ContractSolicitationTotal Small Business Set-Aside (FAR 19.5)

Y--Leadville, CO Windows and Doors

INTERIOR, DEPARTMENT OF THE 140FGA26R0012
Response Deadline
Apr 10, 2026
6 days left
Days Remaining
6
Until deadline
Set-Aside
Total Small Business Set-Aside (FAR 19.5)
Notice Type
Solicitation

Contract Opportunity Analysis

The U.S. Department of the Interior’s Fish and Wildlife Service is seeking a firm-fixed-price construction contractor to replace windows and doors at the Leadville National Fish Hatchery in Leadville, Colorado. The work covers three residences, including furnishing labor, materials, equipment, and supervision to install new windows, doors, trim, and related removals and disposal. The scope also includes site access and protection, temporary utilities, storage, permits, submittals, warranties, and compliance with construction, labor, and material requirements such as Buy American, Davis-Bacon, and bond provisions; the amendment clarifies items like replacement of concrete at specific window wells and upstairs emergency egress doors. This is a total small business set-aside under Solicitation No. 140FGA26R0012, and the performance period runs from May 1, 2026, through September 30, 2026.

Classification Codes

NAICS Code
236220
Commercial and Institutional Building Construction
PSC Code
Y1AA
CONSTRUCTION OF OFFICE BUILDINGS

Solicitation Documents

6 Files
A04_SOW_Leadville_Windows_and_Doors_1.pdf
PDF1054 KBMar 4, 2026
AI Summary
The Statement of Work outlines a project for Leadville National Fish Hatchery to replace windows and install doors on three residences (Quarters 48, 49, and 50). The work includes providing and installing new windows, doors, and trim, as well as disposing of all removed materials. Bidders are encouraged to visit the site to understand existing conditions. The contractor will be responsible for temporary utilities, site access, equipment storage, debris removal, traffic regulation, and protection/restoration of the site. The project specifies performance requirements from May 1, 2026, to September 30, 2026, with a completion target of 142 calendar days from the Notice to Proceed. Detailed project requirements include specific types of windows (Anderson 100 Series or equivalent, Energy Star rated, egress compliant), blinds, window wells, concrete sawing of basement walls, and external emergency egress doors. All materials must be installed according to manufacturer instructions, and the contractor is responsible for obtaining permits and coordinating with the Contracting Officer. Final inspection and payment are contingent upon completion, cleanup, and submission of required documentation.
Sol_140FGA26R0012_Amd_0001.pdf
PDF209 KBMar 30, 2026
AI Summary
This amendment (0001) to solicitation 140FGA26R0012 incorporates questions and answers related to a construction project. Key clarifications include the requirement to replace existing concrete at window wells (Units 48 and 49), the absence of existing footing drains, and the Government's responsibility for mold mitigation and the removal of items like carpeting and firewood. Only one window per unit needs replacement, specifically the one sharing wood piles. External emergency egress doors are required upstairs, with stairs matching the entrance vernacular, and no concrete ramps are needed. A staging area will be negotiated with the station to minimize impact, and dirt removal is not required daily. The Government is also responsible for removing firewood from basements. The period of performance is from May 1, 2026, to September 30, 2026, with all other terms and conditions remaining unchanged. Offers must acknowledge this amendment via specified methods before the deadline, or risk rejection.
Sol_140FGA26R0012.pdf
PDF861 KBMar 30, 2026
AI Summary
This document is a solicitation for a Firm Fixed Price Construction contract for Leadville Windows & Doors, identified as Solicitation No. 140FGA26R0012. It outlines the requirements for contractors to furnish labor, materials, equipment, and supervision for the project, with a performance period from May 1, 2026, to October 31, 2026. Key aspects include compliance with federal acquisition regulations, particularly regarding supply chain security (FASCSA orders), Buy American provisions for construction materials, and various labor standards like the Davis-Bacon Act. The document details administrative requirements for invoicing through the Invoice Processing Platform (IPP), work hours, environmental considerations including endangered species and historical preservation, and proper handling of hazardous materials. It also specifies requirements for performance and payment bonds and outlines the process for proposal submission and contract award.
B03_WD_CO20260001.pdf
PDF277 KBMar 30, 2026
AI Summary
The provided government file appears to be a highly technical document, likely associated with federal government RFPs, federal grants, or state/local RFPs. Due to the extensive use of non-standard characters, symbols, and what appears to be a heavily encrypted or corrupted format, the specific content, main topic, key ideas, and supporting details are unreadable and cannot be accurately deciphered. The file's structure suggests sections of data or code, but without legible text, a comprehensive summary is not possible. The document's purpose, therefore, cannot be determined from the given information.
A04_Price_Schedule_Leadville_Windows_Doors.pdf
PDF10 KBMar 30, 2026
AI Summary
This document outlines a price schedule for the
A04_SOW_Leadville_Windows_and_Doors.pdf
PDF1054 KBMar 30, 2026
AI Summary
This Statement of Work outlines the requirements for replacing windows and installing doors at the Leadville National Fish Hatchery in Leadville, Colorado. The project involves three residences (Quarters 48, 49, and 50) and includes providing and installing new windows, doors, and trim, as well as the disposal of removed materials. Bidders are urged to visit the site to familiarize themselves with existing conditions. The contractor will be responsible for temporary utilities, site access, equipment storage, protection and restoration of the site, traffic regulation, and proper delivery and storage of materials. The document details specific requirements for the type and performance of windows, doors, blinds, window wells, concrete work, and sealants. The contractor must submit electronic submittals for approval, obtain necessary permits, and provide manufacturer warranties. The performance period is from May 1, 2026, to September 30, 2026, with a completion deadline of 142 calendar days from the Notice to Proceed. Final inspection and cleanup procedures are also specified, along with conditions for final payment.

Related Contract Opportunities

Project Timeline

postedOriginal Solicitation PostedMar 4, 2026
amendedLatest AmendmentMar 30, 2026
deadlineResponse DeadlineApr 10, 2026
expiryArchive DateApr 25, 2026

Agency Information

Department
INTERIOR, DEPARTMENT OF THE
Sub-Tier
US FISH AND WILDLIFE SERVICE
Office
FWS, GAOA

Point of Contact

Name
Luang-Khot, Johnny

Official Sources