Replace Foam Fire Suppression System with Water Deluge System
ID: FA309924R0008Type: Solicitation
Overview

Buyer

DEPT OF DEFENSEDEPT OF THE AIR FORCEFA3099 47 CONF CCLAUGHLIN AFB, TX, 78843-5101, USA

NAICS

Plumbing, Heating, and Air-Conditioning Contractors (238220)

PSC

INSTALLATION OF EQUIPMENT- FIRE CONTROL EQUIPMENT (N012)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)
Timeline
    Description

    The Department of Defense, specifically the Department of the Air Force, is soliciting proposals for the replacement of the existing Foam Fire Suppression System with a Water Deluge System at Laughlin Air Force Base, Texas. The project aims to enhance fire safety by removing the high expansion foam system and repairing the associated pump house, ensuring compliance with the Sundown Policy regarding the use of foam systems. This initiative is critical for maintaining operational readiness and safety standards in military facilities. Interested contractors must submit their proposals by the specified deadlines, with the estimated contract value ranging between $1,000,000 and $5,000,000, and a total performance period of 245 calendar days. For further inquiries, contact Alex Abram at alex.abram@us.af.mil or SSgt Katherine Wells at katherine.wells.4@us.af.mil.

    Files
    Title
    Posted
    The memorandum from the Department of the Air Force addresses an exemption to the Unified Facilities Criteria (UFC) regarding fire protection engineering for aircraft maintenance and corrosion control facilities. It outlines the implementation of the Sundown Policy, which prohibits foam-based fire suppression systems in Tier 2 facilities and allows for Ignitable Liquid Drainage Flooring Assemblies (ILDFA) in Tier 1 facilities. For Tier 1 facilities, ILDFA will replace traditional foam systems unless impractical, with additional requirements for sprinkler systems and infrared detection. For Tier 2 facilities, an automatic water sprinkler system is mandated, with similar detection specifications, focusing on fire safety. The exemption clarifies that existing projects needing modification or upgrades to foam systems must adjust their designs accordingly. The memo emphasizes caution for fire emergency responders, given the potential hazards associated with aviation fuel fires, despite their infrequency. This document aims to streamline fire protection requirements while ensuring safety standards for Air Force facilities, reflecting ongoing efforts to optimize building codes and enhance the effectiveness of fire suppression strategies.
    The Environmental Quality Construction Specifications for Laughlin Air Force Base (LAFB) outline comprehensive guidelines for all construction activities to ensure adherence to environmental compliance and protection. The specifications emphasize compliance with relevant federal, state, and local laws, including disposal protocols for hazardous materials (HM) and hazardous waste (HW). Contractors must secure approvals for HM usage, address air and water quality monitoring, and manage earth disturbances responsibly. Key sections include requirements for managing toxic substances like asbestos and lead-based paint, stipulations for immediate notification in case of spills, or the discovery of artifacts, as well as conditions for proper waste disposal both during and after construction. The document mandates restoration of disturbed areas and outlines training requirements for personnel handling HM. The overarching aim is to mitigate environmental risks while fulfilling the building requirements at LAFB, demonstrating a commitment to ecological responsibility and regulatory compliance. These specifications serve as a critical resource guiding contractors in maintaining environmental integrity throughout their projects.
    The project at Laughlin Air Force Base, Texas, involves renovations to Hangar 1 (Building 50) focused on upgrading fire suppression systems as part of the MXDP 221013 initiative. The scope includes the installation of a new fire suppression system while adhering to various safety codes, including NFPA and IBC standards. The project entails mechanical, electrical, and structural modifications, incorporating existing systems into the new framework. Key tasks include removing old equipment, patching walls, and ensuring compliance with life safety and accessibility requirements. The upgrades will enhance safety and efficiency, reflecting the government's commitment to maintaining robust facilities and operational readiness. The design incorporates comprehensive code analyses and emphasizes existing conditions, calling for the contractor to coordinate with relevant authorities and ensure minimal disruption. Overall, this project illustrates the careful integration of upgrades necessary for the facility's operational integrity and safety compliance while adhering to military standards.
