The Department of Defense, specifically the Department of the Army, is soliciting offers for the procurement of an Automatic Aqueous Parts Washer, specifically a STINGRAY 4063 model or an equivalent, to be installed at the Red River Army Depot in Texarkana, Texas. The contractor will be responsible for the design, fabrication, installation, testing, and commissioning of the parts washer, which must meet specific technical requirements including power, heat source, pump horsepower, flow rate, pressure, temperature range, and reservoir capacity. This equipment is crucial for maintaining operational efficiency in military maintenance operations, and the selected contractor must ensure the system is fully operational within 12 months of contract award, including providing training and necessary documentation. Interested parties should contact Aeric Miller at Aeric.p.miller.civ@army.mil or Travis Peterson at travis.n.peterson2.civ@army.mil, with proposals due by March 2, 2026, as this opportunity is set aside for small businesses under NAICS code 333310.

Classification Codes

NAICS Code
333310
Commercial and Service Industry Machinery Manufacturing
PSC Code
4940
MISCELLANEOUS MAINTENANCE AND REPAIR SHOP SPECIALIZED EQUIPMENT

Solicitation Documents

5 Files
CDRL A0005 Manuals Parts Washer.pdf
PDF205 KBFeb 23, 2026
AI Summary
This government file is a Contract Data Requirements List (CDRL) for an "Automatic Aqueous Parts Washer" system, detailing the requirements for manuals. The contractor must provide three hard copies and one electronic copy (on CD/DVD) of operational sequences, system programs, Bills of Materials (BOM), wiring diagrams/schematics, and maintenance manuals, including calibration information. These manuals are required once after training completion. The requiring office is RRAD, Contracting, and the Point of Contact (POC) for review is Brandon Pope, Production Engineering Division. The manuals will be reviewed within seven working days for necessary changes and are for administrative and operational use only.
CDRL A0004 Training Parts Washer.pdf
PDF205 KBFeb 23, 2026
AI Summary
The document outlines the Data Requirements List (CDRL) for an Automatic Aqueous Parts Washer contract, focusing on training requirements. The contractor must provide qualified representatives to train facility personnel on equipment installation, calibration, maintenance, and operation. This training includes a minimum of 5 hours for 10 system operation personnel and 5 hours for 5 maintenance personnel, incorporating verbal instruction and hands-on operations. All training aids must be supplied in English at no additional cost. Training will occur once for production personnel and once for maintenance personnel after successful acceptance testing. The Point of Contact (POC) will verify all training requirements and inform contracting of any necessary changes. The document also specifies distribution for administrative and operational use.
CDRL A0002 Lockout Tagout Parts Washer.pdf
PDF206 KBFeb 23, 2026
AI Summary
This government file outlines the Contract Data Requirements List (CDRL) for an Automatic Aqueous Parts Washer, specifically detailing the Lockout/Tagout (LOTO) procedure. The contractor is required to provide a machine-specific, graphical LOTO procedure that clearly describes the steps to achieve a zero-energy state, in accordance with OSHA Regulation CFR 1910.147. This procedure must be printed on durable, laminated material for posting on the equipment, with all LOTO locations clearly labeled and keyed to the procedure. Additionally, an electronic format of the procedure is required for integration into a maintenance management system. The LOTO procedure is a one-time submission prior to work start, and it will be reviewed by the Production Engineering Division (PED) within seven working days for necessary changes. The document is for administrative and operational use only.
CDRL A0001 Project Time Period Parts Washer.pdf
PDF116 KBFeb 23, 2026
AI Summary
This government file outlines the Contract Data Requirements List (CDRL) for an Automatic Aqueous Parts Washer, emphasizing project timelines and contractor responsibilities. The contractor must install and make the machine operational within six months of the contract award. A detailed project time chart, including milestones, is required prior to work commencement and is subject to approval by the Requiring Office (RRAD, Contracting). Any modifications or extensions to the schedule must be requested through the Contracting Officer. The contractor is also responsible for coordinating the installation schedule with the RRAD POC 60 days before delivery, with the installation schedule subject to approval. The document specifies RRAD's four-day, ten-hour workweek and outlines procedures for contractors requesting to work on Fridays. The POC will review the projected time chart and inform contracting of any necessary changes within seven working days. The project time chart is required only once before the work begins, and distribution of the chart is for administrative and operational use only.
Combined Synopsis Power washer V 0.3.pdf
PDF161 KBFeb 23, 2026
AI Summary
The Red River Army Depot is soliciting offers for a new STINGRAY 4063 PARTS WASHER with upgrades or an equivalent automatic aqueous parts washer. This combined synopsis/solicitation, W911RQ26QA010, is a 100% Small Business set-aside under NAICS code 333310. The selected contractor will be responsible for designing, fabricating, installing, testing, and commissioning the parts washer, including site preparation, delivery, offloading, positioning, and training. The machine must meet specific technical requirements, including power, heat source, pump HP, flow, pressure, temperature range, and reservoir capacity. Installation and operational readiness are required within 12 months of contract award, with specific provisions for training, manuals, and a one-year warranty. Offers are due by March 2, 2026, and will be evaluated based on technical capability, price, and past performance.

Related Contract Opportunities

Project Timeline

postedOriginal Solicitation PostedFeb 23, 2026
deadlineResponse DeadlineMar 2, 2026
expiryArchive DateMar 17, 2026

Agency Information

Department
DEPT OF DEFENSE
Sub-Tier
DEPT OF THE ARMY
Office
W6QK ACC RRAD

Point of Contact

Name
Aeric Miller

Place of Performance

Texarkana, Texas, UNITED STATES

Official Sources