Electric Vehicle Charging Station Design & Installation, Naval Station Newport
ID: 6021480Type: Combined Synopsis/Solicitation
Overview

Buyer

DEPT OF DEFENSEDEPT OF THE NAVYNAVFACSYSCOM MID-ATLANTICNORFOLK, VA, 23511-0395, USA

NAICS

Commercial and Institutional Building Construction (236220)

PSC

CONSTRUCTION OF MISCELLANEOUS BUILDINGS (Y1JZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)
Timeline
    Description

    The Department of Defense, through the Naval Facilities Engineering Command Mid-Atlantic, is soliciting proposals for the design and installation of electric vehicle charging stations at Naval Station Newport, Rhode Island. The project aims to enhance the infrastructure supporting Government fleet vehicles by providing Level 2 charging facilities at Buildings 1, A63, and A9, in alignment with federal initiatives to reduce emissions. This procurement is critical for advancing sustainable transportation solutions within military operations, with a contract value estimated between $1 million and $5 million, to be completed within 365 days of award. Interested contractors must submit proposals by August 21, 2024, and can direct inquiries to Kristin Zambarano at kristin.l.zambarano.civ@us.navy.mil or by phone at 860-694-5625.

    Point(s) of Contact
    Files
    Title
    Posted
    The document outlines the Request for Proposal (RFP) for a small project involving the installation of Electric Vehicle Charging Stations at Coddington Cove, Newport, RI. It is structured into six main parts, which delineate proposal forms, general requirements, project scope, material specifications, prescriptive specifications, and project attachments. Key areas covered in the document include contract administration requirements, project specifications, quality control measures, contractor obligations, and safety protocols. The RFP emphasizes the importance of a quality assurance program and mandates adherence to federal regulations regarding construction standards, environmental protection, and accessibility. The contractor must establish a quality control plan, secure necessary permits, and adhere to a strict schedule for design and construction phases. Detailed submittal procedures are outlined along with expectations for budget management and progress tracking. Furthermore, the document stresses the importance of communication with the Contracting Officer and compliance with security regulations on military installations. Overall, this RFP underlines the government’s commitment to integrating sustainable practices and ensuring project quality, safety, and compliance through structured design and construction processes.
    The document outlines a project proposal for the installation of electric vehicle (EV) charging stations at Naval Station Newport, Rhode Island, specifically detailing the existing conditions, conceptual plans, and utilities for three buildings: Building 1, Building A63, and Building A9. It includes detailed construction guidelines, specifications for electrical equipment, and parking area alterations, emphasizing the importance of adhering to safety regulations such as OSHA standards. The project scope involves paving, utility management, and installation of electric charging infrastructure to support sustainable transportation initiatives. Important elements include the environmental review checklist, soil management plans, and the design guidance for EV facilities. The intent is to enhance the facility's capabilities while ensuring compliance with federal and state regulations concerning safety, environmental protection, and construction practices. The complexity of the project necessitates a thorough understanding of existing utilities, with advance planning for excavation and utility shut downs. The document serves as a comprehensive guide to support the execution of the proposed upgrades while maintaining safety and environmental integrity.
    The document outlines the wage determination for construction projects in Rhode Island under the Davis-Bacon Act, applicable to building, heavy, highway, and marine construction statewide. It specifies minimum wage rates associated with Executive Orders 14026 and 13658, mandating that workers on contracts awarded after specified dates must be paid at least $17.20 or $12.90 per hour, depending on contract circumstances. The file lists various trade classifications, their corresponding wage rates, and fringe benefits for skilled laborers such as electricians, carpenters, and laborers. Specific rates for hazardous materials handlers, welders, and other specialties are also provided. Additional provisions include paid sick leave under EO 13706, ensuring workers’ rights, and stipulations for unlisted classifications. This wage determination is essential for compliance with federal contracting regulations and ensures fair compensation for labor involved in public construction projects.
    The document outlines the mandatory inclusion of FAR 52.204-24 and 52.204-25 in federal solicitations and RFPs regarding telecommunications and video surveillance services or equipment. As of August 2020, all proposals must confirm whether the offeror provides or uses covered telecommunications equipment as per the John S. McCain National Defense Authorization Act of 2019, which prohibits executive agencies from obtaining such equipment. The provision defines "covered telecommunications equipment or services" and specifies procedures for offerors to disclose relevant information if applicable. Key points include the definitions of critical technologies, the prohibition against contracting for covered equipment, and the obligation for offerors to check the SAM for excluded parties. It also mandates detailed disclosure for offerors who indicate they will provide covered equipment or services, including the identity of the producer, descriptions, and justifications for usage. This information ensures compliance with federal laws aimed at safeguarding government contracts from potential security risks associated with certain telecommunications systems, thereby strengthening national security protocols.