    The Laughlin Air Force Base Installation Facilities Standards (IFS) document is designed to streamline facility standards for military construction and maintenance following Air Force Corporate Facilities Standards (AFCFS). It categorizes facilities into hierarchical groups, emphasizing quality, sustainability, and efficient operations tailored to the local climate. The IFS integrates various essential elements including site development, street standards, open public spaces, and ensures compliance with Department of Defense criteria. The document outlines comprehensive planning requirements, infrastructure design, and future development strategies, all aimed at enhancing the operational functionality and visual quality of the base. Key sections detail specifications for street hierarchies, traffic management, parking areas, and landscaping, while highlighting the importance of utility management and efficient drainage systems. Additionally, it covers open space planning, including plazas and recreational areas, ensuring compliance with safety standards and aesthetic values. Overall, the IFS serves as a living document facilitating consistency and adaptability in infrastructure development, maintenance practices, and compliance across Laughlin Air Force Base, reflecting the Air Force's commitment to proactive facility standards and mission success.
    The Laughlin Air Force Base (LAFB) construction project, MXDP 22-1013, entails replacing the Foam Fire Suppression System with a Water Deluge System in Building B50. The document provides a comprehensive outline of general specifications required by the contractor, including compliance with federal and local regulations, health and safety protocols, and quality control measures. Key responsibilities include providing all necessary labor, materials, and oversight to ensure project efficiency and adherence to defined scopes of work. It emphasizes the importance of planning, documentation, and communication, highlighting submission requirements for construction plans, submittals for materials, progress schedules, and safety protocols. The contractor must maintain thorough records of activities and communicate regularly with the government oversight personnel to ensure compliance and address any issues that arise during construction. Furthermore, the document sets forth stringent safety and non-compliance standards, indicating the contractor's accountability for the site and any pre-existing conditions. Overall, this specification illustrates the Air Force's commitment to executing projects that meet operational, operational safety, and regulatory requirements while fostering a collaborative environment between contractors and government personnel.
    The document outlines details for a government contract, including essential project management elements such as contract number, project title, and various dates associated with the project schedule. The starting date and completion date are set as December 30, 1899, indicating a placeholder error or data input issue. The primary focus appears to be monitoring the contract's progress through scheduled work elements and corresponding percentages, which currently show no work completed or amounts invoiced. It includes a detailed progress schedule dictating a timeline for current and future work, but all entries yield zero in terms of contracted amounts and progress percentages, suggesting that the project remains stagnant or uninitiated. The report emphasizes formal procedures for certifying progress and may serve as a basis for progress payments, although no satisfactory completion of tasks is reported. Overall, the document highlights the procedural framework for contract management within federal projects, outlining the necessary documentation to ensure compliance and track deliverables efficiently.
    The Department of the Air Force issued a memorandum outlining the Sundown Policy for Foam Fire Suppression Systems (FSS) aimed at phasing out fluorinated Aqueous Film Forming Foam (AFFF) due to safety and financial concerns. Historical data reveals no aircraft or life losses from hangar fuel-related fires in 32 years, but foam systems have caused significant mishaps, leading to over $24 million in damages and injuries. Consequently, all Department of the Air Force hangars are classified as Tier 2 facilities, mandating the use of automatic water sprinkler systems instead of foam systems. Limited use of foam FSS is allowed in critical facilities designated as Tier 1, requiring SAF/IE approval. The document details procedures for compliance, including the lockout/tagout of foam systems by March 2023, and outlines the necessary programming and design adjustments for new or existing facilities to align with the updated safety protocols. Emphasis is placed on ensuring installations adhere to fiscal accountability and prepare for funding advocacy while maintaining operational readiness. This policy reinforces the Department's commitment to safety and environmental responsibility.
    The Unified Facilities Criteria (UFC) 3-230-01 outlines the standards for water storage and distribution systems within the Department of Defense (DoD). This document provides essential requirements for the design, construction, and maintenance of potable water, fire protection, and non-potable water systems globally, adhering to federal, state, and local regulations. Key aspects include design criteria priorities, compliance with building codes, and ensuring safety through measures addressing antiterrorism and cybersecurity. Significant revisions in the current version, effective July 2021, include updates on redundancy in pumping facilities, revised fire protection criteria, and incorporation of advanced metering practices. The document emphasizes the importance of proper site analysis, selection of materials, system pressure requirements, and maintaining water quality while addressing potential environmental impacts. By establishing detailed standards and best practices, the UFC aims to ensure efficient, reliable, and secure water service systems that meet both military and civilian standards. This regulatory approach fosters compliance in government procurement projects, serving as a guide for future contractors involved in DoD water distribution initiatives.
