ContractSolicitationTotal Small Business Set-Aside (FAR 19.5)

Stockbridge Parking Area and Roads

DEPT OF DEFENSE FA875126Q0007
Response Deadline
Jun 4, 2026
15 days left
Days Remaining
15
Until deadline
Set-Aside
Total Small Business Set-Aside (FAR 19.5)
Notice Type
Solicitation

Contract Opportunity Analysis

The Department of the Air Force, through AFRL RIKO, is seeking a small-business contractor to construct gravel parking area and roadway improvements at the Stockbridge test site. The work calls for furnishing all labor, equipment, and materials to build an 8-inch gravel parking pad for 20 cars and two 8-inch gravel road sections, with an option for an additional 110-by-40-foot parking pad. The scope includes stripping topsoil, installing geotextile, placing NYSDOT base or subbase course, shaping shoulders and slopes, verifying utilities, providing required submittals and schedules, and restoring disturbed areas, with work performed during duty hours and subject to installation access and safety controls. The solicitation uses price and past performance as evaluation factors, with past performance significantly more important than price, and the response date is June 4, 2026 at 3:00 PM local time with offers emailed to Larry Barto.

Classification Codes

NAICS Code
237310
Highway, Street, and Bridge Construction
PSC Code
Y1LB
CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS

Solicitation Documents

9 Files
Attachment 3 - WHXP240414 DRAWINGS Rev1.pdf
PDF1965 KBMay 20, 2026
AI Summary
The project WHXP240414 focuses on constructing a parking area and upgrading roads at the Stockbridge Testing Annex, part of the U.S. Air Force Research Laboratory, Information Directorate, in Rome, NY. The work involves creating a gravel parking pad (Pad 22) and improving the Pad 22 Access and UVECT Drive roads. Key aspects include stripping topsoil, installing geotextile fabric (US Fabrics US 200 or equivalent), and laying an 8-inch compacted depth of NYSDOT Type 2 base course, with 15-inch shoulders at a 1:3 maximum slope around the parking pad. Construction must adhere to New York State Department of Environmental Conservation, Department of Transportation, and local utility authority standards. Contractors are required to verify dimensions and utility locations, protect existing lawn and gravel drives, and manage site drainage, erosion, and sedimentation. Special attention is given to avoiding and protecting existing utilities, stone walls, and potential archeological discoveries. The project emphasizes adherence to detailed construction sequences and material specifications, ensuring environmental protection and structural integrity.
Attachment 1 - WXHP240414 SOW Rev1.pdf
PDF230 KBMay 20, 2026
AI Summary
The Statement of Work outlines the construction of a new 8-inch-deep gravel parking pad for 20 cars and two new sections of 8-inch-deep gravel road at the Stockbridge testing annex. The project requires furnishing all labor, equipment, and materials, including a bid option for an additional 110’ x 40’ parking pad. Key requirements include completing an Air Force Form 103, verifying underground utilities, and submitting a construction schedule. Work must be performed during duty hours, with non-duty hours coordinated with RRS Security Forces. Specifics for gravel pad/road construction include stripping topsoil, installing geotextile (US Fabrics US 200 or equal, meeting NYSDOT Class 1), and an 8-inch compacted depth of NYSDOT item 304.12 Subbase course. Parking pads will have 15-inch shoulders with a 1:3 slope. Restoration involves protecting existing surfaces, removing debris, and installing topsoil with guaranteed seed growth for one year. Material submittals include supplier certifications for subbase course, manufacturer data sheets for geotextile, and Safety Data Sheets (SDS).
Solicitation Amendment FA875126Q00070001 SF 30.pdf
PDF413 KBMay 20, 2026
AI Summary
Amendment 0001 to Solicitation FA875126Q0007, effective May 20, 2026, modifies the original solicitation dated May 1, 2026. Issued by FA8751 AFRL RIKO, this amendment revises the Statement of Work (SOW) and drawings to May 19, 2026, and adds a new Proposal Option CLIN 0002 for an additional 110' x 40' parking pad west of the primary area. The contractor is responsible for furnishing all labor, equipment, and materials to construct gravel parking and roadways at the Stockbridge Test Site. The amendment details inspection, acceptance, and delivery information for the new line item, specifying a 45-calendar-day completion period from the Notice to Proceed. Attachments for the SOW and drawings, both revised to May 19, 2026, are updated and associated with both line items.
Solicitation Amendment - FA875126Q00070001.pdf
PDF589 KBMay 20, 2026
AI Summary
This government solicitation, FA875126Q00070001, issued on May 1, 2026, is a 100% Small Business Set-Aside Request for Proposal (RFP) for the construction of gravel parking areas and roadways at the Stockbridge Test Site in Stockbridge, NY. The project, with NAICS code 237310 ($45,000,000 size standard), requires contractors to provide all labor, equipment, and materials, with an anticipated performance period of 45 calendar days after the Notice to Proceed. Offers are due by June 4, 2026, at 3:00 PM local time. Key requirements include performance and payment bonds, adherence to specific technical specifications and drawings, and compliance with various federal and local regulations. The solicitation also details provisions for electronic invoicing via Wide Area WorkFlow (WAWF), health and safety on government installations, contractor access protocols, and Cybersecurity Maturity Model Certification (CMMC) Level 1 (Self) requirements for information systems.
Solicitation - FA875126Q0007.pdf
PDF569 KBMay 20, 2026
AI Summary
