Contract Opportunity Analysis

The Department of Agriculture, specifically the Forest Service at the Willamette National Forest, is seeking qualified small businesses to provide road maintenance services for the Pyramid Fire Suppression project in Sweet Home, Oregon. The procurement involves a Firm-Fixed-Price contract for maintaining approximately 54.5 miles of road, including tasks such as surface maintenance, spot surfacing, water-bar installation, and cleaning of ditches and culverts, with a focus on restoring and ensuring the integrity of forest roads impacted by fire suppression efforts. This project is crucial for maintaining safe and accessible roadways within the National Forest System, supporting both environmental management and public safety. Interested contractors must submit their proposals by September 10, 2025, to Jared Machgan at jared.machgan@usda.gov, and are encouraged to review the solicitation documents for detailed requirements and specifications.

Classification Codes

NAICS Code
237310
Highway, Street, and Bridge Construction
PSC Code
F018
NATURAL RESOURCES/CONSERVATION- OTHER FOREST/RANGE IMPROVEMENTS (NON-CONSTRUCTION)

Solicitation Documents

8 Files
Area Maps.pdf
PDF8298 KB9/3/2025
AI Summary
This government file, likely an RFP or grant-related document, outlines two primary areas of focus: "PYRAMID FIRE SUPPRESSION INSERT" and "ROADS LISTED FOR REPAIR." The inclusion of "SEE PYRAMID FIRE SUPPRESSION INSERT" suggests a detailed attachment or section dedicated to fire suppression systems, likely pertaining to specifications, requirements, or a specific project related to fire safety infrastructure. The second key item, "ROADS LISTED FOR REPAIR," indicates a separate project or initiative focused on the maintenance and repair of roads. This structure suggests the document covers distinct infrastructure needs, potentially for a federal, state, or local government entity seeking bids or proposals for these two areas.
wage rate.pdf
PDF4995 KB8/22/2025
AI Summary
No AI summary available for this file.
Schedule of items and Performance Work Statement.pdf
PDF2695 KB9/3/2025
AI Summary
This federal Request for Proposal (RFP) from the USDA Forest Service, Willamette National Forest, solicits bids for the "PYRAMID FIRE ROAD MAINTENANCE-SUPPRESSION REPAIR" project (Solicitation Number 1240BE25Q0073). The contract, running from September 15, 2025, to August 31, 2026, requires a contractor to provide all labor, supervision, equipment, and transportation for road maintenance activities within the Sweet Home Range District. Key tasks include surface maintenance (Levels 2, 3, & 4) with roller compaction, spot surfacing (Gradation F), loading, hauling, and placing materials, water-bar installation, and cleaning/reconditioning culverts and ditches. The RFP details performance standards, measurement methods (e.g., DH=Mile, CY=Cubic Yard, EA=Each, LS=Lump Sum), and acceptable quality levels with defined major and minor defects and required actions for each service item. A significant emphasis is placed on weed-free equipment and materials, with inspection requirements. Mobilization is also a listed item. The project aims to restore and maintain forest roads, ensuring proper drainage and safe passage, with strict adherence to environmental and safety protocols.
1240BE25Q0073 amendment 0001.pdf
PDF228 KB9/3/2025
AI Summary
This amendment, 1240BE25Q0073-0001, modifies a solicitation issued by USDA-FS CSA Northwest 1, located in Portland, OR. The effective date of this amendment is August 11, 2025. Key changes include an update to the wage rates, specifically changing from Lane County to Linn County, and a revised period of performance from September 15, 2025, to August 31, 2026. Offerors must acknowledge receipt of this amendment by the specified hour and date, either by completing and returning copies of the amendment, acknowledging it on their submitted offer, or by separate communication referencing the solicitation and amendment numbers. Failure to acknowledge may result in the rejection of offers. The amendment also specifies that all other terms and conditions of the original document remain unchanged.
