ContractPresolicitationWomen-Owned Small Business

Notice of intent to solicit directly from suppliers (W9127N26QA035)

DEPT OF DEFENSE W9127N26QA035
Response Deadline
Feb 13, 2026
Deadline passed
Days Remaining
0
Closed
Set-Aside
Women-Owned Small Business
Notice Type
Presolicitation

Contract Opportunity Analysis

The Department of the Army, specifically the U.S. Army Corps of Engineers, intends to solicit a firm-fixed-price supply contract for custom-built guardrail assemblies at the Green Peter Powerhouse in Lowell, Oregon. This procurement is set aside exclusively for Women-Owned Small Businesses (WOSB) and aims to upgrade the existing roof guard rail system to meet Department of Defense and OSHA fall protection regulations. The project involves the fabrication of various guardrail components, including panels and mounting brackets, with an estimated cost of $32,000 for the materials. Interested suppliers must submit a capability statement by 11:00 AM PST on February 13, 2026, to demonstrate their ability to meet the government's requirements, with all inquiries directed to Raymie Briddell at raymie.l.briddell@usace.army.mil.

Classification Codes

NAICS Code
332999
All Other Miscellaneous Fabricated Metal Product Manufacturing
PSC Code
5650
ROOFING AND SIDING MATERIALS

Solicitation Documents

2 Files
Purchase Description for GPR Roof handrail .pdf
PDF189 KBFeb 3, 2026
AI Summary
The Green Peter Powerhouse in Linn County, Oregon, requires a materials upgrade for its roof guard rail system to comply with DoD and OSHA fall protection regulations. The existing parapet wall on the flat roof is insufficient for safety. The project involves building custom 2-inch Schedule 40 pipe guardrail assemblies, including 18 Panel 1 assemblies, 20 Panel 2 assemblies, 2 West Corner Rail assemblies, 2 East Corner Rail assemblies, and 84 mounting bracket assemblies. All components will be hot-dip galvanized after assembly, as detailed in drawing GPP-9-3-11/2 and CU-16-0025-3-2_REV-1. The estimated cost for these materials is $32,000. Shipping of the guard rails and mounting brackets is to 40386 West Boundary Rd., Lowell, OR 97452, with deliveries accepted Monday through Thursday, 0800-1600, excluding holidays. The government will not cover shipping costs to Lookout Point Dam.
CU-16-0025-3-2_REV-1PowerhouseRoofGuardRailDetails (1).pdf
PDF399 KBFeb 3, 2026
AI Summary
This government file details the specifications for guardrail assemblies, including corner guardrails, guardrail panels, and individual pipe and bracket components, specifically for the Powerhouse Roof at Green Peter Dam & Reservoir. The document outlines material requirements, such as 2-inch Schedule 40 steel pipe for all pipe components, and detailed galvanizing specifications. Key galvanizing requirements include hot-dip galvanizing after assembly, specific vent hole drilling (3/8-inch for top rails and at weld points, or 25% of the pipe's internal diameter), and ensuring all steel parts are free of contaminants before the process. The file provides various scaled diagrams and notes for construction and assembly, emphasizing proper ventilation for optimal galvanizing quality and cost-effectiveness. This document serves as a comprehensive guide for the fabrication and installation of the specified guardrail systems.

Related Contract Opportunities

Project Timeline

postedOriginal Solicitation PostedFeb 3, 2026
deadlineResponse DeadlineFeb 13, 2026
expiryArchive DateFeb 28, 2026

Agency Information

Department
DEPT OF DEFENSE
Sub-Tier
DEPT OF THE ARMY
Office
W071 ENDIST PORTLAND

Point of Contact

Name
Raymie Briddell

Place of Performance

Lowell, Oregon, UNITED STATES

Official Sources