ContractSolicitationSDVOSB Sole Source

OHARNG FY25 CJAG Paving

DEPT OF DEFENSE W91364-25-B-A007
Response Deadline
Aug 13, 2025
Deadline passed
Days Remaining
0
Closed
Set-Aside
SDVOSB Sole Source
Notice Type
Solicitation

Contract Opportunity Analysis

The Department of Defense, through the Ohio Army National Guard, is soliciting bids for the FY25 CJAG Paving Project at Camp James A. Garfield Joint Military Training Center in Ravenna, Ohio. The project entails a firm fixed-price contract for comprehensive asphalt paving and repair services, including pothole repairs, chip sealing, and full and partial depth pavement repairs across various roads and parking lots, with additional options for culvert replacements and other enhancements. This solicitation is exclusively set aside for Service-Disabled Veteran Owned Small Businesses (SDVOSB), with a total estimated project value of $1,231,679.00, and bids must be submitted by August 13, 2025, following a mandatory pre-bid conference on July 24, 2025. Interested contractors can direct inquiries to Claudia Tenaglia at claudia.j.tenaglia.civ@army.mil or Herbert L. Brown at herbert.l.brown24.mil@army.mil.

Classification Codes

NAICS Code
237310
Highway, Street, and Bridge Construction
PSC Code
Y1LB
CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS

Solicitation Documents

17 Files
Instructions to Bidders.docx
Word48 KB7/12/2025
AI Summary
The Ohio Army National Guard is soliciting bids for the FY25 CJAG Paving Project, under Solicitation #W91364-25-B-A007. The project aims to award a firm fixed-price contract to a service-disabled veteran-owned small business for asphalt paving at Camp James A. Garfield. Key tasks include pothole repair, chip sealing, and full and partial pavement repairs on several roads totaling approximately 66,000 feet in length, as well as related work on parking lots. An invitation to a pre-bid conference is scheduled for July 24, 2025, where bidders can gain insight into project details and submit inquiries. Bids are due on August 13, 2025, at a designated site, and must be hand-carried due to security restrictions at the military base. Details on requirements for attendance, bid submission, and wage rates are included. The RFP emphasizes adherence to FAR regulations and promotes a fair selection process based on price and bidder qualifications, while also specifying that the government is not liable for pre-contract costs. Overall, this RFP illustrates the government's commitment to improving military infrastructure while fostering opportunities for veteran-owned businesses, adhering to stipulated guidelines and regulations during the bidding process.
STATEMENT OF WORK.docx
Word267 KB7/12/2025
AI Summary
The Camp James A. Garfield (CJAG) Joint Military Training Center has issued a Request for Proposal (RFP) for the 2025 Paving Repairs project, designated as Project No. 3924006. This initiative entails comprehensive asphalt paving and maintenance across specified roads and parking areas within the center, covering approximately 21,683 acres in Ravenna, Ohio. The primary components of the work include pothole repairs, chip sealing, partial and full-depth pavement repairs, crack sealing, and culvert replacement, all conforming to the Ohio Department of Transportation's specifications. The project will operate under a Firm Fixed Price contract, with a completion timeline of 365 days following the Notice to Proceed. The contractor is responsible for supplying all necessary materials, labor, and equipment, as well as adhering to strict environmental guidelines and safety protocols throughout the construction process. A mandatory site visit is required for all bidders. Key areas for repair include Newton Falls Road and various primary roads affected by potholes and road deterioration. The RFP emphasizes adherence to safety standards and includes provisions for the disposal of construction waste and unlawful material handling, reflecting the importance of compliance in governmental contracts.
CJAG 2025 Overall Site Plan.pdf
PDF220 KB7/12/2025
AI Summary
This document outlines various road maintenance and repair projects associated with federal and state road systems. It includes specific options for road improvements such as culvert replacements, pothole repairs, surface treatments, and full-depth pavement repairs across numerous roads including Newton Falls Road, Smalley Road, and Paris Windham Road. Notable job tasks include chip sealing, interim leveling, and stone resurfacings, indicated for different road segments. Moreover, the document specifies base bid projects and options for additional enhancements, such as crack sealing in parking lots, contributing to overall asset management and infrastructure integrity. The mention of proposed locations, such as the main gate entrances in Ravenna and Newton Falls, suggests the projects’ relevance to public access routes. The context suggests a systematic approach to road maintenance, critical for safety and operational efficiency, in light of government RFPs aimed at eliciting contractor participation for these essential infrastructure tasks. This indicates a structured procurement process to address road conditions effectively and maintain necessary service levels on public thoroughfares.
Solicitation - W9136425BA007.pdf
PDF5865 KB7/12/2025
AI Summary
The document outlines the solicitation for a Firm Fixed Price contract by the Ohio National Guard for the FY25 Camp James A. Garfield Paving Project, located at Camp James A. Garfield Joint Military Training Center in Ravenna, Ohio. The scope of work includes repaving and repairing existing roads, specifically pothole repairs, chip sealing, and various depth repairs across multiple road segments, with options for additional repair locations depending on available funding. The solicitation emphasizes that bids are encouraged from Service-Disabled Veteran Owned Small Businesses and will be evaluated primarily on price. A pre-bid conference is scheduled for July 16, 2025, for bidding companies to clarify requirements. The document also includes critical details on submission processes, required documentation, and bidding regulations, ensuring compliance with government procurement standards. It reinforces that bidders must submit their proposals following strict guidelines, including providing performance and payment bonds and following wage determination regulations. Overall, the solicitation emphasizes transparency, accessibility, and the commitment to utilizing veteran-owned businesses for contributing to community infrastructure improvement.
Wage Determinations DBA Ohio Statewide 27JUNE2025.docx
Word101 KB7/12/2025
AI Summary
The document outlines the General Decision Number OH20250001, applicable to heavy and highway construction projects in Ohio, effective from June 27, 2025. It details the minimum wage requirements under the Davis-Bacon Act and relevant Executive Orders, highlighting that contracts initiated after January 30, 2022, must pay workers at least $17.75 per hour, while those awarded between January 1, 2015, and January 29, 2022, must pay at least $13.30 per hour. The wage determination includes various classifications with corresponding rates and fringe benefits for construction laborers—including bricklayers, electricians, carpenters, and operators—across different counties in Ohio. Key wage rates and categories are listed, alongside specific conditions including worker protections and annual rate adjustments per the Executive Orders. The file underscores the importance of compliance with federal regulations and proper classification of workers based on the type of construction work performed, emphasizing the federal government's commitment to fair labor standards in public contracting.