    The document outlines the requirements and protocols for utilizing the Naval Facilities Engineering Command's (NAVFAC) Electronic Construction and Facility Support Contract Management System (eCMS) for managing electronic technical submittals and documents during construction projects. It specifies the necessity of web-based data management, indicating that paper or email submissions are generally prohibited unless eCMS is unavailable. User access is controlled through assigned roles, and approval from the Contracting Officer's Representative (COR) is required for specific submissions. The document specifies system requirements, including the need for a digital identification for secure access and the provision of a tablet for governmental use at job sites. It addresses security classifications for construction data, mandating unclassified use and proper markings for documents labeled as "For Official Use Only" (FOUO). Additionally, it emphasizes the importance of maintaining accurate records and properly designating project documentation types to ensure compliance with governmental guidelines. Overall, the document serves to streamline the contracting process and safeguard sensitive information while maintaining project integrity and compliance within the federal framework.
    The document outlines a Request for Information (RFI) process under Contract Number RFP 5997283, aimed at addressing specific inquiries from contractors. It emphasizes that RFI responses do not authorize contractors to proceed with work, which is at their own risk, and mandates that any perceived changes to contract conditions must be reported to the Contracting Officer within 20 days. The instructions clarify the roles of a prime contractor and subcontractors, specifying that responses should not be viewed as contractual modifications. Responses must be documented with signatures to ensure accountability. This RFI system supports the efficient management of contractor inquiries while safeguarding the integrity and terms of the original contract. The distributed information will be archived through designated channels, ensuring proper oversight in the construction phase. Overall, the document ensures compliance and communication within the context of federal contracting and project management.
    The document outlines a Request for Proposal (RFP) for the installation of electric vehicle charging stations at NAVSTA Newport, Rhode Island, specifically for buildings B1, A63 South, A63 North, and A9. It details various Contract Line Items (CLINs), including the base price for design and construction of charging stations at selected locations as well as optional items for additional construction work. The summary includes a total price format for each CLIN and specifies that the completion time is generally set at 365 days for the base contract without any additional time for option CLINs. Key points include the government’s right to award optional items unilaterally within 120 days of the initial contract award and a stipulation for a firm fixed price, with no provisions for price adjustments. The document emphasizes the importance of appropriate pricing to avoid an unbalanced bid and mandates bonding for any exercised options. The structure consists of general instructions, specific CLIN details, and notes relevant to bidders. This RFP underlines the government's commitment to expanding electric vehicle infrastructure and adhering to systematic procurement processes aligned with federal guidelines.
    This government document pertains to the amendment of a solicitation for the Newport EV Charging Stations project under Contract ID N40085. It outlines the procedures that must be followed to acknowledge receipt of the amendment prior to the specified deadline. Offers can be acknowledged either by returning specific items or through separate communication referencing the solicitation and amendment numbers. It highlights the importance of timely acknowledgment to avoid rejection of offers. The document is structured to include sections dedicated to amending the solicitation and modifying contract details. Specific details concerning the contracting authority, project number, and locations of issuing offices are provided, along with notes on the procedural requirements for submitting changes to existing offers. Notably, the acknowledgment of the amendment does not require the contractor's signature but must reach the designated receiving location on time to remain valid. This document illustrates the standard procedures and requirements for federal grant and request for proposal processes, reflecting the structured nature of government contracting.
    The document addresses an amendment to Solicitation 6021480 concerning the Newport Electric Vehicle Charging Stations project. It outlines the procedures for acknowledging receipt of the amendment, which is essential for participants to avoid potential rejection of their offers. Contractors can acknowledge the amendment through various methods, including returning specified items or through separate correspondence referencing the solicitation number. The amendment states that the proposal deadline has been extended to 12 PM ET on August 21, 2024, and indicates that the deadline for submitting Requests for Information (RFI) has passed. The document maintains the original terms and conditions of the solicitation while updating the submission timeline. Specific details such as contract ID codes, issuance offices, and facility codes are provided for clarity. Overall, the amendment serves to inform potential contractors of crucial updates regarding the proposal process for this government project.