    The Unified Facilities Criteria (UFC) 3-400-02, dated September 20, 2018, provides comprehensive guidelines for engineers regarding the use of Engineering Weather Data (EWD) in the design of government structures. This updated document supersedes prior criteria and is applicable to all service elements involved in the planning, design, and construction of Department of Defense (DoD) facilities globally. The UFC outlines procedures for accessing weather data, provides climate summaries, and specifies design values for various temperature and humidity conditions, essential for infrastructure planning and construction efficiency. It details methodologies for calculating cooling and heating degree-days and advises users on correctly interpreting and utilizing the data for equipment sizing and environmental control systems. Furthermore, it emphasizes adherence to standards set forth by ASHRAE and other industry benchmarks, ensuring consistent and reliable building performance. The document underscores the importance of utilizing accurate climate data and best practices, facilitating informed decisions in military construction projects. Overall, UFC 3-400-02 serves as a crucial resource, aligning military design practices with rigorous engineering and environmental standards.
    The Unified Facilities Criteria (UFC) document UFC 3-401-01 provides essential guidelines for mechanical engineering in Department of Defense (DoD) facilities. It outlines the minimum design, analysis, and documentation requirements for mechanical systems to promote quality, consistency, and low lifecycle costs while ensuring a safe environment. Applicable to all service elements and contractors, the criteria incorporate various mechanical disciplines such as HVAC, plumbing, and utility monitoring systems. Key points include the importance of life cycle cost analysis in system selection, maintenance considerations for mechanical equipment, and seismic design requirements. The UFC serves as a central reference, directing engineers to associated criteria and ensuring compliance with stringent standards across different military branches. It mandates a comprehensive design analysis, addressing user requirements, governing codes, site conditions, and energy sources. Supplementary information, including references and standardized conversion tables, supports project planning and execution. Ultimately, this UFC aims to enhance the efficiency and effectiveness of mechanical system designs within DoD facilities, guiding engineers in the creation of robust and sustainable infrastructure.
    The Unified Facilities Criteria (UFC) 3-410-01 outlines requirements for heating, ventilating, and air conditioning (HVAC) systems within Department of Defense (DoD) facilities. It emphasizes design consistency, integrating International Mechanical Code (IMC) guidelines, and enhancing energy efficiency through life cycle cost analysis. This update supersedes older UFCs and military handbooks, addressing evolving HVAC technologies, particularly variable refrigerant flow (VRF) systems, and regulatory standards such as the EPA's HFC refrigerant regulations. Key sections provide guidance on system selection, design protocols, and specific facility HVAC requirements, ensuring compliance with environmental standards, cybersecurity needs, and operational efficiency. The UFC serves as a living document subject to regular updates, fostering standardized practices across military projects while incorporating lessons learned from past projects. Overall, UFC 3-410-01 aims to unify HVAC design principles across military services, aligning with broader governmental construction standards to improve HVAC performance and sustainability in military facilities.
    The Unified Facilities Criteria (UFC) 3-410-02 outlines the requirements for Direct Digital Control (DDC) systems focused on HVAC and other building control systems in Department of Defense (DoD) projects. The document aims to standardize the design and implementation of open DDC systems to ensure interoperability and compatibility between multiple vendors. It emphasizes the transition from closed proprietary systems to open systems that facilitate competitive procurement and proprietary component integration while maintaining the capability for extensive control and monitoring. Key components discussed include the BACnet and LonWorks protocols, detailing their architectures and media options. The document outlines design principles for achieving commonality and compatibility among control systems across various building types, including future integration with Utility Monitoring and Control Systems (UMCS). It stipulates technical requirements for using proprietary networks under certain conditions, along with the standards for hardware and communication protocols necessary for efficient system operation. Overall, this UFC serves as a guideline for ensuring that HVAC and control systems are designed for reliability, cost-effectiveness, and adaptability in military environments, fostering better management of resources while adhering to regulatory standards.
    The Unified Facilities Criteria (UFC) document UFC 3-420-01, released on April 1, 2021, establishes guidelines for plumbing systems within Department of Defense (DoD) facilities. It supersedes a prior version and consolidates standards for plumbing design, ensuring compliance with safety, environmental, and operational requirements across military facilities. The UFC outlines criteria for various plumbing components, including water supply distribution, drainage, emergency systems, and fixtures, promoting energy efficiency and water conservation. Key points include specifications for system reliability, design requirements tailored to environmental conditions, and adherence to applicable codes. It emphasizes the importance of selecting durable materials to mitigate maintenance needs. Special provisions address safety measures, including cybersecurity protocols for control systems. The document is intended as a foundational reference for DoD construction projects, aiming to streamline plumbing design processes and enhance clarity. It reflects the government's commitment to maintaining high construction standards while accommodating operational needs and sustainability goals across all military services. This UFC serves as a critical resource for contractors and engineers involved in government projects, ensuring seamless integration of plumbing infrastructure into new and existing facilities.