CJAG 2025 Paving Maps.docx
Word16235 KB7/12/2025
AI Summary
The government file PN 3924006 outlines paving repair projects scheduled for 2025 under the CJAG initiative. It includes detailed site plans for various tasks designated as Base Bid and Options. The project aims to enhance road conditions through several key tasks: - **Base Bid, Task A** includes chip sealing along Newton Falls Road from the Rt 80 turnpad to Road 1B. - **Base Bid, Task C** involves full-depth repairs on Smalley Road and partial-depth repairs on Paris Windham Road, specifically at culvert crossings. - **Options** provide additional repair scenarios, including box culvert repairs on Newton Falls Road, various parking lot repairs, and culvert replacements on Ramsdell Road. This document serves the purpose of providing prospective contractors with necessary information for bidding on road improvement projects, detailing the scope and specific areas of work required. The structure categorizes tasks and options clearly, allowing for efficient assessment and response to the RFP. The overview emphasizes the government's commitment to infrastructure improvement through systematic roadway maintenance and repair.
RFI-Form.pdf
PDF69 KB9/3/2025
AI Summary
This document is a Request for Information (RFI) template within a government contracting context, providing a structured format for contractors to submit queries regarding project details. It outlines essential elements such as contract and project numbers, information requested, date submissions, and response tracking. The purpose of the RFI system is to facilitate communication regarding contractors' inquiries on specific issues, emphasizing that responses do not authorize any work to proceed without proper risk assessment. The document cautions contractors that if they perceive a response as a change in contract conditions, they must follow specified FAR regulations to formally submit a change proposal. This structure reflects the procedural and regulatory framework governing federal contracts, aiming to ensure clarity and compliance during contractor engagements.
Environmental Procedures.pdf
PDF1025 KB9/3/2025
AI Summary
The Ohio Army National Guard (OHARNG) has issued comprehensive Environmental Procedures dated April 3, 2024, outlining environmental compliance requirements for all OHARNG projects, including maintenance, renovation, and construction. These procedures ensure adherence to federal, state, and local environmental regulations, covering areas such as spill response, storm water management, waste disposal, and protection of natural and cultural resources. Contractors are mandated to develop detailed Environmental Work Plans, obtain necessary permits, and coordinate all communications with regulatory agencies through the OHARNG. Key sections address emergency spill response, erosion control, sanitary sewer management, waste and hazardous waste handling (including asbestos and lead), earth fill, protection of threatened and endangered species, cultural/historic resources, pesticide use, munitions construction support, and dust control. The document emphasizes environmental stewardship, pollution prevention, and sustainable practices, with specific guidelines for various activities and detailed requirements for reporting and documentation.
Site Visit Sign-in Sheet.pdf
PDF556 KB9/3/2025
AI Summary
No AI summary available for this file.
Solicitation - W9136425BA007.pdf
PDF5865 KB9/3/2025
AI Summary
The Ohio National Guard is seeking bids for the FY25 CJAG Paving Project, a firm fixed-price contract to repave and repair existing roads and parking lots at Camp James A. Garfield Joint Military Training Center (CJAG) in Ravenna, OH. The project includes base bid work on Newton Falls Road, Primary Roads, Smalley Road, and Paris Windham Road, involving pothole repair, chip seal, full and partial depth repairs, leveling, and striping. Six additional optional locations are also outlined. The solicitation is 100% set aside for Service-Disabled Veteran Owned Small Businesses, with award based on price and price-related factors. A pre-bid conference and site visit are scheduled for July 16, 2025, with mandatory registration for access. All inquiries must be submitted in writing by August 7, 2025. Bids must be hand-carried to Building 1068 at CJAG by August 13, 2025, and email or fax submissions will not be accepted. The contract requires a bid guarantee of 20% of the bid price or $3,000,000, whichever is less, and adherence to specific subcontracting limitations (85% for general construction) for similarly situated entities.
Wage Determinations DBA Ohio Statewide 27JUNE2025.docx
Word101 KB9/3/2025
AI Summary
This government file, titled "General Decision Number: OH20250001 06/27/2025," outlines prevailing wage rates for Heavy and Highway Construction Projects across Ohio. It details the applicability of Executive Orders 14026 and 13658, specifying minimum wage requirements for contracts entered into or extended on or after January 30, 2022 ($17.75/hour), and those awarded between January 1, 2015, and January 29, 2022 ($13.30/hour). The document emphasizes that these rates are subject to annual adjustments and that conformance requests are necessary for unlisted classifications. It provides a comprehensive list of wage rates and fringe benefits for various construction trades, including Bricklayers, Carpenters, Electricians, Power Equipment Operators, Ironworkers, and Laborers, broken down by specific counties and regions within Ohio. The file serves as a critical reference for contractors and workers involved in federally funded or assisted construction projects in Ohio, ensuring compliance with prevailing wage laws.
Bid Abstract Cont Sheet.pdf
PDF758 KB9/3/2025
AI Summary
