ContractSolicitationService-Disabled Veteran-Owned Small Business Set Aside

Golden Gate Shrine 895-NS-FY26-001

DEPARTMENT OF VETERANS AFFAIRS 36C78626B0024_1
Response Deadline
Jun 26, 2026
35 days left
Days Remaining
35
Until deadline
Set-Aside
Service-Disabled Veteran-Owned Small Business Set Aside
Notice Type
Solicitation

Contract Opportunity Analysis

The Department of Veterans Affairs, through the National Cemetery Administration, is soliciting a service-disabled veteran-owned small business contract for the Golden Gate National Cemetery National Shrine Project in San Bruno, California. The work covers comprehensive renovation of burial sections, including surveying, grading, drainage, excavation, backfill, headstone and marker removal and reinstallation, cleaning, headstone support system work, and turf renovation and restoration. The project is structured as a firm-fixed-price award with a 100% SDVOSB set-aside, a 365-day performance period for the base work, and a base bid plus options for additional sections. Bids are due June 28, 2026, at 2:00 PM EST by email to Michael.Giaquinto2@va.gov, with a site visit scheduled for May 30, 2026, questions due May 7, 2026, and a bid bond required.

Classification Codes

NAICS Code
238910
Site Preparation Contractors
PSC Code
Y1PZ
CONSTRUCTION OF OTHER NON-BUILDING FACILITIES

