This amendment to Solicitation 80GSFC25R0001 revises key sections of a Request for Proposal (RFP) issued by NASA Goddard Space Flight Center. The purpose is to update Clause 52.217-9, "Option to Extend the Term of the Contract"; the "Price Proposal Instructions" provision; and Provision GSFC 52.215-300, "Source Selection And Evaluation Factors – General." Key changes include limiting the total contract duration to 15 months, including options; setting a Firm-Fixed-Price ceiling of $1,500,000, with specific allocations for baseline and option periods; and outlining the source selection process. The evaluation factors—Mission Suitability, Cost, and Past Performance—are detailed, with Mission Suitability being more important than Past Performance, and both significantly more important than Price. Offers must acknowledge this amendment to avoid rejection, and any changes to previously submitted offers must reference the amendment and be received by the specified deadline.
Amendment 3 for Solicitation 80GSFC25R0001, issued by NASA Goddard Space Flight Center, extends the proposal due date to December 5, 2025, at 3:00 PM Eastern Standard Time. It also revises Section L, "Electronic Submission of Proposals – Proposal Marking and Delivery Through NASA’s EFSS Box. (NOV 2024)." The updated instructions detail the electronic submission process via NASA’s EFSS Box, emphasizing that proposals must be free of viruses, searchable, and without hidden formulas or password protection. Offerors are required to notify Kyle Vann and Raymond Jones of their intent to submit and are encouraged to coordinate test file submissions five days prior to the deadline. The amendment provides specific guidelines for file naming conventions, size limits, and contact information for submission issues. It stresses that offerors are responsible for timely and complete submissions, recommending submission at least 24 hours in advance.
This document addresses vendor questions and government replies regarding an RFP, likely for a NASA project related to a Line of Sight Magnetograph and a Vector Field Measurement study. Key updates include a revised proposal due date of December 5, 2025, and clarifications on mandatory
The document outlines the Statement of Work (SOW) for the PHOtospheric Magnetograph Imager (PHOMI) Phase A Study, a component of the National Oceanic and Atmospheric Administration (NOAA) Space Weather Geostationary (SW GEO) Series project. Led by NASA, the study aims to develop instrument concepts for photospheric magnetograph imagers capable of line-of-sight measurements of the solar photospheric magnetic field. The SOW details requirements for contractors during the Phase A study, including sensor design concepts, cost, schedule, and risk assessments to refine flight mission requirements. Key tasks involve trade studies, sensor design and analysis, technology assessment, and management planning, with specific deliverables and review milestones defined. The project seeks to enhance solar wind modeling by improving magnetic field mapping and potentially incorporating vector measurements.
The “Space Weather Geostationary (SW GEO) Series Project PHOtospheric Magnetograph Imager (PHOMI) Phase A Study Mission Assurance Requirements (MAR)” document outlines the comprehensive safety and mission assurance (SMA) requirements for the PHOMI instrument. It covers general SMA, quality management, system safety, reliability, software assurance, workmanship, EEE parts, materials and processes, contamination control, metrology and calibration, GIDEP alerts, and end item acceptance. The document details requirements for hazard analysis, critical item identification, reliability calculations, and strict adherence to NASA and industry standards, including specific deliverables for compliance. It also emphasizes the importance of independent oversight, surveillance, and clear communication with all suppliers to ensure mission success and safety.
The Space Weather Geostationary (SW GEO) Series project's PHOMI Requirements Specification outlines the performance, electrical, mechanical, environmental, and verification testing requirements for the PHOtospheric Magnetograph Imager (PHOMI). This document, released by NASA and NOAA, details the PHOMI's capabilities, including producing line-of-sight measurements of the photospheric magnetic field, photospheric Doppler velocity field imagery, and vector magnetograph imagery. Key aspects covered include spatial resolution, measurement ranges, data refresh rates, and resource allocations such as mass, power, and telemetry. The specification also addresses operational concepts, including pre-launch, launch, and on-orbit operations, along with various operating modes like Safe Mode and Normal Operational Mode. Environmental requirements, contamination control, design, construction, and mechanical design requirements are extensively detailed, ensuring the PHOMI's resilience and functionality in space. This comprehensive specification is crucial for the development and verification of a space-qualified PHOMI instrument.