Linn County Wage Rates.pdf
PDF4986 KB9/3/2025
AI Summary
No AI summary available for this file.
Supplemental Specifications Worklist.pdf
PDF285 KB8/29/2025
AI Summary
The Willamette National Forest's 'Worklist for Pyramid Fire Suppression Repair - Road Maintenance' outlines a comprehensive road maintenance project. The project includes grading work, surface maintenance for Level 2 and Level 3 roads with roller compaction, spot surfacing, cleaning of ditches and culverts, and water-bar installations. Specific tasks involve implementing temporary traffic control, material disposal, grading according to specifications 811(2) or (3), and applying water during grading. The project details numerous locations along various NFSR routes, specifying the beginning and end points, and the types of work to be performed at each. The document emphasizes adherence to specifications like 834(1) and 834(3) for ditch and culvert cleaning, and 813(1) for spot surfacing. The work aims to maintain and repair forest roads, ensuring proper drainage and road integrity after fire suppression activities.
1240BE25Q0073 amendment 0002.pdf
PDF1122 KB9/3/2025
AI Summary
Amendment 0002 to Solicitation 1240BE25Q0073, issued by USDA-FS CSA Northwest, extends the offer receipt deadline to September 10, 2025. This amendment clarifies several contractor questions regarding the Pyramid Fire Suppression Repair—Road Maintenance project, which involves surface maintenance, spot surfacing, and cleaning of ditches and culverts on various National Forest System Roads (NFSRs) within the Willamette National Forest. Key clarifications include the commercial sourcing of aggregate, the distinction between spot gradation and load/haul items, the designation of on-site disposal areas, and confirmation that no additional project requirements exist beyond the solicitation documents. The amendment also specifies roadway widths for surface maintenance, clarifies material delivery for spot surfacing, explains the scope of 'Load, Haul, and Place Materials' for waste, confirms culvert cleaning is measured by mile, and details that most ditches require full-length cleaning. It provides the gradation specifications for 'Gradation F' aggregate and corrects a typo in the supplemental specifications regarding 'Spot Surfacing Grading F.' Additionally, it clarifies that 'Water-bar Installation' refers only to water-bars and not water dips.
Supplemental Specifications Worklist UPDATED.pdf
PDF318 KB9/3/2025
AI Summary
The "Worklist for Pyramid Fire Suppression Repair - Road Maintenance" outlines extensive road maintenance tasks for the Willamette National Forest, detailing specific work on numerous National Forest System Roads (NFSRs). The project involves surface maintenance, spot surfacing with graded aggregate, temporary traffic control, material disposal, grading, watering, compaction, and cleaning of ditches and culverts. Additionally, some sections require water-bar installation. The work is organized by NFSR number, specifying begin and end mileposts for each task, along with quantities for items like surface maintenance (Level 2 and 3 roads), spot surfacing, material hauling, and mobilization. The document emphasizes adherence to specifications 811(2), 811(3), 834(1), and 834(3), and specifies the use of ODOT 1 1/2" - 0 Dense Graded Aggregate for spot surfacing, acquired from commercial sources and approved by the Contracting Officer Representative. This comprehensive worklist ensures the repair and maintenance of roads damaged by fire suppression efforts, enhancing road integrity and safety within the forest.

Related Contract Opportunities

Project Timeline

postedOriginal Solicitation PostedAug 8, 2025
amendedAmendment #1· Description UpdatedAug 22, 2025
amendedAmendment #2Aug 26, 2025
amendedAmendment #3Aug 29, 2025
amendedLatest AmendmentSep 3, 2025
deadlineResponse DeadlineSep 11, 2025
expiryArchive DateSep 25, 2025

Agency Information

Department
DEPARTMENT OF AGRICULTURE
Sub-Tier
FOREST SERVICE
Office
WILLAMETTE NATIONAL FOREST

Point of Contact

Name
Jared Machgan

Place of Performance

Sweet Home, Oregon, UNITED STATES

Official Sources