Awarded ContractSolicitationTotal Small Business Set-Aside (FAR 19.5)
Project No. 7385095 Replace Chillers, Building 4224
DEPT OF DEFENSE• 7385095
Total Obligated
$2,999,815
SAM.gov
Current Recipient
MECHWORKS MECHANICAL CONTRACTORS, INC Morehead City NC 28557 USA
Sep 28, 2025
Set-Aside
Total Small Business Set-Aside (FAR 19.5)
Notice Type
Solicitation
Contract Opportunity Analysis
The Department of Defense, through the Naval Facilities Engineering Command Mid-Atlantic, is soliciting proposals for the "Replace Chillers, Building 4224" project at Marine Corps Air Station Cherry Point, North Carolina. This project involves the demolition of the existing cooling water system and the installation of new chillers, pumps, and associated controls, with a focus on maintaining operational continuity during the transition. The estimated contract value ranges from $1,000,000 to $5,000,000, and proposals are due by September 4, 2025, at 12:00 PM EDT. Interested contractors must contact Christina A. Newton at christina.a.newton.civ@us.navy.mil or Meghan J. Hislop at meghan.j.hislop.civ@us.navy.mil for further details.
Classification Codes
NAICS Code
238220
Plumbing, Heating, and Air-Conditioning Contractors
PSC Code
Z2JZ
REPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS
Solicitation Documents
4157130 Roof Trusses Area 4 and 5.pdf
PDF•2291 KB•9/3/2025
AI Summary
No AI summary available for this file.
4157132 Roof Trusses Area 4 and 5.pdf
PDF•2128 KB•9/3/2025
AI Summary
No AI summary available for this file.
4157120 Roof Framing Plan.pdf
PDF•3342 KB•9/3/2025
AI Summary
No AI summary available for this file.
4157142 Steel Notes.pdf
PDF•2601 KB•9/3/2025
AI Summary
No AI summary available for this file.
B4224 Photos.pdf
PDF•5329 KB•9/3/2025
AI Summary
No AI summary available for this file.
7385095 AMENDMENT 0002_Final.pdf
PDF•371 KB•9/3/2025
AI Summary
Amendment 0002 to Project Number 7385095, "Replace Chillers, Building 4224" at MCAS Cherry Point, NC, addresses pre-proposal inquiries and incorporates an attachment. The amendment provides responses to requests for photos of existing centrifugal chillers, the secured room beside the mechanical room, and the bar joist and floor area from the mechanical room to the F135 testing area. The government provided photos for the chillers and the secured room, but was unable to provide photos of the floor in the secure room due to proprietary content. The deadline for proposal submission remains September 3, 2025, at 12:00 pm EDT. All other contract terms and conditions are unchanged. This amendment is crucial for bidders to accurately assess the project scope and submit compliant proposals.
7385095 AMENDMENT 0001_Final.pdf
PDF•310 KB•9/3/2025
AI Summary
Amendment 0001 for Project Number 7385095, "Replace Chillers, Building 4224" at MCAS Cherry Point, NC, updates the original solicitation. This amendment, effective August 6, 2025, incorporates four new attachments: 4157120 Roof Framing Plan, 4157130 Roof Trusses Area 4 & 5, 4157132 Roof Trusses Area 4 & 5, and 4157142 Steel Notes. All other terms and conditions of the original solicitation remain unchanged. Proposals are still due by September 3, 2025, at 12:00 PM EDT. Proposers must acknowledge receipt of this amendment when submitting their proposals, with failure to do so potentially leading to rejection. If a proposal has already been submitted, acknowledgement can be made via telegram confirming whether the price remains unchanged, increases, or decreases.
7385095 RFP.pdf
PDF•198 KB•9/3/2025
AI Summary
The Naval Facilities Engineering Command, Mid-Atlantic, is soliciting proposals from a select list of contractors for Project No. 7385095, "Replace Chillers, Building 4224" at MCAS Cherry Point, North Carolina. This Request for Proposal (RFP) has an estimated cost range of $1,000,000.00 to $5,000,000.00 and a 450-calendar-day completion period. The project falls under NAICS Code 238220 (Plumbing, Heating, and Air-Conditioning Contractors) with a $19 million standard size. Key requirements include a mandatory site visit on August 13, 2025, and bid, payment, and performance bonds based on proposal value. Proposals are due by September 3, 2025, at 1200 local time, and must be submitted to two specified email addresses. The award basis is the lowest price, and the government intends to issue a task order without discussions. Wage determinations are governed by General Decision Number NC20250018, effective January 3, 2025, which includes specific wage rates for various trades and adherence to Executive Orders on minimum wage and paid sick leave.