    This document addresses inquiries related to a government project involving electric vehicle (EV) charging installations. Key points include the non-extendable RFI deadline due to fiscal constraints and the applicability of the Buy American Act. The document outlines details on the delivery timeline for transformers, specifies procedures for existing EV charger disconnections, and addresses infrastructure requirements, including electrical distribution for new chargers located at specific buildings (A9 and A63). Modifications to the project's scope include provisions for metering and the connection of new transformers to existing primary conduits, ensuring compliance with automated metering systems. Overall, the document serves as a guideline to contractors on technical specifications and requirements for participating in this government RFP initiative focused on enhancing EV infrastructure while adhering to federal regulations and fiscal timelines.
    The document outlines a Request for Proposals (RFP) for a design/build project focused on developing electric vehicle (EV) charging facilities across multiple buildings. Key aspects of the project include converting a gravel parking area into an asphalt lot at Bldg 1 and making necessary site improvements to facilitate the installation of EV charging stations at buildings A63North, A63South, and A9. The document emphasizes the design/build nature of the project, requiring contractors to adhere to federal, state, and local regulations, including resource guidelines from the Whole Building Design Guide. Specific requirements mention the provision of Level 2 dual-port ChargePoint EV charging stations, staffing arrangements for electric lighting, and stipulations against using precast concrete for transformer pads. Additionally, drainage improvements for parking areas and site restorations after EV facility installations are necessary but vary by building, with Bldg A63 requiring minimal alterations as its parking is already in place. Overall, the RFP seeks comprehensive responses that reflect adherence to established design and construction criteria while emphasizing the enhancement of EV infrastructure and related site conditions.
    The Naval Facilities Engineering Systems Command, Mid-Atlantic has issued a Request for Proposal (RFP) for the design and installation of electric vehicle charging stations at Naval Station Newport, RI. The project, under RFP ID ACQR 6021480, targets Government fleet vehicle needs and supports initiatives to reduce emissions. The selected contractor will design three facilities (Buildings 1, A63, A9) encompassing site improvements and necessary electrical infrastructure. The contract is intended for specific awarded contractors with a project magnitude estimated between $1,000,000 to $5,000,000, to be completed within 365 days of contract award. Interested parties must attend a scheduled site visit and submit proposals by August 13, 2024. Key evaluation criteria include price, with the contract awarded to the lowest evaluated price conforming to specifications. All proposals are required to meet federal guidelines, including submission of relevant certifications and bid guarantees. This solicitation emphasizes the federal government’s ongoing commitment to energy efficiency and environmental responsibility.
    The document details a site visit log for a solicitation regarding the design and installation of Electric Vehicle Charging Stations. It specifies important dates, including a site visit scheduled for July 18, 2024, a Request for Information (RFI) deadline of July 25, 2024, and a proposal submission deadline on August 13, 2024, all in Eastern Time. Interested parties must submit questions in writing via a provided email. The log includes the names and contact information of attendees from various companies, highlighting participation and interest in the project. This solicitation reflects the federal government's commitment to expanding electric vehicle infrastructure while engaging potential contractors through a structured bidding process, ensuring transparency and competition in public procurement. The document's structure succinctly outlines timelines and contact procedures, facilitating clear communication for stakeholders involved in the project.
    Lifecycle
    Title
    Type
    Similar Opportunities
    NWC B686 Conolly Hall Upgrades / NWC Modular Buildings
    Active
    Dept Of Defense
    The Department of Defense, through the NAVFACSYSCOM Mid-Atlantic office, is soliciting proposals for the NWC B686 Conolly Hall Upgrades and NWC Modular Buildings project at Naval Station Newport, Rhode Island. This Design-Bid-Build contract encompasses significant renovations to approximately 80,000 square feet of Conolly Hall, including hazardous materials abatement, mechanical, electrical, plumbing, and fire safety system installations, as well as the installation of modular buildings to support operations during the upgrades. The project is critical for enhancing safety and operational capabilities at the Naval War College, with a total duration of 1,123 calendar days, aiming for completion by September 30, 2027. Proposals are due by September 10, 2024, and interested contractors should contact Shayna Eichner at shayna.t.eichner.civ@us.navy.mil or Kristy Gerrek at kristy.l.gerrek.civ@us.navy.mil for further details.
