679-19-101 Correct Critical Access and ADA Deficiencies B61

DEPARTMENT OF VETERANS AFFAIRS 36C24726R0069
Response Deadline
May 28, 2026
8 days left
Days Remaining
8
Until deadline
Set-Aside
Service-Disabled Veteran-Owned Small Business Set Aside
Notice Type
Solicitation

Contract Opportunity Analysis

VA VISN 7 Network Contracting Activity is soliciting a service-disabled veteran-owned small business to renovate the connecting corridor between Buildings 4 and 61 at the Tuscaloosa VA Medical Center to correct critical access and ADA deficiencies. The work includes demolition and replacement or modification of the corridor’s floor slope, walls, windows, roofing, HVAC, lighting, fire protection, railing, finishes, and related site work, with a staged plan to keep the medical center operating. The project calls for a fully sprinklered, non-combustible connector using helical piers, with a phased CPM schedule, Class 3 ICRA controls, and other measures to minimize disruption to the 24/7 facility; evaluation gives greater weight to past performance than price. Proposals are due by May 28, 2026, at 1:00 PM ET.

Classification Codes

NAICS Code
236220
Commercial and Institutional Building Construction
PSC Code
Y1DA
CONSTRUCTION OF HOSPITALS AND INFIRMARIES

Solicitation Documents

21 Files
36C24726R0069 0004.pdf
PDF85 KBMay 19, 2026
AI Summary
The Department of Veterans Affairs (VA) has issued Amendment 0004 to Solicitation Number 36C24726R0069 for VISN 7 Network Contracting Activity, specifically for Project Number 679-19-101. The primary purpose of this amendment is to extend the bid due date for proposals to May 28, 2026, at 1:00 PM ET. Additionally, the amendment includes the posting of follow-up Request for Information (RFI) List #2 and RFI List #3-Question 10, which features a photo of a helical pile embedded in footing. These attachments provide further clarification and information for offerors. The amendment ensures that all terms and conditions of the original solicitation remain in full force and effect, except for the specified changes.
Attachment 0004- RFI List 2- 679-19-101 with VA responses.pdf
PDF1053 KBMay 19, 2026
AI Summary
The document addresses two questions from an RFI list related to a VA construction project (Project #679-19-101). The first question clarifies the requirement for construction fencing, directing the offeror to Spec 01 00 00 1.6.H and the provided drawings for the designated areas. The second question concerns a picture attached by an offeror in a previous RFI, which the VA confirmed as acceptable. The document states that this picture (attachment 0004A) will be shared with all bidders to ensure everyone has the same information. This communication is essential for maintaining fairness and clarity in the bidding process for government contracts.
Attachment 0004A- Helical pile embeded in footing.jpg
JPEG3351 KBMay 19, 2026
AI Summary
The provided government file contains the text "# TOPCON HH". Due to the brevity and lack of contextual information, it is impossible to determine the main topic, purpose, or any specific details relevant to government RFPs, federal grants, or state/local RFPs. The file appears to be either incomplete, a placeholder, or contains highly abbreviated internal coding that is not decipherable without additional context. Therefore, a comprehensive summary cannot be generated from the given content.
36C24726R0069 0003.pdf
PDF106 KBMay 19, 2026
AI Summary
Amendment 0003 to Solicitation 36C24726R0069, issued by the Department of Veterans Affairs VISN 7 Network Contracting Activity, addresses a federal government Request for Proposal (RFP). The purpose of this amendment is to provide responses to Requests for Information (RFI) and to post three crucial documents: Attachment 0003: RFI Responses List, Attachment 0003A: 679-19-101 - Specifications Modification, and Attachment 0003B: Laydown Yard Map. The due date for proposals remains May 21, 2026, at 1:00 PM ET, unless a subsequent amendment alters this date. This amendment ensures all offerors receive updated information and revised specifications for the project.
Attachment 0003- RFI Combined List 679-19-101 with A-E Responses - VA responses.pdf
PDF2384 KBMay 19, 2026
AI Summary
