The US Army Corps of Engineers, Vicksburg District, is soliciting bids for seepage remediation along the East Bank Mississippi River Levee in Bolivar County, Mississippi, specifically from Francis to Round Lake (Item 615-L). The project, with solicitation number W912EE-YY-X-XXXX and contract number W912EE26RA005, has an issue date of November 2025. The detailed plans include boring legends, profiles for borrow, foundation, and tertiary materials, as well as extensive plan sheets covering various stations of the levee, ditches, borrow areas, typical sections, details, tabulations, water control structures, and right-of-way information. Key aspects include adherence to NAD83/HARN, SPCS, MS West horizontal datum, NAVD88 vertical datum, and U.S. Survey Foot units. The contractor will also add gravel surfacing to the levee crown after berm construction. CPT data is available upon request.
The United States Army Corps of Engineers (USACE) Vicksburg District has issued Solicitation No. W912EE26RA005 for the Bolivar County, Mississippi, FC/MR&T, EBMRL, Seepage Remediation, Francis to Round Lake, Item 615-L project. This procurement is a 100% Set-aside for Mississippi River Levees, Construction of Levee Enlargements and Berms, MATOC contract holders, under NAICS Code 237990, with a small business size standard of $45,000,000. The work involves furnishing all plant, labor, materials, and equipment to construct Item 615-L seepage berms, including mobilization, clearing, grubbing, embankment, ramps, ditches, culverts, water control structures, levee surfacing, mowing, turfing, erosion control, stormwater pollution prevention, and environmental protection. The estimated value of the project is between $5,000,000 and $10,000,000. Proposals are due by February 6, 2026, at 02:00 PM local time and must include a complete and signed SF-1442, a complete bid schedule, and an accurately completed copy of the Offeror's Representations and Certifications, or a certification of online availability at www.sam.gov. Inquiries must be submitted via ProjNet, and contractors must be registered in SAM. Performance and payment bonds will be required after award.