Follow-up Sources Sought - Construction of Power Independence Mission Control Station, Buckley Space Force Base, Colorado
ID: W9128FSM018Type: Special Notice
Overview

Buyer

DEPT OF DEFENSEDEPT OF THE ARMYW071 ENDIST OMAHAOMAHA, NE, 68102-4901, USA

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

CONSTRUCTION OF OTHER NON-BUILDING FACILITIES (Y1PZ)
Timeline
    Description

    The Department of Defense, specifically the U.S. Army Corps of Engineers, Omaha District, is conducting market research for the construction of the Power Independence Mission Control Station at Buckley Space Force Base in Colorado. This project aims to establish a facility that provides utility and backup power to support the Space-Based InfraRed Systems mission, including the construction of a new power plant, backup generators, and associated infrastructure. The estimated construction cost is between $25 million and $100 million, with a contract award anticipated in the second or third quarter of fiscal year 2025. Interested prime contractors with bonding capabilities of at least $65 million must submit their qualifications and experience by 2:00 p.m. CST on January 30, 2025, to Brandon Landis at brandon.p.landis@usace.army.mil, with a courtesy copy to Brittany Gull at brittany.c.gull@usace.army.mil.

    Point(s) of Contact
    Files
    No associated files provided.
    Similar Opportunities
    Construct Redundant Electrical Supply, Buckley SFB, CO
    Dept Of Defense
    The Department of Defense, specifically the Department of the Army through the W071 Endist Omaha office, is soliciting proposals for the construction of a redundant electrical supply at Buckley Space Force Base in Colorado. The project aims to replace aging cable and switchgear, install a new backup commercial power feed, and enhance mission reliability by eliminating single points of failure, thereby aligning with Uptime Institute Tier IV Standards. This construction initiative is critical for ensuring the resiliency and operational continuity of the facility's power supply. Interested small businesses are encouraged to reach out to Scott Dwyer at Scott.Dwyer@usace.army.mil or call 402-995-2584 for further details, with proposals due by the revised deadline as indicated in the solicitation amendments.
    B-21 60 Row EPS South
    Dept Of Defense
    The Department of Defense, specifically the U.S. Army Corps of Engineers Omaha District, is seeking responses to a Sources Sought Notice for the construction of five new pre-engineered metal Environmental Protection Shelters (EPSs) at Ellsworth Air Force Base in South Dakota. The project involves a design-bid-build delivery method and includes the construction of approximately 20,000 square feet of facilities designed to accommodate B-2A aircraft maintenance, along with associated airfield paving and support kiosks. This initiative is critical for enhancing the operational capabilities of the B-21 program and ensuring compliance with various Department of Defense construction standards. Interested contractors must submit their responses by 2:00 PM on January 28, 2025, to James Willett at james.r.willett@usace.army.mil, with a project magnitude estimated between $25 million and $100 million, and an anticipated contract award in the second quarter of fiscal year 2026.
    EAFB B-21 Alert Facility
    Dept Of Defense
    The Department of Defense, through the US Army Corps of Engineers-Omaha District, is seeking capable contractors for the upcoming B-21 Alert Facility project at Ellsworth Air Force Base in South Dakota. This project involves the construction of a 22,000 square foot lodging and readiness facility, along with an Aerospace Ground Equipment Warm Storage Facility, utilizing a design-bid-build approach. The work will include the demolition of existing structures, the construction of new facilities with specialized foundations, and adherence to military construction standards, including sustainability and antiterrorism requirements. Interested contractors must demonstrate substantial experience with similar projects and possess bonding capability of at least $50 million for single jobs. Responses to the Sources Sought Notice are due by 2:00 PM on January 28, 2025, and should be directed to James Willett at james.r.willett@usace.army.mil, with a copy to Brittany Gull at brittany.c.gull@usace.army.mil. The anticipated award date for the construction contract is in the second quarter of fiscal year 2026.
    Buckley Space Force Base - Grounds Maintenance
    Dept Of Defense
    The Department of Defense, specifically the Department of the Air Force, is seeking capable contractors to provide grounds maintenance services at Buckley Space Force Base in Aurora, Colorado. The contractor will be responsible for ensuring the health and appearance of various landscapes, including improved, semi-improved, and unimproved areas, through tasks such as mowing, trimming, weed control, and irrigation management, while adhering to environmental regulations and quality control measures. This procurement is crucial for maintaining a professional and welcoming environment at the base, with a focus on promoting healthy vegetation growth and compliance with state air quality regulations, particularly those affecting lawn and garden equipment. Interested contractors should contact Zach McKie at zachariah.mckie@spaceforce.mil or Matt Kennedy, SSgt, at matthew.kennedy.24@spaceforce.mil for further details, as this opportunity is currently in the market research phase.
    PLA Survey B-21 Alert Facility
    Dept Of Defense