This is a Request for Proposal (RFP) FA875126Q0007, issued by FA8751 AFRL RIKO on May 1, 2026, for the construction of gravel parking areas and roadways at the Stockbridge Test Site in Stockbridge, NY. This is a 100% Small Business Set-Aside with NAICS code 237310 and a $45,000,000 size standard. The contractor must provide all labor, equipment, and materials, with a performance period of 45 calendar days after receiving a Notice to Proceed. Offers are due by June 4, 2026, at 3:00 PM local time. Key requirements include compliance with health and safety standards, obtaining base access credentials, and adherence to Cybersecurity Maturity Model Certification (CMMC) Level 1 (Self) for information systems. The evaluation will prioritize past performance, which is significantly more important than price.
Attachment 4 - WD 2015-4163 Rev 31 - 3 Dec 25.pdf
PDF73 KBMay 20, 2026
AI Summary
This government file, Wage Determination No. 2015-4163, Revision No. 31, issued by the U.S. Department of Labor, establishes minimum wage rates and fringe benefits for service contract employees in Madison, Onondaga, and Oswego Counties, New York. It outlines specific hourly rates for various administrative, automotive, food service, healthcare, information technology, and other occupations. The determination also details fringe benefits, including health and welfare payments, paid vacation based on years of service, and twelve paid holidays annually. Additionally, it addresses compliance with Executive Orders 13706 (Paid Sick Leave for Federal Contractors) and 13658 (Establishing a Minimum Wage for Contractors) and provides guidelines for hazardous pay differentials and uniform allowances. The document also includes procedures for conforming unlisted job classifications and wage rates using Standard Form 1444.
Attachment 3 - WHXP240414 DRAWINGS.pdf
PDF14284 KBMay 20, 2026
AI Summary
The U.S. Air Force Research Laboratory's Information Directorate in Rome, NY, is undertaking Project No. WHXP240414 to construct a new parking area at the Stockbridge site. This project involves civil engineering, programming, and general construction, including the installation of a gravel parking pad, road upgrades for Pad 22 and Uvect Drive, and adherence to specific site grading, drainage, and erosion control measures. Key requirements include stripping topsoil, installing geotextile fabric and NYSDOT Type 2 base course, and ensuring proper compaction and shoulder slopes. The contractor must verify all existing conditions, avoid disturbing stone walls or archaeological areas, and utilize ground-penetrating radar for utility verification. All work must comply with New York State Department of Environmental Conservation, Department of Transportation, and local utility authority standards. Project management is led by P. Fitzgerald, with an estimated publication date of March 4, 2025.
Attachment 2 - WHXP240414 Specifications.pdf
PDF696 KBMay 20, 2026
AI Summary
The document outlines the technical specifications for constructing a gravel parking pad and access roads at the Air Force Research Laboratory – Stockbridge Testing Annex. This project, WHXPF240414, involves building an 8-inch-deep gravel parking pad for 20 cars and two connecting gravel road sections. Key requirements include adherence to Green Procurement Guidelines, strict working hours, and comprehensive security measures due to the Department of Defense Police presence. Contractors must comply with all Federal, Air Force, and State safety regulations, obtain excavation permits, and schedule utility interruptions with prior approval. Detailed submittals for materials are mandatory, and hazardous materials management follows stringent Air Force and EPA regulations, including authorization and tracking. Earthwork specifications cover site grading, material classification, and proper disposal of excavated materials. The project also mandates the installation of buried warning and detection tapes for utilities and outlines specific backfilling and compaction requirements. Overall, the document emphasizes safety, environmental protection, and regulatory compliance throughout the construction process.
Attachment 1 - WXHP240414 SOW.pdf
PDF489 KBMay 20, 2026
AI Summary
The Statement of Work (SOW) outlines the requirements for constructing a new 8-inch-deep gravel parking pad for 20 cars and two new sections of 8-inch-deep gravel road at the Stockbridge testing annex, located east of building 1426 on the Stockbridge airfield. The project, designated WHXP240414 and dated March 19, 2025, requires furnishing all labor, equipment, and materials. Key tasks include stripping topsoil, installing geotextile (US Fabrics US 200 or equal, meeting NYSDOT Class 1), and an 8-inch compacted depth of NYSDOT item 304.12 Subbase course. The parking pad must include 15-inch shoulders with a maximum 1:3 slope. Contractors must complete an Air Force Form 103, Base Civil Engineering Work Clearance Request, verify existing underground utilities, and submit a construction schedule for AFRL Civil Engineering approval. Work is primarily Monday through Friday, 0600 to 1800, with non-duty hours requiring coordination with RRS Security Forces. Restoration and clean-up include protecting existing surfaces, removing all debris and materials at least 80 feet from structures, and installing topsoil and seeding all disturbed lawn areas with a one-year growth guarantee. Material submittals include NYSDOT-approved supplier certification for subbase course, manufacturer's data sheets for geotextile, and Safety Data Sheets (SDS).

Related Contract Opportunities

Project Timeline

postedOriginal Solicitation PostedMay 1, 2026
amendedLatest Amendment· Description UpdatedMay 20, 2026
deadlineResponse DeadlineJun 4, 2026
expiryArchive DateJun 19, 2026

Agency Information

Department
DEPT OF DEFENSE
Sub-Tier
DEPT OF THE AIR FORCE
Office
FA8751 AFRL RIKO

Point of Contact

Name
Larry Barto

Place of Performance

Oneida, New York, UNITED STATES

Official Sources