This document outlines the Data Requirements Description (DRD) for government contracts, detailing the data deliverables required from contractors to the Government. It establishes guidelines for data preparation, maintenance, and delivery, prioritizing Federal Acquisition Regulation (FAR) and NASA FAR Supplement (NFS) clauses. The document categorizes DRDs into three types based on approval requirements: Type 1 requires written Contracting Officer (CO) approval, Type 2 allows NASA a time-limited right to disapprove, and Type 3 requires no NASA approval. It specifies electronic submission as preferred, with detailed formatting, transmittal, and document identification standards. Additionally, the document covers subcontractor data requirements, data restriction markings, document revisions, and procedures for CDRL/DRD maintenance. Two specific DRDs are detailed: DRD-001, the Organizational Conflict of Interest (OCI) Plan, which requires contractors to identify and resolve OCIs, and DRD-002, Security Requirements for Unclassified IT Resources, which focuses on IT security, training, and Cyber Supply Chain Risk Management (C-SCRM) for systems handling NASA information. Both DRDs outline submission frequencies, formats, applicable documents, and detailed content requirements.
This government file, titled "Draft Request for Proposal Government Responses to Questions," dated July 10, 2025, addresses various inquiries regarding the PHOtospheric Magnetograph Imager (PHOMI) project. Many of the responses indicate that specific details, such as page limits, funding profiles, firewall requirements, and detailed specifications for spatial resolution, measurement sensitivity, data availability, and instrument coordination, will be provided in the final Request for Proposal (RFP). Key information confirmed includes an approximate Not-To-Exceed (NTE) funding of $1.5M for a nine-month Phase A study and the requirement for firewalls between active SWFO/SOL teams and Phase A teams. The document also clarifies that updates regarding the number of instruments, proposal instructions, Phase A award details, flight contract funding, and various technical specifications will be included in the final RFP. The possibility of an L1 orbit for PHOMI is also noted as subject to updates in the final RFP.
This Request for Proposal (Solicitation 80GSFC25R0001) outlines a fixed-price contract for services and deliverables for the Goddard Space Flight Center (GSFC) over a nine-month period. Key deliverables include a Kick-off Meeting, Monthly Progress Reviews, Midterm Review, Final Study Review, Final Report Package, Reporting of Inventions, Technology Development and Risk Mitigation Report, Organizational Conflicts of Interest (OCI) Avoidance Plan, and an IT Security Management Plan. Payment is milestone-based, with specific percentages allocated to each event. The contractor is responsible for providing all necessary resources, adhering to various clauses concerning firm-fixed-price, supplies, services, payment schedules, inspection, performance, contract administration, and special requirements. Notable clauses address IT security, restrictions on funding activities with China, safeguarding contractor information systems, and Federal Acquisition Supply Chain Security Act (FASCSA) orders. The RFP also includes an option to extend the contract term and lists several attachments detailing the Statement of Work, Mission Assurance Requirements, and Data Requirements. Offerors must also comply with representations regarding telecommunications and video surveillance equipment.
NASA's Goddard Space Flight Center (GSFC) has issued Request for Proposal (RFP) No. 80GSFC25R0001, inviting proposals for a Space Weather Geostationary (SW GEO) PHOtospheric Magnetograph Imager (PHOMI) Phase A Study. This full and open competitive acquisition, with NAICS code 541330 ($25.5 million small business size standard), seeks a Firm-Fixed Price contract with a nine-month performance period. The anticipated contract award is November 2025. Potential offerors must note the potential for an organizational conflict of interest (OCI) and review the updated RFP, which includes significant changes from the Draft RFP. Offerors are also required to have a CAGE code matching their corporate address.
The document is a Standard Form 33, "Solicitation, Offer, and Award," used by government agencies for federal solicitations, specifically an RFP (Request for Proposal) identified as 80GSFC25R0003 from NASA Goddard Space Flight Center. It outlines the process for submitting offers for supplies or services, detailing sections like the schedule, contract clauses, and instructions to offerors. Key information includes the contract's rating under the Defense Priorities and Allocations System (DPAS), the deadline for offer submissions, and points of contact for information. It also covers terms for offer acceptance, prompt payment discounts, and acknowledgment of amendments. The form is structured into sections covering the solicitation, the offeror's response, and the government's award, including details on accounting, appropriation, and the contracting officer's information. This form serves as a comprehensive framework for both soliciting proposals and formalizing contract awards within the federal procurement system.