    The Department of Defense, specifically the Army Corps of Engineers Omaha District, is soliciting feedback from the construction community regarding the potential use of Project Labor Agreements (PLA) for the upcoming construction of the B-21 Alert Facility at Ellsworth Air Force Base in South Dakota. This project involves the construction of a 22,000 square foot lodging and readiness facility for B-21 air crews, along with an Aerospace Ground Equipment Warm Storage Facility, and is expected to exceed $35 million in cost. The use of PLAs is intended to promote efficiency and stability in labor management for large-scale federal construction projects, and interested parties are invited to submit their comments by 2:00 p.m. CST on January 28, 2025, to James Willett at james.r.willett@usace.army.mil, with a courtesy copy to Brittany Gull at brittany.c.gull@usace.army.mil. The estimated construction contract award is anticipated in the second quarter of Fiscal Year 2026, with a project magnitude between $25 million and $100 million.
    Pre-Solicitation Notice - Ground Based Strategic Deterrent (GBSD) Consolidated Maintenance Facility (CMF), F.E. Warren Air Force Base (AFB), Wyoming (WY)
    Dept Of Defense
    The Department of Defense, through the Department of the Army, is preparing to solicit bids for the construction of a Ground Based Strategic Deterrent (GBSD) Consolidated Maintenance Facility at F.E. Warren Air Force Base in Wyoming. This project falls under the NAICS code 236220, focusing on commercial and institutional building construction, and aims to enhance the operational capabilities of the facility. The anticipated solicitation date is projected to be between late January 2025 and early March 2025, and interested contractors can reach out to the primary contact, Brandon Landis, at brandon.p.landis@usace.army.mil or by phone at 402-995-2056 for further information and updates.
    PLA Survey Ellsworth AFB B-21 60 Rows South EPSs
    Dept Of Defense
    The Department of Defense, through the U.S. Army Corps of Engineers Omaha District, is soliciting input from the construction industry regarding the potential use of Project Labor Agreements (PLAs) for a large-scale construction project at Ellsworth Air Force Base in South Dakota, with a budget exceeding $35 million. The project involves the construction of five new pre-engineered metal Environmental Protection Shelters (EPSs) designed to accommodate B-2A aircraft, along with associated support facilities, and must adhere to stringent Department of Defense standards. Interested parties are invited to submit their comments on the use of PLAs, addressing various factors such as local labor availability and project scheduling, by 2:00 p.m. CST on January 28, 2025, to the designated contacts, James Willett and Brittany Gull, via the provided email addresses. The estimated construction contract award is anticipated in the second quarter of Fiscal Year 2026, with a project completion timeframe of 730 calendar days from the notice to proceed.
    PLA Survey - Renovate Sijan Hall Phase One, USAFA, CO
    Dept Of Defense
    The Department of Defense, through the Corps of Engineers Omaha District, is soliciting feedback from the construction community regarding the potential use of Project Labor Agreements (PLA) for the renovation of Sijan Hall at the United States Air Force Academy in Colorado Springs, Colorado. This project, estimated to cost between $100 million and $250 million, involves a comprehensive renovation of approximately 135,000 square feet of the facility, which serves as a dormitory for cadets and requires updates to meet current design standards and building codes. Interested parties must submit their responses to specific questions regarding local PLA usage, labor shortages, and project scheduling by 2:00 PM CST on February 7, 2025, to Scott Dwyer at Scott.Dwyer@usace.army.mil, with the anticipated construction award expected in the first quarter of Fiscal Year 2026.
    FY23 MISSILE ASSEMBLY SUPPORT BUILDING TACTICAL EQUIPMENT MAINTENACE FACILITY (TEMF), WHITE SANDS MISSILE RANGE (WSMR), DONA ANA COUNTY, NEW MEXICO
    Dept Of Defense
    The Department of Defense, through the Department of the Army, is soliciting proposals for the construction of a Tactical Equipment Maintenance Facility (TEMF) at White Sands Missile Range in Dona Ana County, New Mexico. This project involves the development of an 18,800 square foot vehicle maintenance facility, which will include various maintenance and training spaces, as well as advanced security and energy efficiency features, aiming for LEED Silver certification. The estimated construction cost ranges from $25 million to $100 million, with proposals due on or about February 20, 2025, and plans expected to be issued around January 6, 2025. Interested contractors must be registered with the System for Award Management (SAM) and can contact Diana Keeran at diana.m.keeran@usace.army.mil or 505-342-3263 for further information.
    Construction of a KC-46 Two-Bay Hangar at March Air Reserve Base (ARB), CA
    Dept Of Defense
    The Department of Defense, through the U.S. Army Corps of Engineers, is soliciting proposals for the construction of a KC-46 Two-Bay Maintenance Hangar at March Air Reserve Base in California. This Design-Bid-Build project aims to enhance maintenance capabilities for the KC-46A aircraft, including the construction of a hangar approximately 156,585 square feet in size, along with associated infrastructure improvements and environmental compliance measures. The project is critical for ensuring military readiness and operational efficiency, with an estimated cost between $100 million and $250 million. Proposals are due by March 18, 2025, and interested contractors should direct inquiries to Lindsay Lawrence at lindsay.b.lawrence@usace.army.mil or Renee Booth at meranda.r.booth@usace.army.mil.