ContractSolicitation

TAMPA HARBOR MAINTENANCE DREDGING EGMONT AND MULLET KEY CUTS, HILLSBOROUGH COUNTY, FL

DEPT OF DEFENSE W912EP26BA006
Response Deadline
Jun 18, 2026
29 days left
Days Remaining
29
Until deadline
Set-Aside
Full & Open
Notice Type
Solicitation

Contract Opportunity Analysis

The U.S. Army Corps of Engineers, Jacksonville District, is soliciting a single firm fixed-price contract for maintenance dredging of Tampa Harbor’s Egmont and Mullet Key Cuts in Hillsborough County, Florida. The work covers dredging of specified channel segments and placement of dredged material in the designated beach placement area on Egmont Key, along with turbidity monitoring, sea turtle trawling, environmental species monitoring, vibration control monitoring, MEC construction support, tilling, and related geotextile tube work. The project is an unrestricted solicitation with a base and two options, requires U.S. Coast Guard certified dredge equipment, and is structured around federal survey and environmental control requirements; the anticipated period of performance runs from notice to proceed through late 2026 depending on options exercised. Bids are due on or about 18 June 2026 and must be submitted electronically through PIEE, with the solicitation posted on SAM.gov and SAM registration required for award eligibility.

Classification Codes

NAICS Code
237990
Other Heavy and Civil Engineering Construction
PSC Code
Z1KF
MAINTENANCE OF DREDGING FACILITIES

Solicitation Documents

4 Files
Tampa_OM_GDR2018-Cut1_2_Mullet-11July2025.pdf
PDF5650 KBMay 20, 2026
AI Summary
The Geotechnical Data Report for Tampa Harbor Maintenance Dredging outlines field investigations and material characteristics for the Egmont Channel Cuts 1 & 2 and Mullet Key Channel in Hillsborough County, Florida. Prepared by the Jacksonville District Corps of Engineers, the report details regional geology, materials to be dredged (fine-grained quartz sand with silt and shell fragments, along with trash and debris), and definitions of logging terms. It includes summaries of vibracore and surficial sample data, index testing results, and boring log notes. Prospective offerors are strongly encouraged to inspect recovered materials at the Corps of Engineers District warehouse in Jacksonville before submitting bids to understand subsurface conditions thoroughly.
W912EP26BA006_THMD26_FINAL_PLANS_RTA_20260421.pdf
PDF110195 KBMay 20, 2026
AI Summary
This government file, Solicitation No. W912EP26BA006, from the US Army Corps of Engineers, Jacksonville District, outlines the Tampa Harbor Maintenance Dredging project for Egmont and Mullet Key Cuts in Hillsborough County, FL. The project involves dredging specific sections of Egmont Cut-1, Egmont Cut-2, and Mullet Key Cut, with estimated dredging quantities detailed for base and optional contracts. The dredged material will be used for beach placement at Egmont Key. The document includes detailed plans, control data for both channel and placement areas, abbreviations, symbols, and survey notes. All horizontal positions are referenced to the State Plane Coordinate System of 1983, Florida West Zone, and vertical datums are Mean Lower Low Water (MLLW) for depths and North American Vertical Datum of 1988 (NAVD 88) for elevations. The file emphasizes adherence to USACE and NOAA standards for surveying and positioning.
W912EP26BA006TampaHarborMDEgmontFY26_Vol2Specs_RTA_20260508_Rev.pdf
PDF6706 KBMay 20, 2026
AI Summary
The W912EP26BA006 document outlines the Jacksonville District's solicitation and specifications for the Tampa Harbor Maintenance Dredging project in Hillsborough County, Florida, specifically for the Egmont and Mullet Key Cuts. The project involves maintenance dredging, placement of dredged material on Egmont Key, and associated activities such as turbidity monitoring, sea turtle trawling, environmental species monitoring, vibration control monitoring, MEC construction support, tilling, and geotextile tube work. The document details administrative requirements, price and payment procedures for both single job and unit price items, and project scheduling. It emphasizes compliance with governmental safety requirements, environmental protection, and quality control. Key sections include control monument descriptions, weather and tide data, and the overall scope of work, highlighting the need for careful coordination and adherence to established protocols.
W912EP26BA006TampaHarborMDEgmontFY26_Vol1Specs_RTA_20260518_Rev.pdf
PDF2697 KBMay 20, 2026
AI Summary
The U.S. Army Corps of Engineers, Jacksonville District, has issued solicitation W912EP26BA006 for the Tampa Harbor Maintenance Dredging project in Hillsborough County, Florida. This sealed bid invitation covers maintenance dredging of the Egmont and Mullet Key Cuts, with an estimated cost between $10 million and $25 million. The project includes mobilization, unclassified excavation (258,000 cubic yards base, with options for 312,000 and 120,000 cubic yards), environmental monitoring, sea turtle trawling, standby time, disposal of unacceptable material, vibration control, MEC support, and geotextile tube installation. Bids are due by June 18, 2026, at 1:00 PM EDT, submitted electronically via the PIEE website. A virtual pre-bid conference and site visit are scheduled. Contractors must be SAM registered and adhere to various FAR and DFARS provisions, including requirements for performance and payment bonds, and certifications regarding responsibility matters.

Related Contract Opportunities

Project Timeline

postedOriginal Solicitation PostedMay 1, 2026
amendedAmendment #1· Description UpdatedMay 4, 2026
deadlineResponse DeadlineJun 18, 2026
expiryArchive DateMay 18, 2027

Agency Information

Department
DEPT OF DEFENSE
Sub-Tier
DEPT OF THE ARMY
Office
W074 ENDIST JACKSNVLLE

Point of Contact

Name
Meredith Gonzalez

Official Sources