The document, an "Abstract of Offers - Construction Continuation Sheet," details bids for the "DY25 CJAG Paving Project No. 3924006." It serves as an extension to OF 1419, used when more than two offers are received for a construction project. The form lists solicitations, project titles, and offers from various contractors, including Beckwith Services and GFM Partners. Each offer specifies bid security (e.g., Bid Bond 20%) and acknowledges amendments (or notes none). The sheet breaks down contract items by item number, estimated quantity, unit, unit price, and estimated amount. This document streamlines the tracking and comparison of multiple bids for federal construction projects, ensuring transparency and comprehensive record-keeping.
Bid Abstract 1419.pdf
PDF520 KB9/3/2025
AI Summary
This document is an Abstract of Offers for a construction project titled 'FY25 Camp James A. Garfield JMTC Paving Project# 3924006' issued by USPFO - Ohio. The solicitation number is W91364-25-B-A0007. The abstract details nine items, including base bids for Newton Falls Rd., Primary Roads Pothole Repair, and Smalley Rd. and P. Windham Rd., along with six optional bids for various paving and road improvements. Two offers were received from Hovis Construction and MRP Contracting, both providing a 20% Bid Bond and acknowledging no amendments. The government's estimate for the project is $1,231,679.00. Hovis Construction's total bid is $880,923.39, while MRP Contracting's total bid is $1,111,000.00. The document was certified by Herbert L. Brown, Contract Officer, on August 19, 2025, with the date issued being July 11, 2025, and opened on August 13, 2025.
CJAG 2025 Overall Site Plan.pdf
PDF220 KB9/3/2025
AI Summary
The document outlines the "CJAG 2025 Paving Repairs" project, detailing extensive road and track maintenance, and upgrades. It includes specific base bids and options for various locations, such as Newton Falls Road, Smalley Road, Paris Windham Road, and primary roads. Key repairs encompass pothole repairs, chip sealing, culvert replacements, full-depth and partial-depth pavement repairs, stone resurfacing, crack sealing, milling and filling, and grade adjustments. The project also lists numerous roads and tracks with their corresponding identifiers, indicating a comprehensive infrastructure improvement initiative. The document specifies two main gate entrances, providing their addresses.
CJAG 2025 Paving Maps.docx
Word16235 KB9/3/2025
AI Summary
The document, "PN 3924006 – CJAG 2025 Paving Repairs Attachment 3 – Site Plans," outlines various paving repair tasks and options for the CJAG 2025 project. The base bid includes "TASK A: Newton Falls Rd Chip Seal," focusing on the section from the Rt 80 turnpad to Road 1B. "TASK C" encompasses "Smalley Rd Full Depth Repairs" and "Paris Windham Rd Partial Depth Repairs," with the latter addressing areas to level culvert crossings. Several options are detailed: "OPTION 1: Newton Falls Road" involves repairing box culvert approaches, culvert replacement, and full-depth repair. "OPTION 2" covers repairs at the "Bldg 1067 Parking Lot" and "Post/DPW Parking Lot." "OPTION 3: Smalley Road" includes leveling culvert crossings, grade adjustment, and full-depth repair from Paris Windham Rd to County Line Rd. "OPTION 4: Butts-Kistler Road" specifies work from South Service to the Perimeter Fence. "OPTION 5: Ramsdell Road" involves culvert replacement and extends from Snow Rd turnpad to Irons Rd turnpad. Finally, "OPTION 6" is designated for the "225 Gate." This document serves as a site plan guide for the comprehensive paving repair project.
STATEMENT OF WORK.docx
Word267 KB9/3/2025
AI Summary
The Camp James A. Garfield Joint Military Training Center (CJAG) is seeking bids for its CJAG 2025 Paving Repairs project (Project No: 3924006), a firm fixed-price contract with a 365-day performance period. The project involves asphalt paving, maintenance, and repair of roads and parking lots, adhering to Ohio Department of Transportation and United Facilities Criteria specifications. Key tasks include pothole repair, chip sealing, partial and full-depth pavement repair, crack sealing, and culvert replacement. The scope covers specific roads like Newton Falls Road, Smalley Road, and Paris Windham Road, with options for additional work on other roads and parking lots. Contractors must conduct a mandatory site visit, adhere to environmental and safety regulations, and comply with strict work scheduling and disposal requirements. Personnel must complete AT Level I and OPSEC awareness training. The RFP emphasizes contractor responsibility for site conditions, material quality, and adherence to all applicable federal, state, and local regulations.
Instructions to Bidders.docx
Word48 KB9/3/2025
AI Summary
The Ohio Army National Guard is seeking bids for the FY25 CJAG Paving Project (Solicitation# W91364-25-B-A007) to award a firm fixed-price contract for asphalt paving and repairs at Camp James A. Garfield Joint Military Training Center. The project includes extensive pothole repair, chip seal, full and partial depth pavement repairs, leveling depressions, and striping on various roads and parking lots. Additionally, six options cover culvert replacements, crack sealing, stone resurfacing, and full-depth pavement repairs at other locations. This solicitation is 100% set-aside for Service-Disabled Veteran Owned Small Businesses (SDVOSB), with award based solely on price. A mandatory pre-bid conference and site visit will be held on July 24, 2025, requiring advance registration due to security. All questions must be submitted via email by August 5, 2025, and bids are due by August 13, 2025, at 11:00 AM EST, to be hand-delivered to Building 1068 at the training center. No email, fax, or mailed bids will be accepted. Technical and engineering data are available on SAM.gov, requiring explicit access.

Related Contract Opportunities

Project Timeline

postedOriginal Solicitation PostedJul 11, 2025
amendedAmendment #1Jul 12, 2025
amendedAmendment #2· Description UpdatedAug 8, 2025
amendedAmendment #3Aug 8, 2025
amendedLatest AmendmentSep 3, 2025
deadlineResponse DeadlineAug 13, 2025
expiryArchive DateAug 28, 2025

Agency Information

Department
DEPT OF DEFENSE
Sub-Tier
DEPT OF THE ARMY
Office
W7NU USPFO ACTIVITY OH ARNG

Point of Contact

Name
Claudia Tenaglia

Place of Performance

Ohio, UNITED STATES

Official Sources