The document compiles Requests for Information (RFIs) for Project #679-19-101, addressing various aspects of a federal government project. Key clarifications include the absence of commissioning, the requirement for a full-time site superintendent and QA/QC manager (who can dual-hat as ILSM/Infection Control/Safety Officer), and the non-permissibility of the superintendent also serving as the quality control or safety manager. Funding is approved, with a projected award date of July 9, 2026. Disruptive work may occur after hours. The project requires Class 3 ICRA containment, with lockable STARC walls considered. Information on existing systems (Fire Alarm, Security, CCTV, HVAC, BAS) and contacts are provided. The VA does not anticipate moisture remediation or hazardous materials outside of Division 02 specifications. The corridor's slope issue will be corrected with new concrete and leveling compound. Specific excavation methods are left to the contractor, with a warning against hydro-vacuuming in undercut locations. The landscape maintenance period is 12 months. Helical piers for new construction must be contractor-designed. Existing tie beams remain, with the top portion removed for new slab depth. Existing slab elevations are indicated on Sheet 61-A-101. The basis of design for the epoxy floor is PolySpec Thiokol for product and Sherwin Williams for color. EFCO XFORCE 663/663G single hung windows are specified, matching Building 4's existing windows. Material staging is restricted to a designated laydown yard with specific fencing and ground cover requirements. Alternate No. 1 includes new copper gutters and downspouts if accepted. Alternate No. 4 involves sealed concrete, with the VA acknowledging the different aesthetic and specifying post-cure application. Bid dates can be extended, and a second round of RFIs may be accommodated. Construction access, dumpster locations, badging procedures, hazardous material responsibility, and utility tie-in details are also clarified. Temporary barriers require ½” plywood on 3 5/8” metal studs where only dust isolation is needed, and 5/8” sheet rock on both sides with insulation for other areas. Fire-rated doors are required for specific temporary wall locations. The roof drain line is 6” diameter PVC. For cloth shades, the attached product literature should be used as reference.
Attachment 0003A- 679-19-101 -Specifications Modification 3-19-26.pdf
PDF8021 KBMay 19, 2026
AI Summary
The Department of Veterans Affairs (VA) VHA Master Specifications outlines the general requirements for a construction project, focusing on the renovation of a connecting corridor between Buildings 4 and 61 at the Tuscaloosa VAMC. The project includes modifications to the floor slope, new walls, windows, roofing, HVAC, lighting, fire protection, and site work. The document details safety, security, and operational procedures, emphasizing minimal disruption to the Medical Center, which operates 24/7. Key aspects include a phased work plan, strict security for personnel and documents, utility management, and a comprehensive warranty management plan. The contractor must develop a Critical Path Method (CPM) schedule, cost-load activities, and adhere to specific testing and instruction protocols for all installed systems.
Attachment 0003B- Laydown yard map.pdf
PDF317 KBMay 19, 2026
AI Summary
The document, titled "LAYDOWN YARD AREA OF WORK," is a concise government file likely related to federal RFPs, federal grants, or state and local RFPs. Its sole purpose is to define a specific operational zone designated as a "laydown yard" within a broader project's "area of work." This term typically refers to a temporary staging area used for storing materials, equipment, and possibly for pre-assembly during construction or renovation projects. The brevity of the file suggests it serves as a foundational reference, indicating the physical scope or geographical limits for logistical activities, resource management, and contractor operations. It is a critical component for defining project boundaries and managing on-site logistics.
Attachment 4 - Itemized Cost Breakdown 02.xlsx
Excel20 KBMay 19, 2026
AI Summary
The document,
Attachment 5- Wage Determination AL20260098.pdf
PDF70 KBMay 19, 2026
AI Summary