    Construction- Building 1171 Sump Pump Emergency Generator
    Active
    Dept Of Defense
    The Department of Defense, through the Naval Undersea Warfare Center Division Newport (NUWCDIVNPT), is soliciting proposals for the construction of a sump pump emergency generator at Building 1171 in Newport, Rhode Island. This project is a total small business set-aside under NAICS code 236220, with an estimated contract value between $25,000 and $100,000, and requires contractors to provide all necessary materials, labor, and supervision for the installation, while the government will supply the generator and transfer switch. Interested contractors must submit their proposals by September 11, 2024, following a mandatory site visit on August 28, 2024, and are required to comply with federal wage standards as outlined in the Davis-Bacon Act, with the latest wage determination effective August 23, 2024. For further inquiries, interested parties can contact Jay Parker at jay.a.parker2.civ@us.navy.mil or Michael Ouellette at michael.n.ouellette.civ@us.navy.mil.
    Z--Base Operation and Support (BOS) for Facility Investment and Facility Management services at Naval Station Newport (NAVSTA), Newport, Rhode Island.
    Active
    Dept Of Defense
    Presolicitation DEPT OF DEFENSE DEPT OF THE NAVY is seeking Base Operation and Support (BOS) for Facility Investment and Facility Management services at Naval Station Newport (NAVSTA), Newport, Rhode Island. The contractor will provide labor, management, supervision, tools, material, and equipment necessary for various services including Facilities Support Services, Facility Planning and Asset Management Services, and Base Support Vehicles and Equipment. The contract will be a combination Firm-Fixed Price/Indefinite Quantity type and will be awarded to the best value offeror using tradeoff analysis. The contract will have a base period with four one-year option periods, not exceeding sixty months. The estimated proposal due date is at least 30 days after the RFP is posted on or about January 24, 2019. Contractors must register in the System for Award Management (SAM) database to be eligible for award.
    Design Build – Replace Surfaces at Nimitz Field and NAPS McCool Track, NAVAL STATION NEWPORT, NEWPORT, RI
    Active
    Dept Of Defense
    The U.S. Navy's Naval Facilities Engineering System Command (NAVFACSYSCOM) seeks experienced contractors for a local area set-aside design-build project in Newport, Rhode Island. NAVFACSYSCOM aims to transform sports facilities at Naval Station Newport, primarily the Nimitz Athletic Field and the McCool Running Track, by replacing surfaces, enhancing drainage, and installing electrical conduits. This project prioritizes environmental considerations, detailed soil management, and erosion control plans, with strict guidelines for managing disturbed soils. Contractors will undertake a comprehensive overhaul of the Nimitz Field, replacing the artificial turf, removing a manhole, and optionally extending the turf to adjacent areas. The McCool Track will also be resurfaced, and the perimeter drain system upgraded. Additionally, the project encompasses improving the long jump and pole vault surfaces, along with other track and field areas. The Navy seeks a time-efficient completion, with a design deadline by March 2025 and a construction window from mid-May to July 2025. Eligible bidders are limited to those holding Multiple Award Construction Contracts for the Newport/New London region, and a site visit is scheduled for 22 August 2024. In accordance with environmental regulations, successful contractors will implement meticulous soil management and erosion control measures. The Navy intends to award the contract based on the lowest acceptable price, with particular attention to the base bid and optional add-ons. Contact Stefan Nassaney at stefan.nassaney@navy.mil or 401-841-4443 for more information.
    Construction- Lab and Collaborative Space Reno Project
    Active
    Dept Of Defense
    The Department of Defense, through the Naval Undersea Warfare Center Division Newport (NUWCDIVNPT), is soliciting proposals for the "Lab and Collaborative Space Renovation Project," which involves renovations of various laboratories and collaboration spaces. This project is set aside for 100% small business participation and has an estimated budget ranging from $100,000 to $250,000, emphasizing the importance of enhancing operational facilities within the Navy. Interested contractors must submit their proposals electronically by September 10, 2024, and are encouraged to attend a site visit scheduled for August 7, 2024, to better understand the project requirements. For further inquiries, interested parties can contact Jay Parker at jay.a.parker2.civ@us.navy.mil or Michael Ouellette at michael.n.ouellette.civ@us.navy.mil.
    Y--ZION Construction Bus Charging Phase 3
    Active
    Interior, Department Of The
    The Department of the Interior, specifically the National Park Service, is soliciting proposals for the "ZION Construction Bus Charging Phase 3" project at Zion National Park in Utah. This initiative aims to construct electric vehicle (EV) charging stations to support a new fleet of articulated buses, enhancing visitor transportation while promoting sustainable practices. The project includes significant earthwork, installation of electrical systems, and expansion of the bus parking area, with a total contract value estimated between $1,000,000 and $5,000,000. Interested contractors must submit their proposals by the specified deadline, with a performance period of 119 days following the notice to proceed, and are encouraged to contact Rachel Dyer at racheldyer@nps.gov for further inquiries.