Solicitation Documents

10 Files
Attachment 3 - Contract Discrepancy Report - Copy.pdf
PDF112 KBMay 22, 2026
AI Summary
The Golden Gate National Cemetery National Shrine Project – FY26 (Project No.: 895-NS-FY26-001) in San Bruno, CA, utilizes a detailed Contract Discrepancy Report (CDR) as Attachment 3. This report serves as a formal mechanism for identifying, documenting, and resolving issues or problems that arise during the contract's execution. It outlines sections for reporting discrepancies, including contractor and government responses, corrective actions, and preventative measures. The CDR also covers government evaluation and subsequent actions, such as reduced payment or cure notices, culminating in a close-out process involving notification to the contractor, COR, and CO. This structured approach ensures accountability and effective resolution of contractual issues within the federal project.
36C78626B0024 Golden Gate Shrine IFB.docx
Word303 KBMay 22, 2026
AI Summary
The Department of Veterans Affairs (VA) is soliciting bids for the National Shrine Project at Golden Gate National Cemetery, a 100% Service-Disabled Veteran Owned Small Business (SDVOSB) set-aside. The project, valued between $2 million and $5 million, involves full section renovation, including site surveying, grading, vegetation removal, headstone re-installation, and turf renovation, with a 365-day performance period. Bids are due by June 28, 2026, at 2:00 PM EST via email to Michael.Giaquinto2@va.gov, requiring a bid bond and other specific documents. A site visit is scheduled for May 30, 2026, and questions are due by May 7, 2026. The contract will be a Firm-Fixed-Price award based on the lowest fair and reasonable price, with strict adherence to Buy American requirements, CPARS reporting, and electronic invoicing through Tungsten Network.
Wage Determination.pdf
PDF24252 KBMay 22, 2026
AI Summary
The General Decision Number CA20260018, effective January 30, 2026, outlines prevailing wage rates and fringe benefits for various construction trades across 17 counties in California, including Alameda, Contra Costa, San Francisco, and Santa Clara. This comprehensive document covers Building, Heavy (excluding hopper dredging and water well drilling), and Highway construction projects. It details wage rates for trades such as Asbestos Removal Workers, Boilermakers, Bricklayers, Carpenters, Electricians, Elevator Mechanics, Operating Engineers, Ironworkers, and Laborers, often differentiating rates by specific areas or zones within the listed counties. The decision also includes classifications and premium pay for specialized work like diving, tunnel construction, and hazardous material handling. Importantly, it provides detailed scope of work descriptions for electrical and communications system installers, along with footnotes regarding fire alarm work and specific working conditions. The document is regularly modified, with four updates in January 2026 alone, highlighting its dynamic nature in reflecting current wage determinations.
Attachment 2 - Contract Performance n Quality Assurance Report - Copy.pdf
PDF245 KBMay 22, 2026
AI Summary
The Golden Gate National Cemetery National Shrine Project – FY26, Project No. 895-NS-FY26-001 in San Bruno, CA, outlines contract performance and quality assurance reports for three key areas: compaction testing, headstone renovation, and turf renovation. The first report details requirements for compaction testing of subgrade, aggregate base, and amended topsoil, specifying maximum dry densities and testing frequencies. The second report focuses on the renovation and re-establishment of headstones, including grave plotting, marker removal, subgrade preparation, installation of support systems, and marker cleaning, with emphasis on alignment and proper placement. The third report addresses turf renovation by sod, covering soil testing, herbicide applications, debris removal, irrigation system protection and re-installation, topsoil application, grading, and sod installation. All reports include sections to document deficiencies and corrective actions, requiring signatures from both the COR and the contractor.
Attachment 1 - Work Summary n Progress Report - Copy.pdf
PDF199 KBMay 22, 2026
AI Summary
The Golden Gate National Cemetery's FY26 National Shrine Project (Project No.: 895-NS-FY26-001) in San Bruno, CA, involves a comprehensive renovation of cemetery sections, including marker raise and realignment. This Work Summary & Progress Report details the scope of work for Base Bid and Options 1, 2, and 3. Key tasks include compaction testing (total, soil, and base), granite marker setting, alignment, and backfill, marker headstone removal and replacement, marker cleaning, agricultural soil testing, and turf renovation. The document outlines the government's right to inspect and require re-performance of nonconforming services. It also provides sections for reporting adverse conditions affecting progress and requires signatures from both the contractor and the Cemetery Director/COR upon completion of services.
Attachment 5 - Daily Headstone-Marker Raise n Realign Verification Survey - Copy.pdf
PDF117 KBMay 22, 2026
AI Summary
The Golden Gate National Cemetery's National Shrine Project – FY26 (Project No.: 895-NS-FY26-001) in San Bruno, CA, requires a Daily Headstone/Marker Raise & Realign Verification Survey. This attachment outlines the mandatory re-verification process for all completed headstone/marker work. Prior to the end of each workday, the Cemetery Director, COR, Foreman, Work Leader, or designee must use the original Burial Register Report and Gravesite Layout Map to re-verify all headstones and markers. The form requires documentation of sections, headstones/markers raised and realigned, and any discrepancies or issues, including their resolution status. Unresolved issues must be reported to the District Office Director and Contracting Officer. A signature certifies the completion of this daily re-verification survey, ensuring accountability and accuracy in the project.
Attachment 7 - Contractors Employee Statement of Compliance - Copy.pdf
PDF126 KBMay 22, 2026
AI Summary
The Golden Gate National Cemetery's National Shrine Project – FY26 requires all contractor employees to sign a Statement of Compliance, acknowledging their understanding and agreement to adhere to strict guidelines for maintaining the cemetery's status as a National Shrine. This statement covers crucial aspects such as respecting interred remains, headstones, markers, and monuments by not walking, standing, or placing items on them. Employees must use approved tools and methods for handling headstones, store them carefully, and understand the contractor's responsibility for any damage to headstones or turf. Furthermore, the statement mandates immediate notification to cemetery officials in case of exposure or damage to remains, requiring work stoppage until further guidance. This annual compliance statement, due by November 1st or immediately after Notice to Proceed (NTP), covers the period from October 1st to September 30th of the following year, ensuring continuous adherence to these sacred site preservation protocols.
Attachment 6 - Herbicide Application Data Sheet - Copy.pdf
PDF117 KBMay 22, 2026
AI Summary
The
895-GGNC-NS-FY26-001 -SOW (Base plus Option 1) - Rev 1.docx
Word149 KBMay 22, 2026
AI Summary
The Golden Gate National Cemetery's National Shrine Project for FY26 in San Bruno, CA, is an RFP for comprehensive renovation of burial sections. The project includes headstone support system construction, removal, and replacement, site surveying, grading, drainage, excavation, backfill, marker handling, re-installation, cleaning, turf renovation, and site restoration. Work will be performed in sections E, F, I, and M as a base bid, with option for section Q, over 365 calendar days for the base bid and 120 days for the option. Key aspects include strict adherence to appearance standards, a professional land surveyor for site assessment, and a joint gravesite verification process with the COR. Contractor responsibilities encompass providing all resources, adhering to strict work schedules, maintaining decorum, and ensuring safety and environmental protection. Regular meetings, detailed work plans, and quality control are mandatory. The contractor must protect existing utilities and vegetation, clean up daily, and dispose of waste properly. The project emphasizes maintaining the cemetery's dignity as a national shrine.
Attachment 4 - Initial Headstone-Marker Raise and Realign Verification Survey - Copy.pdf
PDF112 KBMay 22, 2026
AI Summary
The Golden Gate National Cemetery's National Shrine Project – FY26 (Project No.: 895-NS-FY26-001) in San Bruno, CA, requires a rigorous verification process for headstone and marker raise and realignment. Attachment 4 outlines the

Related Contract Opportunities

Project Timeline

postedOriginal Solicitation PostedMay 22, 2026
amendedLatest Amendment· Description UpdatedMay 22, 2026
deadlineResponse DeadlineJun 26, 2026
expiryArchive DateJul 11, 2026

Agency Information

Department
DEPARTMENT OF VETERANS AFFAIRS
Sub-Tier
VETERANS AFFAIRS, DEPARTMENT OF
Office
NATIONAL CEMETERY ADMIN (36C786)

Point of Contact

Name
MICHAEL GIAQUINTO

Place of Performance

San Bruno, California, UNITED STATES

Official Sources