    The Unified Facilities Criteria (UFC) 3-501-01 outlines mandatory electrical engineering design and analysis standards for Department of Defense (DoD) construction projects. The document specifies requirements for electrical systems in terms of planning, design, and implementation, emphasizing safety, energy efficiency, and sustainability. Key updates include environmental severity classifications, corrosion prevention measures, and guidelines for corrosive and high-humidity areas. Mandatory compliance with referenced standards and required calculations such as load analysis, short-circuit analysis, and protective device coordination is emphasized to ensure reliability and safety in electrical systems. The UFC addresses various aspects including site power distribution systems, interior electrical systems, and communication systems, ensuring coordination and integration among different engineering disciplines. By providing comprehensive guidelines and detailed requirements, UFC 3-501-01 aims to standardize electrical design practices across military installations while ensuring adherence to performance, safety, and environmental standards. This document is critical for technical compliance in government RFPs, federal grants, and state and local proposals, supporting the broader objectives of effective military infrastructure development.
    The document UFC 3-600-01 outlines fire protection engineering criteria for Department of Defense facilities, establishing minimum standards for design, construction, and operational safety. It incorporates updates from previous versions, addressing evolving requirements, such as those for specialized facilities like animal housing and lithium battery storage. Key elements include the necessity of a Qualified Fire Protection Engineer (QFPE) for major projects, thorough fire protection design analyses, and compliance with both U.S. and host nation fire safety regulations. The UFC integrates standards from the National Fire Protection Association (NFPA) and the International Building Code (IBC), ensuring that all fire protection measures prioritize life safety, mission continuity, and property protection. Additionally, the document emphasizes periodic updates to reflect new technologies and practices, demonstrating the DoD's commitment to maintaining high safety standards across its facilities. This comprehensive approach supports adherence to federal laws and facilitates effective coordination in military construction and operations.
    The Unified Facilities Criteria (UFC) 4-211-01 outlines the planning and design requirements for Aircraft Maintenance Hangars utilized by the U.S. Department of Defense (DoD). This document serves as a comprehensive guideline to promote uniformity in the construction and operation of maintenance facilities across various military branches. It encompasses general and service-specific criteria, detailing requirements for minimum clearances, structural designs, safety measures, and environmental considerations. Key specifications include provisions for aircraft operational safety, accessibility, and the integration of mechanical and fire suppression systems. The UFC emphasizes adherence to regulatory frameworks, including OSHA and DoD guidelines, particularly concerning hazardous materials and environmental impacts. Updates through multiple changes refine technical standards and establish clear guidance on space requirements, including specialized areas for heavy and light maintenance. The criteria enhance efficiency and safety, supporting the mission readiness of military aircraft. The UFC is essential for ensuring compliance with federal standards and optimizing the design and functionality of military hangars, thus facilitating effective aircraft maintenance operations across all service branches.
    The project titled "Replace Foam Fire Suppression System with Water Deluge System, B50" at Laughlin Air Force Base aims to remove the existing high expansion foam fire suppression system (HEFS) in Building 50 and replace it with a water deluge system (WDS) as per the updated Sundown Policy for Aqueous Film Forming Foam (AFFF) Systems in Department of Defense facilities. The construction encompasses approximately 37,200 square feet of the aircraft maintenance hangar and requires comprehensive demolition, installation, and repairs to ensure operational efficacy. The contractor is responsible for all materials, labor, and compliance with various specifications, including environmental guidelines and fire protection engineering standards. Additionally, the project includes options for disposing of the AFFF and rehabilitating the damaged infrastructure in the pump house. There will be two phases of notice to proceed: one for pre-construction and one for the main construction, with a total expected duration of 245 calendar days. Regular communication is mandated with progress reports, schedules, and training on operational security and safety measures. This initiative underscores the commitment to modernize fire suppression technology while adhering to critical environmental safety regulations.