7385095 DrawingsAsOne SIGNED.pdf
PDF•6875 KB•9/3/2025
AI Summary
The document outlines the "Replace Chillers B4224 FRCE" project at Marine Corps Air Station, Cherry Point, North Carolina, a federal government RFP. It details the structural scope, including demolition, roof framing, and platform framing plans, along with truss reinforcing and platform elevations. The project emphasizes adherence to design loads for gravity, wind, and seismic forces, and outlines material specifications for structural steel. Key aspects include coordination with other trades, verification of existing conditions, and adherence to various building codes and standards. The document also provides a comprehensive sheet index covering general, structural, architectural, mechanical, and electrical components, ensuring detailed planning and execution for the chiller replacement and associated structural modifications.
7385095 SpecsAsOne SIGNED.pdf
PDF•2391 KB•9/3/2025
AI Summary
The document outlines the
12892020 Amendment 0005.pdf
PDF•787 KB•9/3/2025
AI Summary
The document outlines the Level 1 - Phase 2 Piping Plan for the FRC-E, Marine Corps Air Station, Cherry Point, North Carolina, concerning the replacement of chillers in Building B4224. This project, with a MAXIMO Workorder No. 7385095 and Project No. 12892020, details the demolition and new work required. Phase 2 involves removing temporary caps from Phase 1 and connecting new equipment, including chilled water pumps with strainers, suction diffusers, and flex connections. The plan emphasizes tying in new chiller supply piping to the main system and updating controls, while retaining the existing control box for water-cooled chiller controllers. Contractors must verify existing conditions, coordinate system outages, and adhere to demolition plans for the entire cooling water system, including pumps, piping, cooling towers, and controls. The document also provides a keyplan, graphic scales, and general sheet notes, with an amendment dated September 2, 2025.
12892022 Amendment 0005.pdf
PDF•482 KB•9/3/2025
AI Summary
The document outlines a two-phase project to replace chillers at Marine Corps Air Station Cherry Point, North Carolina, specifically at FRC-E, Building B4224. The project, titled "REPLACE CHILLERS B4224 FRCE," involves the demolition of the existing cooling water system, including pumps, piping, cooling towers, and controls. Phase 1 focuses on removing water-cooled chillers and cooling towers, installing a buffer tank, and setting up temporary chiller connections to maintain building operations. Phase 2 involves connecting new equipment to the main chiller supply piping and updating controls. The project emphasizes verifying existing conditions, minimizing system outages, and coordinating with Cherry Point personnel. The document includes various sections and drawing details for the demolition and new work, dated March 22, 2024, with an amendment on September 2, 2025. The project is managed by NAVFAC SYSCOM MID-ATLANTIC.
12892023 Amendment 0005.pdf
PDF•222 KB•9/3/2025
AI Summary
This government file, likely an addendum or detail sheet for a federal government RFP related to facilities maintenance or upgrades, provides detailed mechanical and structural specifications for the FRC-E at Marine Corps Air Station, Cherry Point, North Carolina. The document outlines specific installation requirements for an inline close-coupled pump with an inertia base, a buffer tank, pipe penetrations through roof curbs, clevis hangers, heat trace systems, HVAC roof equipment supports, and wall supports for vertical piping. Key instructions include ensuring full line size for all valves and fittings, specific check valve placement to prevent turbulence, pump insulation, and detailed construction requirements for various components like the buffer tank and roof penetrations. The project, identified as "REPLACE CHILLERS B4224 FRCE," emphasizes precise engineering and adherence to NAVFAC standards, ensuring proper functionality and structural integrity for critical HVAC and piping systems within the facility.
12892026 Amendment 0005.pdf
PDF•178 KB•9/3/2025
AI Summary
The document outlines the Chilled Water System Control Diagram for the Marine Corps Air Station, Cherry Point, North Carolina, detailing the requirements for a single Chilled-Water Plant Management System. This system will control chillers and chilled water pumps, modulate the building chilled water bypass valve, and monitor temperatures and chiller loads. Key functions include alternating pump operation with N+1 redundancy and automatic pump switching upon failure, coordinating sequences with chiller manufacturers to prevent freezing, and integrating with the existing Building Automation System. The bypass valve control is based on differential pressure, modulating to maintain a fixed setpoint. The system will also calculate instantaneous and weekly building tonnage. Chiller control involves a detailed start-up and shut-down sequence based on building chilled water supply temperature and chiller load, with lead and lag chillers alternating weekly. This comprehensive control strategy ensures efficient, safe, and automated operation of the chilled water system.
