil or by phone at 312-846-5378.
    Y--YOSE 215363 - Replace Tuolumne Meadows WWTP
    Buyer not available
    The National Park Service (NPS) is soliciting proposals for the replacement of the Tuolumne Meadows Wastewater Treatment Plant (WWTP) at Yosemite National Park in California, under solicitation number 140P2026R0001. The project aims to construct a new facility adjacent to the existing WWTP, which is over 50 years old and serves a significant visitor area, including campgrounds and a visitor center, handling up to 60,000 gallons of wastewater per day. This comprehensive construction project, with an estimated value exceeding $10 million, includes various components such as influent pumping, liquid treatment, and solids handling, while ensuring the existing facility remains operational until the new plant is commissioned. Proposals are due by January 16, 2026, and interested contractors should direct inquiries to Mark Barber at markbarber@nps.gov or call 721-621-7310.
    12905B25R0002 Amendment 0005 - Solicitation for Water Well Repair USDA-ARS-PWA Dubois ID
    Buyer not available
    The Department of Agriculture, specifically the Agricultural Research Service (ARS), is soliciting proposals for the repair of a water well at the Range Sheep Production Efficiency Research Center in Dubois, Idaho. The project involves drilling a new well, demolishing existing infrastructure, and installing new piping and electrical connections, with an estimated construction cost between $1,000,000 and $5,000,000. This procurement is critical for ensuring the operational efficiency of the research center's water supply system. Interested contractors must submit their proposals by January 30, 2026, and are encouraged to direct any inquiries to Theodore Blume at the USDA via email at theodore.blume@usda.gov.
    Relocate Schofield Barracks Deep Wells Above Ground, Bldg 1580, Schofield Barracks, Oahu, Hawaii
    Buyer not available
    The Department of Defense, through the U.S. Army Corps of Engineers, is seeking letters of interest from prime contractors for a potential design-bid-build construction project to relocate deep wells at Schofield Barracks, Oahu, Hawaii. The project involves drilling four wells approximately 800 feet deep, with a capacity to deliver a minimum of 2,000 gallons per minute, and includes the construction of a protective roof structure for the motors. This initiative is critical for ensuring a reliable water supply to meet peak demand during the summer months. Interested contractors must submit their qualifications by January 5, 2026, with a project magnitude estimated between $50 million and $100 million. For inquiries, contact Christie Lee at christie.s.lee@usace.army.mil or Jennifer Ko at jennifer.i.ko@usace.army.mil.