    The document outlines the procedures and requirements for federal and state/local Requests for Proposals (RFPs) and grants. It emphasizes the importance of compliance with regulations and guidelines in the procurement processes for funding opportunities. Key topics include the need for organizations to provide detailed proposals that align with project objectives, demonstrate capability, and ensure efficient use of allocated funds. The content suggests that entities must adhere strictly to financial management practices, project timelines, and performance metrics. Additionally, the document highlights the significance of sustainability and community engagement in proposed projects, reflecting current government priorities. It underscores the collaborative nature of funding initiatives, encouraging partnerships among different stakeholders. Overall, the purpose is to guide applicants through the RFP process, ensuring their proposals meet the criteria for successful funding outcomes while fostering accountability and transparency in public procurement.
    The document outlines the determination and findings regarding the replacement of an existing foam fire suppression system with a water deluge system at Laughlin Air Force Base, specifically in Building 50. This project, managed under a Firm-Fixed-Price Contract, is crucial for timely completion due to potential damages associated with delays that are difficult to quantify. The contractor assumes full responsibility for the work pace, and liquidated damages, a common practice in construction contracts, will be applied to ensure timely performance without hindering competition or inflating contract prices. The calculated daily liquidated damages amount to $373.96, representing estimated administrative costs that may rise if additional delay-related expenses occur. The outlined charges are deemed fair for potential damages if the project isn't completed on schedule, indicating careful assessment to protect government interests and ensure effective contract execution.
    The document serves as a notification regarding the status of the PDF viewer, indicating that it may be unable to display the contents of a government file concerning federal government RFPs, federal grants, and state and local RFPs. While specific content related to funding opportunities or project proposals is missing, the document highlights the importance of ensuring access to relevant software for viewing detailed government documents. The message encourages users to upgrade their Adobe Reader to access the full content, showcasing a focus on facilitating information dissemination in government operations. Overall, it underscores the significance of technology in managing government communication and access to vital public resources.
    The Recovered Materials Determination form is a procurement document aimed at ensuring compliance with environmental guidelines during government procurement processes. It requires procurement originators to identify products eligible under the Environmental Protection Agency's Comprehensive Procurement Guidelines, which include recycled-content products across categories such as paper, construction, landscaping, and transportation. The form is divided into sections where users check applicable items from various categories, including products that are biopreferred according to the Department of Agriculture and energy or water-efficient products. Section II of the form verifies whether the procurement complies with the AFB Green Procurement Program, requiring certification from the procurement request originator. This process is crucial for integrating sustainability into federal purchasing, promoting the use of materials that not only support environmental objectives but also align with government regulations for grants and contracting. Overall, the document serves to streamline and standardize the process of evaluating and certifying procured materials while advancing ecological considerations in government purchasing practices.
    The Financial Institution Reference Sheet is a document required by the 47th Contracting Flight at Laughlin AFB for contractors submitting proposals. Contractors must provide a reference sheet for each financial institution where they hold accounts, which will be used to assess their responsibility during the proposal evaluation process. The sheet must include company details, a point of contact (POC), and information about the banking institution. Contractors consent to sharing account information with their banks under this form, which will be completed by the financial institution if the contractor is selected for the award. The financial institution is asked to provide specific financial data, including average monthly balances, current loans, lines of credit, any late payments or non-sufficient funds (NSF), duration with the bank, and credit rating. This reference sheet plays a critical role in evaluating the financial stability of contractors and ensuring compliance with government contracting standards and practices.
    This document outlines fire protection guidelines for nonstorage occupancies, aiming to reduce fire hazards in areas that house combustible and noncombustible materials. Defined as spaces resulting from processes rather than storage, nonstorage occupancies include industrial, office, and residential environments. Key revisions in the April 2019 update cover title changes, expanded hazard guidance, and enhanced sprinkler protection recommendations based on occupancy risk categories (HC-1 to HC-3). The guidelines recommend the use of FM Approved materials and systems, addressing sprinkler installations, water supply requirements, and specific safety measures for varied industries. The document further emphasizes the importance of understanding hazard classification for tailored fire protection strategies, underlining the need for comprehensive fire management. Additionally, it provides details on necessary sprinkler system attributes and operational guidelines critical for maintaining safety across diverse settings. This framework fosters consistency in fire prevention practices essential for securing public safety and property protection, aligning with requirements often specified in government RFPs and grants targeting enhanced facility safety.