7385095 AMENDMENT 0005_Final.pdf
PDF•473 KB•9/3/2025
AI Summary
Amendment 0005 to NAVFAC Specification 7385095, for replacing chillers in Building 4224 at MCAS Cherry Point, NC, clarifies key technical specifications and extends the proposal submission deadline to September 4, 2025, by 12:00 pm (EDT). This amendment addresses pre-proposal inquiries, specifically detailing pump configurations to be inline close-coupled pumps with vertical motors and mandating a single chiller plant management system for integrated lead/lag control of chillers, pumps, and control valves. It also refers to specific sections for warranty requirements for air-cooled chillers. Additionally, it updates and replaces several NAVFAC drawings (12892020, 12892022, 12892023, and 12892026) with their revised versions dated September 2, 2025. All other contract terms and conditions remain unchanged. Proposers must acknowledge this amendment to ensure their proposals are considered valid.
7385095 AMENDMENT 0004_Final.pdf
PDF•410 KB•9/3/2025
AI Summary
Amendment #0004 for project 7385095, "Replace Chillers, Building 4224" at MCAS Cherry Point, NC, extends the proposal submission deadline. Proposals are now due by September 4, 2025, at 12:00 PM (EDT). This amendment must be acknowledged with the proposal, or if already submitted, through a telegram confirming whether the price remains unchanged, decreases, or increases. Failure to acknowledge may result in proposal rejection. The amendment details administrative information, including the issuing and administering codes, and emphasizes the importance of timely acknowledgment for all offers.
12892019 Amendment 0003.pdf
PDF•338 KB•9/3/2025
AI Summary
The document outlines Phase 1 of the chiller replacement project at Marine Corps Air Station Cherry Point, North Carolina, specifically for FRC-E, Building 4224. This phase involves the demolition of existing water-cooled chillers, cooling towers, and associated condenser water piping, along with the installation of a new buffer tank. Temporary chiller connections will be made to ensure continuous building operation during the system outage. The project requires the contractor to verify existing conditions, coordinate system outages, and dispose of refrigerants and compressor oil in accordance with RCRA procedures. Key tasks include removing chillers, chilled water piping, and chiller isolation valves, preparing existing pump pads for reuse, and patching and repairing penetrations. The existing control box containing the water-cooled chiller controller will be retained for reuse with new heat trace controls. This project is critical for modernizing the facility's cooling infrastructure while maintaining operational continuity.
05 12 00 Amendment 0003.pdf
PDF•38 KB•9/3/2025
AI Summary
This government file, Section 05 12 00, outlines the comprehensive requirements for structural steel work in the “Replace Chillers, Building 4224” project (7255002). It details the standards, references, and procedures for structural steel systems, including design, materials, fabrication, erection, inspection, and quality control. Key aspects covered include references to AISC, ASME, AWS, and ASTM standards for structural steel, bolts, nuts, washers, welding, and galvanizing. The document also specifies submittal requirements for preconstruction, shop drawings, product data, test reports, and certifications. Seismic provisions, quality assurance, and detailed instructions for fabrication, erection, connections, and welding are provided. Emphasis is placed on material composition, requiring minimum recycled content for structural steel, tubing, and pipe. Extensive field quality control measures, including visual and nondestructive testing for welds and bolts, are mandated to ensure compliance and structural integrity.
7385095 AMENDMENT 0003_Final.pdf
PDF•521 KB•9/3/2025
AI Summary
Amendment #0003 to Specification 7385095,
Related Contract Opportunities
Project Timeline
postedOriginal Solicitation PostedAug 6, 2025
amendedAmendment #1Aug 6, 2025
amendedAmendment #2Aug 25, 2025
amendedAmendment #3Aug 29, 2025
amendedAmendment #4Sep 2, 2025
amendedLatest AmendmentSep 3, 2025
deadlineResponse DeadlineSep 4, 2025
awardAwarded to MECHWORKS MECHANICAL CONTRACTORS, INC Morehead City NC 28557 USASep 28, 2025
expiryArchive DateSep 19, 2025
Agency Information
Department
DEPT OF DEFENSE
Sub-Tier
DEPT OF THE NAVY
Office
NAVFACSYSCOM MID-ATLANTIC
Point of Contact
Place of Performance
Cherry Point, North Carolina, UNITED STATES