The Space Weather Geostationary (SW GEO) project initiated by NASA aims to develop the PHOtospheric Magnetograph Imager (PHOMI) as part of a Phase A study. This project focuses on designing an innovative sensor that can measure the photospheric magnetic field of the sun, which is crucial for understanding solar wind dynamics. The Statement of Work (SOW) outlines the responsibilities of contractors, including trade studies, sensor design concepts, technology assessments, risk management, and the production of various deliverables leading up to a System Requirements Review (SRR) and Preliminary Design Review (PDR). Key deliverables will include sensor performance evaluations, compliance assessments, risk identification, and cost estimates. The study aims to refine technical requirements for eventual satellite deployment while anticipating a variety of orbital scenarios. The document emphasizes a structured review process to ensure progress and compliance with NASA’s operational standards. By the end of Phase A, collaborations with industry partners will be sought to ensure preparedness for subsequent phases of the project, ultimately contributing to advancements in space weather monitoring.
The document outlines the Mission Assurance Requirements (MAR) for NASA's Space Weather Geostationary (SW GEO) Series Project, specifically addressing the PHOtospheric Magnetograph Imager (PHOMI). Effective from May 23, 2025, and expiring on May 23, 2030, it serves as a critical framework for ensuring the safety, quality, and reliability of flight hardware and associated systems throughout development and operational phases.
Key elements include the establishment of a comprehensive Systems Safety and Mission Assurance Program, management of project-level critical items, quality management procedures, system safety protocols, and software assurance requirements. Additionally, the document emphasizes the importance of risk management, proper documentation of non-conformances, and regular audits by NASA representatives.
Requirements are categorized under various safety and mission assurance disciplines, detailing compliance measures, inspection points, and reporting obligations. The significance of maintaining effective communication and oversight with suppliers and subcontractors is emphasized to ensure compliance with government standards.
As part of federal requirements, this MAR must guide developers in upholding safety and quality standards, which are essential for the successful execution of aerospace missions. The thoroughness of these requirements aligns with federal RFPs and ensures accountability and transparency in government contracting.
The Space Weather Geostationary (SW GEO) Series Project defines specifications for the PHOtospheric Magnetograph Imager (PHOMI), set to launch on May 22, 2025, effective until May 22, 2030. This document outlines performance and operational requirements for the PHOMI, which will measure the solar photospheric magnetic field critical for forecasting space weather phenomena, such as geomagnetic storms and Coronal Mass Ejections (CMEs). Key specifications include imagery resolution, measurement accuracy, operational power limits, and telemetry data rates.
With provisions for both pre-launch operations and on-orbit functions, the document ensures the PHOMI operates within specified parameters under various environmental conditions. It also establishes criteria for in-flight calibrations, power consumption, safety modes, and telemetry interfaces, ensuring the data produced is timely and reliable. This comprehensive framework illustrates the project’s commitment to utilizing advanced technology for improved monitoring of solar activity, which has implications for space weather forecasting and subsequent impacts on Earth's environment and technology.
Overall, the specification serves as a critical document in the context of government-funded space research, ensuring alignment with federal guidelines and operational efficiency while aiming to enhance Earth's understanding of solar dynamics.
The attachment outlines the Data Requirements Description (DRD) for NASA’s contract RFP #80GSFC25R0001, detailing the data deliverables required from contractors. It categorizes data into three types, with Type 1 requiring written approval from the Contracting Officer, Type 2 allowing for NASA disapproval, and Type 3 without needing prior approval. The document emphasizes the contractor’s responsibility to flow down specific data requirements to subcontractors and includes detailed instructions on submission formats, transmittal methods, and document identification. Notably, it includes two DRDs: an Organizational Conflict of Interest (OCI) Plan, articulating methods for identifying and managing OCIs, and Security Requirements for Unclassified IT Resources, focusing on IT security protocols tied to NASA's cybersecurity standards. Each DRD specifies submission timelines, formats, interrelationships with applicable regulations, and maintenance requirements. The contractor must maintain compliance by revising plans as necessary and may be subject to further approvals based on changing contract needs. This document serves to ensure systematic data management and compliance within NASA's operational guidelines, fostering transparency and security throughout the contract's duration.
The Draft Request for Proposal (RFP) Solicitation 80GSFC25R0001 outlines a procurement process for services and deliverables required from contractors by the government. The document specifies that the total contract price will be proposed, with various services including kick-off meetings, monthly progress reviews, and final reports mandated as outlined in the Statement of Work (SOW) in Attachment A. It details payment schedules for milestones throughout the contract period, which spans nine months after the effective date. Contractors must adhere to inspection, performance, and security clauses, particularly regarding IT resources and organizational conflict of interest avoidance.
