Nickel Purification System
Contract Opportunity Analysis
UT-Battelle, LLC, the management and operations contractor for the Oak Ridge National Laboratory, is seeking proposals for an automated nickel purification system to support a Department of Energy-funded project. The selected subcontractor will design and construct a system that automates the multi-stage extraction, purification, electroplating, dissolution, and gravimetric drying of nickel metal. The system must feature high-accuracy positioning rails, a dedicated Windows PC, open-source control software in Visual Basic.NET, and Teflon-fabricated components to withstand acidic and basic reagents. The statement of work specifies a two-month construction window following design approval under a fixed-price contract. Proposals and inquiries should be directed to primary contact Mckenzi Baz at bazmk@ornl.gov or secondary contact Terri Cleveland at ytc@ornl.gov.