    61--CHARGER,BATTERY
    Active
    Dept Of Defense
    The Department of Defense, specifically the Department of the Navy through NAVSUP Weapon Systems Support Mechanicsburg, is soliciting proposals for the procurement of 37 battery chargers, identified by part number 1810853 and NSN 7HH 6130 013304036. The contract requires compliance with various federal acquisition regulations and quality assurance standards, ensuring that the chargers meet specific design and performance criteria essential for military operations. This procurement is critical for maintaining operational readiness and supporting the Navy's equipment needs. Interested vendors must submit their firm fixed price quotes by the extended deadline of August 12, 2024, and can direct inquiries to Leigh Catchings at 717-605-2864 or via email at leigh.e.catchings.civ@us.navy.mil.
    Naval Power & Energy Systems Technology Development Roadmap (NPES TDR) Update
    Active
    Dept Of Defense
    The U.S. Navy, through the Naval Sea Systems Command (NAVSEA), seeks industry insights to update its Naval Power and Energy Systems Technology Development Roadmap (NPES TDR). The goal is to align naval power systems with evolving technologies, ensuring the fleet's combat readiness. This Request for Information (RFI) is a strategic move to gather intelligence on current and emerging trends in the industry, especially those that can enhance the Navy's power and energy systems. The update aims to future-proof naval operations by fostering innovation that meets the demands of emerging loads. The Navy wants to improve the agility, efficiency, and support mechanisms of its power and energy systems, primarily through advancements in prime movers, generation, propulsion motors, distribution, conversion, controls, and thermal management. Additionally, the Sea Systems Command wants to understand industry capabilities in integration, systems engineering, modeling, simulation, and digital twins to enhance the Navy's strategic advantages. This RFI is crucial for the Navy to benchmark industry advancements, enabling them to shape their technology development and investment strategies. The information gathered will significantly influence the NPES TDR update, guiding future procurement decisions and ensuring the fleet's technological edge. Respondents are encouraged to share their insights, especially on enhancing system performance, reducing costs, and improving survivability. The RFI document is divided into three sections: General Information: Focuses on the state-of-the-art technology, industry trends, and commercial product advancements. Technology Trends: Explores advancements in functionality, power density, reliability, and scientific innovations. Product-Specific: Directed towards prime movers, propulsion motors, power generation, distribution, and more, with an emphasis on specific improvements. Industry participants are vital to this process and can shape the Navy's technological trajectory by responding to the RFI. The deadline for submissions is extended to September 19, 2024, and the Navy encourages respondents to share their expertise and insights freely. For clarification or further information, interested parties can contact Sakeena Siddiqi at sakeena.siddiqi@navy.mil or Tyler Pacak at tyler.pacak@navy.mil.
    NUWCDIVNPT Multiple Award Construction Contract (MACC)
    Active
    Dept Of Defense
    Presolicitation notice issued by the Department of Defense, Department of the Navy, NUWC DIV Newport, for a Multiple Award Construction Contract (MACC) in Newport, RI. The MACC will have a total contract period of five years and will include various projects such as roofing, renovations, HVAC, painting, paving, low impact development, environmental/hazardous material abatement, and concrete/foundation work. The contractor will be responsible for providing management, labor, materials, equipment, transportation, supervision, and security controls for maintenance, repair, and minor construction projects at NUWCDIVNPT. The estimated contract value is over $10,000,000. The procurement is a 100% small business set-aside, and the NAICS code is 236220. The RFP is expected to be released in December 2023. Potential offerors must be registered in SAM to be eligible for award. Contact information for inquiries is provided.
    59--UPS RECTIFIER
    Active
    Dept Of Defense
    The U.S. Navy is seeking proposals for a firm-fixed-price contract to supply UPS rectifiers. Meeting the specified design, material, and dimension requirements is crucial. These rectifiers are essential for ensuring uninterrupted power supply in critical applications, and the solicitation seeks a solution that aligns with the specified ordering data and technical parameters. The solicitation includes detailed instructions and technical specifications, emphasizing the precedence of specific contract sections and the need for compliance with quality assurance and packaging requirements. Offerors should note the request for pricing information attributable to data production and submission deadlines. This contract opportunity, valued at $1250, requires responses to be submitted electronically before the closing date indicated in the RFP. For more details, contact the contracting officer at the provided email or phone number: Joseph Darcy, 7176056696, JOSEPH.DARCY@NAVY.MIL.