PLA Market Survey - Fort Hunter Liggett, CA
ID: W912QR-26-FHL-PWTType: Special Notice
Overview

Buyer

DEPT OF DEFENSEDEPT OF THE ARMYW072 ENDIST LOUISVILLELOUISVILLE, KY, 40202-2230, USA
Timeline
    Description

    The Department of Defense, through the U.S. Army Corps of Engineers Louisville District, is conducting a Project Labor Agreement (PLA) Market Survey for a significant construction project at Fort Hunter Liggett, California. The project involves modernizing the potable water transmission and storage infrastructure, which includes installing a new 5.25-mile transmission line, constructing two new storage tanks, building an access road, and upgrading existing well facilities, with an estimated cost exceeding $35 million. The survey aims to gather insights from the construction community regarding the potential use of PLAs to enhance efficiency and labor stability for this large-scale project. Interested parties are encouraged to submit their comments and feedback via email to Adam M. Brooks by 2:00 PM Eastern Standard Time on December 16, 2025.

    Point(s) of Contact
    No information provided.
    Files
    No associated files provided.
    Lifecycle
    Title
    Type
    Special Notice
    Similar Opportunities
    Fort Hunter Liggett (FHL) - Modernize Potable Water Transmission and Storage Infrastructure
    Buyer not available
    The Department of Defense, through the U.S. Army Corps of Engineers, is seeking small business contractors for a project to modernize the potable water transmission and storage infrastructure at Fort Hunter Liggett, California. The project involves the design and construction of a new 5.25-mile transmission line, installation of two new storage tanks, construction of an access road, and upgrades to existing water source facilities, with an estimated contract duration of 540 days and a budget range of $25 million to $100 million. Interested small businesses, including those certified as HUBZone, 8A, Woman-Owned, or Service-Disabled Veteran Owned, must respond to the sources sought notice by December 5, 2025, at 3:00 PM EST, providing necessary documentation and experience details through the designated survey link. For further inquiries, contact Adam Brooks at adam.m.brooks@usace.army.mil.
    PLA – Relocate Schofield Barracks Deep Wells Above Ground, Bldg 1580, Schofield Barracks, Oahu, Hawaii
    Buyer not available
    The U.S. Army Corps of Engineers, Honolulu District, is seeking input from the construction community regarding the potential use of Project Labor Agreements (PLAs) for the large-scale construction project titled "Relocate Schofield Barracks Deep Wells Above Ground, Bldg 1580" in Oahu, Hawaii. This design-bid-build project involves drilling four wells approximately 800 feet deep and 24 inches in diameter, with the goal of managing peak water demand at Schofield Barracks during the summer months. The project is significant, exceeding $35 million, and is subject to new regulations mandating the use of PLAs for federal construction projects of this scale starting January 22, 2024. Interested parties are invited to submit their comments and responses to specific questions regarding the use of PLAs by January 5, 2026, at 2:00 p.m. Hawaii Standard Time, via email to Christie Lee and Jennifer Ko, with the notice identification number W9128A-26-Z-0003 included in the subject line.
    Sources Sought for Project Labor Agreements (PLAs): 9 Mile Pump Station
    Buyer not available
    The Department of Defense, specifically the U.S. Army Corps of Engineers (USACE) Detroit District, is conducting market research for the potential use of Project Labor Agreements (PLAs) for the 9 Mile Pump Station project in St. Clair Shores, Michigan. The objective is to gather comments from the construction community regarding the feasibility of PLAs and to assess the local labor market's recent construction history, as the project involves constructing a high-capacity stormwater pump station with an estimated cost between $25 million and $50 million. PLAs are significant for large-scale federal construction projects, as they establish employment terms and conditions, promoting efficiency in procurement. Interested parties should direct their comments and inquiries to Michelle Barr or Lisa May via email, with the anticipated solicitation expected in summer 2026 and a project duration of over 18 months.
    PLA Market Survey - Repair AMSA / ECS - Arden Hills Army Reserve Center, Minnesota
    Buyer not available
    The Department of Defense, through the U.S. Army Corps of Engineers Louisville District, is conducting a market survey regarding the potential use of Project Labor Agreements (PLAs) for the repair of the Area Maintenance Support Activity/Equipment Concentration Site (AMSA/ECS) vehicle maintenance facility at the Arden Hills Army Reserve Center in Minnesota. The project, estimated to cost $35 million or more, involves extensive repairs to a 31,658 square foot facility, including upgrades to HVAC systems, electrical distribution, fire safety systems, and structural enhancements to extend the facility's lifespan by 25 years. The Corps is particularly interested in feedback from the construction community on the use of PLAs, including insights on local labor availability, scheduling concerns, and potential cost impacts associated with PLA requirements. Interested parties should submit their comments via email to Adam Brooks at adam.m.brooks@usace.army.mil by 2:00 PM Eastern Standard Time on December 16, 2025.
    PLA Survey -Hydrant Area C Refueling Facilities, Fairchild Air Force Base (FAFB), Spokane, Washington (WA)
    Buyer not available