This document, General Decision Number AL20260098, details prevailing wage rates and fringe benefits for building construction projects in Tuscaloosa County, Alabama, effective January 2, 2026. It specifies rates for various crafts, including asbestos workers, boilermakers, power equipment operators, ironworkers, pipefitters, sheet metal workers, and numerous other construction trades. The document also includes information on Executive Order (EO) 13706, which mandates paid sick leave for federal contractors, and Executive Order 13658, which sets a minimum wage for covered workers. It outlines the process for adding unlisted classifications and provides detailed explanations of union, union average, survey, and state-adopted rate identifiers. Additionally, it describes the appeals process for wage determination matters, including initial decisions, requests for reconsideration by the Wage and Hour Administrator, and appeals to the Administrative Review Board.
Attachment 6 - INVOICING.pdf
PDF56 KBMay 19, 2026
AI Summary
This government file, Attachment 6 to RFP 36C24726R0069, outlines the invoicing procedures for contractors providing services to the Department of Veterans Affairs (VA). It mandates electronic invoice submission through the Tungsten Network e-Invoicing system, emphasizing compliance with FAR 52.232-33, FAR 52.232-5, and 852.232-70. Contractors must register with Tungsten Network, a free service for VA vendors, to submit invoices after approval by the Contracting Officer's Representative (COR) or Contracting Officer (CO). The document also notes the elimination of the VA10091 form as of July 1, 2020, requiring new vendors to update information in the Customer Engagement Portal (CEP) at https://www.cep.fsc.va.gov/. Contact information for Tungsten Network and the VA Financial Services Center (FSC) is provided for assistance with e-invoice setup and general inquiries.
Attachment 7- Specs 679-19-101.pdf
PDF7916 KBMay 19, 2026
AI Summary
The Department of Veterans Affairs (VA) VHA Master Specifications outline requirements for a construction project involving the renovation of a connecting corridor between Buildings 4 and 61 at the Tuscaloosa VAMC. The project, identified as 679-19-101, includes modifications to the floor slope, new walls, windows, railing, a sloped asphalt shingle roof, HVAC, lighting, fire protection, and site work, with provisions for demolition. The document details general requirements, security procedures, operational and storage areas, utility services, and warranty management. It also includes a list of drawing sheets covering general, civil, structural, architectural, plumbing, mechanical, electrical, fire alarm, fire suppression, and survey aspects. Alternate bid items are specified, allowing for variations in the stormwater drainage system, painting, gutter materials, and floor finishes. The contractor is required to develop a Critical Path Method (CPM) project schedule, provide detailed cost data for work activities, and adhere to specific phasing requirements to minimize disruption to the medical center's 24/7 operations.
Attachment 8- 679-19-101 - Drawings RTA Revised 3-19-26.pdf
PDF18359 KBMay 19, 2026
AI Summary
The document outlines the life safety and structural requirements for a pedestrian walkway connecting Buildings 61 and 4 at a Department of Veterans Affairs facility in Tuscaloosa, Alabama. The project, aimed at correcting critical access and ADA deficiencies, involves constructing a fully sprinklered, non-combustible walkway (Type IIB construction) with specific egress and fire safety features. Key codes referenced include VA Design Manual, NFPA 101, NFPA 13, NFPA 72, and IBC 2018. Structural design is based on IBC 2018, ASCE 7-16, and ACI 318-14, with a focus on foundations using helical piers due to existing soil conditions. The document details general building requirements, egress provisions (e.g., four exit doors, 32-inch clear width), and structural elements like concrete specifications and reinforcing steel. It also includes site demolition, site plans, and roof framing plans for the proposed connector.
Attachment 9- 679-19-101 - Site Visit Instructions 4-23-26.pdf
PDF472 KBMay 19, 2026
AI Summary
The document outlines a site plan or operational map, directing individuals to specific locations within an area. It identifies key points such as
Pre-Sol 36C24726R0069.pdf
PDF190 KBMar 24, 2026
AI Summary