    The "Past/Present Performance Questionnaire" is a document designed to evaluate contractors’ past work performance for federal contracting purposes. It requires details about the contractor, including name, address, contract number, project title, and performance period. The evaluation section, completed by an evaluation respondent, requires assessing various performance metrics on a scale from 1 (Unsatisfactory) to 6 (Exceptional). These metrics include project scheduling, quality control, subcontractor management, and problem resolution. Respondents must provide a narrative explanation for lower ratings and indicate if the contractor faced liquidated damages. The questionnaire is to be submitted by a specified deadline to a designated office in Florida. Overall, this document serves to ensure accountability and inform future contracting decisions within government projects, emphasizing the importance of reliable contractor performance.
    The Department of the Air Force is seeking brand name justification for sole sourcing of Monaco fire alarm receiving equipment and control panels for Laughlin Air Force Base (AFB) and its associated Global Support Units (GSUs). This request is underpinned by the existing use of Monaco systems at the fire department's dispatch center, which are integral for precise fire location reporting during emergencies. Specific features of the Monaco system, such as addressable detectors and mass notification capabilities, are critical for safeguarding facilities and ensuring effective emergency responses. Previous attempts to use allegedly compatible alarm systems have resulted in operational failures and significant costs due to replacements with Monaco systems. Therefore, the memorandum underscores the necessity of standardizing to Monaco equipment across all relevant construction projects to avoid functionality issues and maintain effective emergency management protocols. This justification highlights the Air Force's commitment to ensuring reliable systems for public safety and operational efficiency.
    The document pertains to a government Request for Proposal (RFP) for replacing the Foam Fire Suppression System in Building 50 at Laughlin Air Force Base, Texas. It outlines a 100% design specification to replace the existing high expansion foam system with an automatic water sprinkler system, adhering to safety regulations and environmental standards. The structure of the document includes various divisions of specifications essential for project execution, including fire suppression systems, HVAC, electrical systems, and quality control protocols. Key points highlight work requirements, administrative guidelines, safety protocols, existing structural conditions, and project scheduling necessities. The contractor must comply with specific work restrictions and obtain necessary permits before excavation, ensuring minimal disruption to operational activities within the already occupied premises. Moreover, it details strict criteria for the submission of project documentation, including schedules and progress reports, underscoring accountability and the preservation of previously existing structures. Overall, the project demonstrates the government’s commitment to enhancing fire safety measures while adhering to regulatory compliance and operational efficiency throughout construction activities.
    The document provides a register of submittals for the project aimed at replacing the Foam Fire Suppression System at Laughlin Air Force Base, located in Del Rio, Texas. The project is outlined under Contract No. FA8903-21-D-0039. A comprehensive list of required submissions is organized by sections, including preconstruction submittals, test reports, shop drawings, and operational and maintenance data, demonstrating due diligence in meeting regulatory and safety standards. Key submittals include construction site plans, environmental management plans, contractor quality control plans, and various certifications that ensure compliance with federal and military specifications. The document emphasizes the importance of detailed planning and documentation in facilitating the construction process, ensuring safety protocols, environmental protections, and adequate personnel qualifications. The register is crucial for managing project expectations and timelines, illustrating the government’s commitment to efficient execution while adhering to strict compliance requirements in military construction projects.
    The document outlines a solicitation (FA309924R0008) for a construction contract at Laughlin Air Force Base to replace the existing Foam Fire Suppression System with a Water Deluge System in Building 50. It includes important information such as the solicitation number, project details, funding contingencies, performance requirements, and the timeline for completion. The contractor is required to start work within 10 calendar days of receiving a notice to proceed, and they must complete the project within 245 calendar days. Contractors must also provide required performance and payment bonds and adhere to federal regulations regarding small business participation. The estimated cost range for the construction contract is between $1,000,000 and $5,000,000, with obligations contingent upon the availability of funding. There are specified requirements for submission of proposals and acknowledgment of amendments, and compliance with various federal clauses is mandated. This RFP exemplifies the federal government's structured approach to soliciting construction services while ensuring compliance with laws aimed at promoting small businesses and protecting labor rights.