    The Department of Defense, through the U.S. Army Corps of Engineers Seattle District, is conducting a Project Labor Agreement (PLA) survey for the upcoming construction of Hydrant Area C Refueling Facilities at Fairchild Air Force Base in Spokane, Washington. This project involves the construction of a new hydrant loop, including hydrant pits, fuel piping, and a pumphouse, along with necessary environmental mitigation measures for contaminated soil and groundwater. The anticipated period of performance is approximately 1035 calendar days, with a construction award targeted for fiscal year 2027, and the estimated cost of construction ranges between $25 million and $100 million. Interested parties are encouraged to provide comments regarding the use of a PLA and can contact Linda O'Brien at linda.s.obrien@usace.army.mil or Susan Newby at susan.f.newby@usace.army.mil for further information.
    Project Labor Agreement Survey - Construction Of The Ground Based Strategic Deterrent (GBSD) Sentinel Consolidated Vehicle Maintenance Complex (CVMC), Minot AFB, ND
    Buyer not available
    The Department of Defense, specifically the U.S. Army Corps of Engineers Omaha District, is soliciting comments from the construction community regarding the potential use of Project Labor Agreements (PLA) for the construction of the Ground Based Strategic Deterrent (GBSD) Sentinel Consolidated Vehicle Maintenance Complex (CVMC) at Minot Air Force Base, North Dakota. This large-scale construction project is estimated to have a magnitude between $100 million and $250 million and will involve the design-bid-build delivery method, requiring contractors to provide a complete facility that meets specific Department of Defense standards. The project includes the construction of two buildings, extensive utility work, and compliance with cybersecurity requirements, emphasizing the importance of labor-management stability and efficiency in federal procurement. Interested parties must submit their responses by 2:00 PM Central Time on December 30, 2025, to Ariel Vogan at ariel.e.vogan@usace.army.mil, with a courtesy copy to John Solomon at john.s.solomon@usace.army.mil, ensuring that submissions do not exceed five pages.
    Project Labor Agreement Survey - Construction Of The Ground Based Strategic Deterrent (GBSD) Sentinel Security Forces Operations Complex (SFOC), Minot AFB, ND
    Buyer not available
    The Department of Defense, through the U.S. Army Corps of Engineers Omaha District, is soliciting comments from the construction community regarding the potential use of Project Labor Agreements (PLA) for the construction of the Ground Based Strategic Deterrent (GBSD) Sentinel Security Forces Operations Complex (SFOC) at Minot Air Force Base, North Dakota. This large-scale construction project, with an estimated cost between $100 million and $250 million, aims to establish a consolidated facility that includes various operational spaces and infrastructure necessary for security forces operations. The use of PLAs is intended to promote efficiency and stability in labor relations for such significant federal projects, as mandated by Executive Order 14063. Interested parties are required to submit their responses by 2:00 PM Central Time on December 30, 2025, to Ariel Vogan at ariel.e.vogan@usace.army.mil, with a courtesy copy to John Solomon at john.s.solomon@usace.army.mil, ensuring that submissions do not exceed five pages and include relevant contact information.
    Y--RFI - PLA Feasibility for COTP Design-Build
    Buyer not available
    The Department of Energy is seeking information regarding the feasibility of a Project Labor Agreement (PLA) for the California Oregon Transmission Project (COTP) Series Capacitor Replacement Design-Build Project. This Request for Information (RFI) aims to gather insights on the potential implementation of a PLA, which is crucial for ensuring efficient labor management and project execution in large-scale construction projects. The project falls under the NAICS code 237130, focusing on the construction of power and communication line structures, highlighting its significance in enhancing energy infrastructure. Interested parties can reach out to Jonathan Dittmer at dittmer@wapa.gov or call 605-353-2641 for further details.
    USACE SPK DBB Construction - Military Ocean Terminal Concord (MOTCO) Waterfront Water Distribution Phase 1 – Concord, California
    Buyer not available
    The Department of Defense, through the U.S. Army Corps of Engineers (USACE) Sacramento District, is conducting market research for the Military Ocean Terminal Concord (MOTCO) Waterfront Water Distribution Phase 1 project in Concord, California. This project aims to enhance potable water supply and fire flow capabilities by replacing and upgrading existing water lines and associated infrastructure, including the installation of a chlorination station. The anticipated construction contract, valued between $10 million and $25 million, is expected to be solicited around March 2026, with a completion timeline of approximately 540 calendar days from the Notice to Proceed. Interested firms are encouraged to submit capability statements to Erik Quiralte at Erik.Quiralte@usace.army.mil by 5:00 p.m. PST on December 12, 2025, to demonstrate their qualifications and capacity for this project.
    Ft. Buchanan Microgrid
    Buyer not available
    The Department of Defense, specifically the Department of the Army, is conducting a market survey for the construction of a microgrid at Fort Buchanan, Puerto Rico. This project involves the design and installation of a microgrid system featuring twelve 570 KW diesel generators, a battery energy storage system, and various supporting infrastructure, aimed at enhancing energy resilience and operational continuity. The estimated contract duration is approximately 1,141 calendar days, with a projected cost range between $25 million and $100 million. Interested small businesses, including those certified as HUBZone, 8A, Woman-Owned, or Service-Disabled Veteran-Owned, must submit their responses by December 8, 2025, at 2:00 PM Eastern Time, to Henry Caldera at henry.c.caldera@usace.army.mil.