The Department of Veterans Affairs (VA) has issued a presolicitation notice for Project 679-19-101: Correct Critical Access and ADA Deficiencies B61 at the Tuscaloosa, AL VA Medical Center. This is a 100% Set Aside for certified Service-Disabled Veteran-Owned Small Businesses (SDVOSBs). The project involves a firm-fixed-price construction contract with an estimated value between $1,000,000 and $5,000,000, to be completed within 365 calendar days. The work includes renovation of the connecting corridor between Buildings 4 and 61, modification of floor slope, installation of new HVAC, lighting, fire protection, finishes, and railing systems, along with necessary demolition. Prospective contractors must be certified SDVOSBs listed in the SBA certification database and registered in SAM. A pre-proposal site visit will be announced in the solicitation, and the selection will be based on a Trade-Off Source Selection process for best value. The NAICS code is 236220 (Commercial and Institutional Building Construction) and the PSC is Y1DA (Construction of Hospitals and Infirmaries). The official Request for Proposal (RFP) 36C24726R0069 will be posted on sam.gov around April 8, 2026.
36C24726R0069 0001.pdf
PDF81 KBMay 19, 2026
AI Summary
This amendment to solicitation 36C24726R0069, issued by the Department of Veterans Affairs, VISN 7 Network Contracting Activity, serves to provide offerors with the site visit attendance sheet and confirm the proposal due date. Attachment 0001, detailing site visit attendees, is included. The deadline for proposals remains May 8, 2026, at 1:00 PM ET, subject to potential future amendments. This document ensures offerors have necessary information for their submissions and clarifies the timeline for the solicitation process.
Attachment 0001 679-22-100 - Pre Bid Site Visit Sign in Sheet 4-23-26.pdf
PDF118 KBMay 19, 2026
AI Summary
The document is a site visit attendance sheet for Solicitation 36C24726R0069, titled "679-19-101 Correct Critical Access and ADA Deficiencies B61," held on April 23rd, 2026. It lists attendees, their contact information (phone and email), and their respective companies. The attendees represent various contracting and mechanical companies, indicating their interest in bidding on or participating in the project to correct critical access and ADA deficiencies.
36C24726R0069 0002.docx
Word114 KBMay 19, 2026
AI Summary
The Department of Veterans Affairs, VISN 7 Network Contracting Activity, issued Amendment 0002 for solicitation 36C24726R0069, VA-VHA-RPOE-2026-0019. The purpose of this amendment is to extend the due date for proposal submissions to May 21, 2026, at 1:00 PM ET. This extension allows offerors additional time to review and incorporate changes into their proposals, following the government's official response to Requests for Information (RFIs). The amendment clarifies that all other terms and conditions of the original solicitation remain unchanged and in full force and effect. Offerors must acknowledge receipt of this amendment to ensure their proposals are considered.
36C24726R0069.pdf
PDF665 KBMay 19, 2026
AI Summary
This document is a Request for Proposal (RFP) by the Department of Veterans Affairs (VA) for construction, alteration, or repair services at the Tuscaloosa, AL VAMC. The project, "Correct Critical Access and ADA Deficiencies Bldg. 61," involves renovating a connecting corridor, modifying floor slopes, installing new HVAC, lighting, fire protection, finishes, and railing systems, and demolishing existing structures. This acquisition is 100% set-aside for Service-Disabled Veteran Owned Small Businesses (SDVOSBs). The magnitude of construction is between $1,000,000 and $5,000,000. Key requirements include a 365-calendar day completion time, an organized site visit on 04-23-2026, and a deadline for Requests for Information (RFIs) by 04-29-2026. Proposals are due by 1:00 PM EST on 05-08-2026 and must be submitted electronically. Evaluation criteria prioritize past performance (significantly more important) and price, with a firm-fixed-price contract awarded based on the best value to the Government. Offerors must provide past performance references, a detailed price proposal, and comply with various certifications, including SAM, SBA, VETS-4212, and limitations on subcontracting. Safety records, including EMR, are also required. A bid guarantee of not less than 20% of the proposal price, up to $3,000,000, is mandatory, along with performance and payment bonds upon award.
Attachment 1 - Experience Modification Rate Form.pdf
PDF304 KBMay 19, 2026
AI Summary