    The document outlines the Statement of Work (SOW) for replacing the existing foam Fire Suppression System (FSS) with a Water Deluge System (WDS) at Building 50 of Laughlin Air Force Base, Texas. The goal is to comply with the Sundown Policy regarding the removal of Aqueous Film Forming Foam (AFFF) and to ensure the effective operation of fire protection systems throughout. The project includes the removal of the current high expansion foam system and repairs to the damaged pump house caused by previous cold weather. The scope of work requires the contractor to provide all necessary materials and labor, follow detailed construction documents, and engage a Qualified Fire Protection Engineer. Construction will involve extensive site evaluations, removal of hazardous materials, rehabilitation of existing systems, and compliance with environmental regulations. Additionally, the project has two phases for the Notice to Proceed, involving pre-construction and construction submittals, with performance deadlines set at 63 and 182 calendar days, respectively. The contractor must maintain communication through regular meetings and progress reports to ensure alignment with the government’s expectations. This initiative represents a critical effort by the Department of Defense to modernize fire suppression capabilities in line with safety and environmental standards.
    Lifecycle
    Title
    Type
    Similar Opportunities
    Firefighting Foam Trailer
    Active
    Dept Of Defense
    The Department of Defense, through the 82d Contracting Squadron at Sheppard Air Force Base in Texas, is soliciting proposals for a 1000-gallon firefighting foam trailer under solicitation number FA302024Q0112. The procurement aims to enhance firefighting capabilities by acquiring a trailer that meets specific technical specifications, including a robust construction and operational features necessary for effective emergency response. This acquisition is exclusively set aside for small businesses, with proposals due by September 18, 2024, at 2:00 PM CST, and all quotes must remain valid through September 30, 2024. Interested vendors should direct their inquiries to Cole Jones or Ryan Kulpa via email, as funding for this contract is not currently available, and the government reserves the right to cancel the solicitation without obligation to reimburse vendors.
    Repair Fire Protection Tech Training, Multi Facilities project located at Sheppard AFB, Texas
    Active
    Dept Of Defense
    The Department of Defense, specifically the Department of the Army, is soliciting proposals for the Repair Fire Protection Tech Training project at Sheppard Air Force Base in Texas. This procurement aims to address the repair and alteration of multiple facilities, utilizing a Two-Step Sealed Bidding method as outlined in FAR Part 14.5, with the first step focusing solely on technical proposals. The project is significant, with a construction magnitude estimated between $10 million and $25 million, and falls under the NAICS code 236220 for Commercial and Institutional Building Construction. Interested parties can reach out to Lindsey Byfield at lindsey.m.byfield@usace.army.mil or call 918-669-7070 for further details.
    MDG Building 383 Ambulance Bay Enclosure
    Active
    Dept Of Defense
    The Department of Defense, specifically the Department of the Air Force, is soliciting proposals for the construction of an Ambulance Bay Enclosure at Building 383, Laughlin Air Force Base in Texas. The project entails providing all necessary labor, materials, and supervision to enclose the ambulance bay, adhering to specified architectural plans and federal guidelines, with a total performance period of 75 calendar days divided into two phases. This construction is critical for enhancing emergency medical response capabilities at the base, ensuring compliance with safety and operational standards. Interested small businesses must submit their proposals by September 17, 2024, and can contact Joshua Centilli at joshua.centilli@us.af.mil or Rebecca Pelayo Ruelas at rebecca.pelayoruelas@us.af.mil for further details.
    Install Overhead Protection for K9 Training Area
    Active
    Dept Of Defense
    The Department of Defense, specifically the Department of the Air Force, is soliciting proposals for the installation of overhead protection at the K9 training area located at Laughlin Air Force Base in Texas. The project aims to enhance the safety and operational efficiency of K9 training by providing shade and preventing overheating of turf and equipment, with work including the installation of footings, lightning protection, and a structure to support metal panel roofing. This design-build contract has an estimated budget between $500,000 and $1,000,000, with a total performance period of 312 calendar days, divided into three phases. Interested contractors, particularly those certified as HUBZone small businesses, should contact Hayley Fenstermaker at hayley.fenstermaker.1@us.af.mil or SSgt. Eric Meshako at eric.meshako@us.af.mil for further details, and must be registered in the System for Award Management (SAM) to be eligible for award.
    Laughlin AFB Sunshade Hail Screens CSO
    Active
    Dept Of Defense
    Solicitation DEPT OF DEFENSE is seeking proposals for the design and installation of hail screens on existing aircraft structures at Laughlin AFB, TX. Laughlin AFB, located six miles east of Del Rio, TX, has approximately 213 aircraft parked on the flight line apron. The hail screens are needed to protect the aircraft during significant weather events. Interested parties can submit proposals for a single sunshade structure bay or all the sunshade structures on base. The selected contractor will be responsible for providing system engineering, technical, installation, and supervision services for the 47th FTW Maintenance Directorate (47 MX) on designing and installing hail screens for T-1 and T-6 sunshade structures. The contractor must provide all necessary materials, labor, tools, equipment, transportation, and other incidentals. This competitive solicitation is open until January 11, 2025, with the possibility of extension by amendment.
