STTRPre-Release

Optimized Vertical Axis Wind Turbine for Remote Power Generation

Solicitation ID25.D
Agency
DOD
OSD
Deadline
Jun 25, 2025
Closed
Posted Date
May 7, 2025
Classification
STTR
Phase: BOTH

STTR Opportunity Analysis

The Department of Defense (DoD) is seeking proposals for the development of an Optimized Vertical Axis Wind Turbine (VAWT) aimed at enhancing power generation capabilities in remote locations lacking grid access. The objective is to design a VAWT that overcomes the limitations of existing models, particularly in terms of power output, by utilizing advanced machine learning (ML) optimization methods and fluid-structure interaction simulations. This initiative is significant for military applications, as it promises a lightweight, portable, and easy-to-install power generation solution that can operate effectively in various environmental conditions. Phase I proposals are invited with a funding limit of $180,000 for a six-month performance period, while Phase II will provide up to $1.8 million for prototype development and testing. Interested parties should prepare to submit their proposals by June 25, 2025, following the solicitation's opening on May 28, 2025. For more details, visit the DoD SBIR/STTR website at https://www.dodsbirsttr.mil/topics-app/.

SBIR Documents

1 Files
PDF.html
HTML23 KBMay 10, 2025
AI Summary
No AI summary available for this file.

Related SBIR/STTR Opportunities

Opportunity Snapshot

Source SystemOfficial Link
Program Type
STTR - BOTH
Agency
DOD / OSD

Key Dates

Release DateMay 7, 2025
Open DateMay 28, 2025
Application DueJun 25, 2025
Close DateJun 25, 2025