Additionally, the proposal emphasizes compliance with federal acquisition laws, especially regarding telecommunications services and export regulations. It requires contractors to maintain vibrant records for inspections and ensure stringent safeguarding measures are in place to protect government information. This RFP serves as a formal solicitation for contractors to submit responses adhering to specific government requirements and conditions aimed at facilitating effective procurement for technical services related to NASA's ongoing projects.
The NASA Goddard Space Flight Center has released a Draft Request for Proposal (DRFP) for the Space Weather Geostationary (SW GEO) PHOtospheric Magnetograph Imager (PHOMI) Phase A Study. The primary objective is to explore instrument concepts for magnetograph imagers that will provide line of sight measurements of the solar photospheric magnetic field. This information is essential for forecasting solar wind conditions. NASA aims for a competitive acquisition resulting in a Firm-Fixed-Price contract lasting nine months, with an anticipated RFP release in late July 2025 and a contract award in September 2025. Offerors are invited to comment on the DRFP, which includes insights on requirements, schedules, and potential risks, including organizational conflicts of interest. All proposals must be submitted through NASA’s secure EFSS Box platform. The DRFP does not constitute an official solicitation; it is designed to collect feedback to refine the final RFP. Companies interested in participating must register in relevant government databases and monitor updates online. Comments should be submitted within 14 days of the DRFP release, and confidentiality for sensitive information is noted. This initiative emphasizes NASA's commitment to advancing solar observation capabilities while fostering competitive procurement practices.
The document is a government solicitation for contract bids under the Defense Priorities and Allocations System (DPAS), governing the procurement of supplies or services. It outlines the submission process for offers, including the necessary compliance with terms and conditions, and provides a structured format for bidders to present their proposals. Key sections include detailed instructions, contact information for the contracting officer, requirements for amendments acknowledgment, and stipulations for prompt payment discounts. The offeror must fill out specific sections, agreeing to supply the items and adhere to delivery timelines. Additionally, the contract is managed by the NASA Goddard Space Flight Center’s Institutional Procurement Office, with the document being notably formatted for clarity and adherence to government standards. This solicitation is part of the broader scope of federal and state procurements, encouraging competitive bidding to ensure effective use of government resources.
The Space Weather Geostationary (SW GEO) Series Project's PHOtospheric Magnetograph Imager (PHOMI) Phase A Study Statement of Work (SOW) outlines requirements for developing an instrument concept. This SOW, effective September 4, 2025, details tasks including trade studies, sensor design, technology assessment, and management planning. NASA and NOAA seek instrument concepts for photospheric magnetograph imagers capable of line-of-sight measurements of the solar photospheric magnetic field, with interest in extending capabilities to vector measurements. The study aims to refine requirements for the eventual flight mission, with deliverables covering various technical and programmatic aspects, and a proposed pre-priced option for further development towards PDR level readiness.
This government file addresses vendor questions and government replies concerning a NASA Request for Proposal (RFP) for the PHOMI project. Key clarifications include the proposal due date (October 12, 2025), the mandatory nature of submitting a "Technology Development and Risk Mitigation Effort," and confirmation that PHOMI teams do not need to be firewalled from SWFO or SOLAR teams. The document also corrects several typos and errors within the Statement of Work (SOW) and RFP clauses, particularly regarding CDRL references, magnetic requirements, and the scope of the magnetograph capabilities (Line of Sight versus Vector Field Measurement). Several amendments to the RFP and SOW are planned to address these identified issues, ensuring clarity and accuracy for offerors.
Amendment 2 for Solicitation 80GSFC25R0001, issued by NASA Goddard Space Flight Center, significantly revises the original Request for Proposal. Key changes include the deletion and replacement of Attachment A, Statement of Work, with a revised version dated September 30, 2025. The proposal due date is indefinitely extended due to a government shutdown, with a new amendment to be issued once the shutdown ends. The amendment also revises the "Contractor Proposed Technology Development and Risk Mitigation Efforts" provision in Section H and updates clause GSFC 52.211-101, List of Attachments, in Section J. Furthermore, Section L, "Electronic Submission of Proposals – Proposal Marking and Delivery Through NASA’s EFSS Box," is revised to provide updated instructions for proposal submission via NASA's EFSS Box, including contact information for assistance and guidelines for file naming and submission timing.