    42--FOAM LIQUID,FIRE EX
    Active
    Dept Of Defense
    The Department of Defense, through the Defense Logistics Agency (DLA Troop Support), is seeking quotes for the procurement of 120 units of Foam Liquid Fire Extinguishing Agent, identified by NSN 4210016686221. This solicitation is a qualified products list (QPL) item, emphasizing the importance of compliance with military specifications and standards for effective fire safety operations. Interested vendors must submit their quotes electronically, as hard copies of the solicitation will not be available, and the deadline for delivery is set for 46 days after order placement. For inquiries, potential bidders can reach out via email to DibbsBSM@dla.mil.
    FA487724R0020 - Upgrade PGS Fire System
    Active
    Dept Of Defense
    The Department of Defense, specifically the Department of the Air Force, is soliciting proposals for the upgrade of the PGS Fire Suppression System at Davis-Monthan Air Force Base in Tucson, Arizona. The project entails designing, planning, and installing a new fire suppression system to replace the existing end-of-life system in the 610 CACS Power Generation Shelter, while maintaining the current control system and minimizing unnecessary replacements. This procurement is particularly significant as it aims to enhance safety and compliance with environmental standards, ensuring the new system utilizes easily rechargeable clean agents. Interested contractors, especially those certified as Women-Owned Small Businesses (WOSB), must submit their proposals by September 16, 2024, following a site visit scheduled for August 26, 2024. For further inquiries, potential bidders can contact Hans Gabriel at hansyuri.gabriel@us.af.mil or Joshua Drawdy at joshua.drawdy.2@us.af.mil.
    Kitchen Hoods & Fire Suppression System Inspection, Repair, & Maintenance (Service)
    Active
    Dept Of Defense
    The Department of Defense, specifically the Department of the Air Force, is seeking qualified contractors for the inspection, repair, and maintenance of kitchen hoods and fire suppression systems at F.E. Warren Air Force Base in Wyoming and associated Missile Alert Facilities. The procurement requires contractors to provide all necessary personnel, equipment, and services for semi-annual inspections, maintenance, and emergency repairs, ensuring compliance with applicable standards and regulations. This initiative is crucial for maintaining operational readiness and safety within military facilities, emphasizing the importance of effective fire suppression systems. Interested parties must submit their written quotations by October 15, 2024, with inquiries directed to Halle Schaneman at halle.schaneman@us.af.mil or Arthur W. Makekau at arthur.makekau@us.af.mil, and must be registered in the System for Award Management (SAM) prior to contract award.
    Repair Tech Training Officer Dorm B700 & B709 at Goodfellow AFB, TX
    Active
    Dept Of Defense
    The Department of Defense, through the Department of the Air Force, is conducting market research for a Sources Sought Announcement regarding the repair and renovation of the Technical Training Officer Dormitories (B700 and B709) at Goodfellow Air Force Base in Texas. The project involves comprehensive renovations of Dormitory B700, including upgrades to mechanical, plumbing, and electrical systems, as well as roofing and fire safety improvements, with B709 serving to support these systems. This opportunity is significant for small businesses, as the anticipated contract value ranges from $10 million to $25 million, with a performance period of 730 days, extendable to 760 days if options are exercised. Interested contractors are encouraged to express their interest by emailing Jason C. Aronce or John M. Hebdon by September 19, 2024, and should monitor the SAM.GOV website for further updates.
    Fire Suppression System
    Active
    Dept Of Defense
    The Department of Defense, specifically the Department of the Air Force, is seeking qualified small businesses to provide fire suppression services at Malmstrom Air Force Base (MAFB) in Montana. The procurement involves the annual inspection and maintenance of 266 portable fire extinguishers and bi-annual inspection, testing, maintenance, and recertification of 30 wet/dry chemical fire extinguishing systems, with a contract duration spanning one base year plus four optional years from October 1, 2024, to September 30, 2029. This initiative is crucial for ensuring the safety and compliance of fire protection measures at military installations. Interested contractors must submit their quotes by 2:00 PM MT on September 25, 2024, and direct any inquiries to the designated contacts, Lt. Randolph Foote and Viviana Castillo Ramirez, via the provided email addresses or phone numbers.