ContractPresolicitation

DT-574 Hydrophones

DEPT OF DEFENSE N66604-26-R-0068
Response Deadline
Jun 30, 2026
33 days left
Days Remaining
33
Until deadline
Set-Aside
No Set aside used
Notice Type
Presolicitation

Contract Opportunity Analysis

The Naval Undersea Warfare Center Division Newport, under the Department of the Navy, is seeking a contractor for DT-574 first article and production hydrophones under an unrestricted federal procurement. The work covers a build-to-performance approach that includes design, documentation, manufacturing, testing, packaging, and delivery of first article and production units in support of a single firm-fixed-price five-year IDIQ contract. The requirement is tied to Critical Item Performance Specification performance standards and includes a first article phase followed by production, with the place of performance in Newport, Rhode Island and evaluation focused on technical capability, past performance, and price. The anticipated RFP release is April 2026, the proposal closing date will be set in the RFP, and offerors must be registered in SAM; access to the draft SOW and related documents requires JCP certification, a vendor CAGE code, and a certified DD2345 through the designated POC.

Classification Codes

NAICS Code
334511
Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing
PSC Code
5845
UNDERWATER SOUND EQUIPMENT

Solicitation Documents

1 Files
I.A.1. Statement of Work DRAFT for synopsis.docx
Word68 KBMay 29, 2026
AI Summary
This Statement of Work (SOW) outlines the requirements for a DT-574 Hydrophone Production Contract for the Naval Undersea Warfare Center Division, Newport (NUWCDIVNPT). The contractor will be responsible for the design, documentation, manufacturing, testing, packaging, and delivery of DT-574 First Article and Production hydrophones according to performance specifications. The SOW details the background, places of performance, authorized users, sponsors, and types of funding. Key requirements include conducting kick-off meetings, submitting progress and failure reports, and executing a two-phase process: First Article and Production. The First Article phase involves hardware design, configuration reviews (Preliminary and Final), physical configuration audits, test procedure development, and extensive testing and inspection to establish a baseline. The Production phase focuses on manufacturing, testing, and delivering production hydrophones in accordance with the established product baseline, including ongoing quality control, certification, and annual program reviews. The document also specifies applicable security compliance, including handling classified and controlled unclassified information (CUI), OPSEC, and electronic spillage protocols.

Related Contract Opportunities

Project Timeline

postedOriginal Solicitation PostedJan 29, 2026
amendedAmendment #1· Description UpdatedFeb 17, 2026
amendedAmendment #2· Description UpdatedMar 27, 2026
amendedLatest AmendmentMay 29, 2026
deadlineResponse DeadlineJun 30, 2026
expiryArchive DateJul 15, 2026

Agency Information

Department
DEPT OF DEFENSE
Sub-Tier
DEPT OF THE NAVY
Office
NUWC DIV NEWPORT

Point of Contact

Place of Performance

Newport, Rhode Island, UNITED STATES

Official Sources