RFP No. 36C24726R0069, Attachment 1, is an Experience Modification Rate Form that companies must complete and submit as part of their response to a government solicitation. The form requires offerors to provide detailed safety information for 2023, 2024, and 2025, derived from their OSHA 300 Forms. This includes the number of man-hours, cases involving days away from work or restricted activity, and the DART Rate. Additionally, companies must disclose any serious, willful, or repeat OSHA violations within the last three years, with explanations for any violations. A threshold of four serious, one repeat, or one willful violation will disqualify a contractor. The form also requests the company's Insurance Experience Modification Rate (EMR) for the past three years. Offerors are required to attach copies of their OSHA 300 and 300a Forms. This information, combined with data from government systems like OSHA and EPA online inspection databases, will be used to ensure the contractor meets the Experience Modification Rate specified in the solicitation, emphasizing contractor safety and compliance.
Attachment 2 - VAAR 852.219-75 VA Notice of Limitations on Subcontracting Jan 2023 Deviation.pdf
PDF150 KBMay 19, 2026
AI Summary
This document outlines the Department of Veterans Affairs (VA) notice of limitations on subcontracting for services and construction, as per 38 U.S.C. 8127(l)(2). Offerors must certify compliance with specific subcontracting limits based on the contract type: 50% for services, 85% for general construction, and 75% for special trade construction. These percentages apply to payments made to firms that are not certified Service-Disabled Veteran-Owned Small Businesses (SDVOSBs) or Veteran-Owned Small Businesses (VOSBs). The cost of materials is excluded for construction contracts. Offerors acknowledge that false certifications can lead to criminal, civil, or administrative penalties. Failure to comply can result in referral to the VA Suspension and Debarment Committee, fines, and prosecution. The VA reserves the right to request documentation to verify compliance at any time. A formal certification must be completed and submitted with the offer; otherwise, the offer will be deemed ineligible.
Attachment 3 - Past Performance Questionnaire -PPQ.pdf
PDF375 KBMay 19, 2026
AI Summary
The Past Performance Questionnaire (PPQ) for Solicitation RFP 36C24726R0069, “Correct Critical Access and ADA Deficiencies B61,” is an essential attachment for offerors. This document requires offerors to submit a cover sheet with their proposal and forward the complete questionnaire to their previous clients. Clients are instructed to return the cover sheet and questionnaire directly to Cayley.blommers@va.gov. Offerors must ensure that all provided contact information is accurate and verifiable. The PPQ is divided into three sections: Section I requires the offeror to fill in basic contract information, such as offeror name, client reference, contract number, project description, contract amount, performance period, and the contractor’s role (prime or sub-contractor). Section II is for evaluators to numerically rate the contractor’s performance across 13 criteria, including compliance, on-site management, personnel use, timeliness, adherence to schedule, safety responsiveness, subcontractor coordination, customer interaction, problem-solving, financial management, responsiveness to concerns, and warranty notifications. It also asks if the evaluator would recommend or work with the contractor again. The rating scale ranges from 1 (unacceptable) to 5 (superior), with an N/A option. Section III provides space for evaluators to offer additional comments and explain any low ratings. Evaluators must also provide their signature, title, phone number, and email address.

Related Contract Opportunities

Project Timeline

postedOriginal Solicitation PostedMar 24, 2026
amendedAmendment #1· Description UpdatedApr 24, 2026
amendedAmendment #2· Description UpdatedMay 7, 2026
amendedAmendment #3· Description UpdatedMay 14, 2026
amendedLatest Amendment· Description UpdatedMay 19, 2026
deadlineResponse DeadlineMay 28, 2026
expiryArchive DateJun 12, 2026

Agency Information

Department
DEPARTMENT OF VETERANS AFFAIRS
Sub-Tier
VETERANS AFFAIRS, DEPARTMENT OF
Office
247-NETWORK CONTRACT OFFICE 7 (36C247)

Point of Contact

Name
Cayley Blommers

Place of Performance

Tuscaloosa, Alabama, UNITED STATES