ContractSolicitationTotal Small Business Set-Aside (FAR 19.5)

Bldg. 391 Roof Replacement

DEPT OF DEFENSE W50S6M-25-B-A012
Response Deadline
Sep 9, 2025
Deadline passed
Days Remaining
0
Closed
Set-Aside
Total Small Business Set-Aside (FAR 19.5)
Notice Type
Solicitation

Contract Opportunity Analysis

The Department of Defense, specifically the 117th Air Refueling Wing, is soliciting bids for the replacement of the roof at Building 391, Dining Facility, located at Sumpter Smith Joint National Guard Base in Birmingham, Alabama. The project entails the complete removal of the existing 12,502 sq/ft roofing system, including shingles and underlayment, and the installation of a new metal roof, with a contract duration of 120 calendar days following the Notice to Proceed. This opportunity is a total small business set-aside, with an estimated project magnitude between $500,000 and $1,000,000, and bids are due by September 9, 2025, at 2:00 PM CDT. Interested contractors should contact William K. Hall at william.hall.65@us.af.mil or Jonathan Werkmeister at jonathan.werkmeister@us.af.mil for further information and must be registered in the System for Award Management (SAM) to participate.

Classification Codes

NAICS Code
236220
Commercial and Institutional Building Construction
PSC Code
Z2FD
REPAIR OR ALTERATION OF DINING FACILITIES

Solicitation Documents

9 Files
Solicitation - W50S6M25BA012.pdf
PDF66240 KBSep 10, 2025
AI Summary
This document is a solicitation for bids for the replacement of the roof at Building 391, Dining Facility, located in Birmingham, Alabama, for the 117th Air Refueling Wing. The project, identified as BRKR25005, involves the complete removal of the existing 12,502 sq/ft roofing system, including shingles and underlayment, replacement of compromised decking, and installation of a new metal roof. The estimated project magnitude is between $500,000 and $1,000,000. This is a 100% small business set-aside award, with the North American Industry Classification System (NAICS) code 236220 and a small business size standard of $45,000,000. Bids are due by September 9, 2025, at 2:00 PM local time. The contractor must begin performance within 30 calendar days and complete the work within 120 calendar days after receiving notice to proceed. Award will be based on price and price-related factors, contingent on the availability of appropriated funds.
Statement of Work Bldg. 391.pdf
PDF576 KBSep 10, 2025
AI Summary
The Statement of Work outlines a comprehensive roof replacement project for Bldg. 391 Dining Facility at 117th ARW Sumpter Smith Joint National Guard Base, Alabama. The project involves complete removal of the existing 12,502 sq/ft roofing system, including compromised deck, and installation of a new metal roof. Key steps include a mandatory site survey, careful roof removal with debris disposal, repair/replacement of the roof deck with OSB sheathing, and installation of a new metal roofing system with proper flashing and sealing. The contractor is responsible for providing labor, materials, equipment, obtaining necessary permits, and adhering to all applicable codes and regulations, including specific military guidelines (ANGETL, ANG Handbook, United Facilities Criteria). The document also details contractor responsibilities regarding submittals, material approvals, quality assurance, hazardous materials, payment terms, and strict security and antiterrorism awareness requirements. The entire project must be completed within 120 days.
Request for Information 21 Aug.docx
Word50 KBSep 10, 2025
AI Summary
The document addresses questions regarding material specifications for a Department of the Air Force roofing project at Sumpter Smith Joint National Guard Base. The key takeaway is that all roofing and gutter system materials must adhere to UFGS; Division 7- Thermal and Moisture Protection, Part 2.1.2 Steel Sheet Panels, with a Colonial Red color. The contractor is responsible for replacing the existing gutter system, ensuring the new gutters match the specified roofing materials and color. This guidance clarifies material requirements and contractor responsibilities for the project.
PreBid Bldg 391.pptx
PowerPoint384 KBSep 10, 2025
AI Summary
The 117th Air Refueling Wing is soliciting bids for the Building 391 Roof Replacement project, with an estimated cost between $500,000 and $1,000,000. Proposals are due by 2:00 PM CDT on September 9, 2025, to be submitted to the 117th ARW Base Contracting office in Birmingham, AL. Key requirements include proper signatures, a bid guarantee, and performance and payment bonds upon award. The project has a 120-day performance period, with Davis Bacon Wage Rates applicable. All questions must be submitted in writing by 9:00 AM CDT on August 29, 2025, to the provided email addresses, and answers will be posted on sam.gov. The awarded contract will be a Firm Fixed Price. Site visits require government approval for photos and an escort for all contractors.
Request for Information 27 Aug.docx
Word53 KBSep 10, 2025
AI Summary
The Department of the Air Force, 117th Air Refueling Wing (AMC), has issued answers to questions regarding material specifications for a roofing project. The project requires contractors to follow UFGS Division 7-Thermal and Moisture Protection, Part 2.1.2 Steel Sheet Panels, in Colonial Red for roofing, gutter systems, and related components. The government will not provide additional color information or as-built drawings. Bids can be mailed to the provided address. Detailed specifications for roof-edge drainage systems, including gutters, downspouts, and premanufactured roof curbs, are outlined. Gutters must be zinc-coated steel, 4-1/2 inches deep by 6 inches wide, with factory-mitered corners. Downspouts are to be 2x3 inch zinc-coated steel with a three-coat fluoropolymer finish in a color matching the approved roofing. Roof curbs must be a minimum of 18-gauge zinc-coated steel, 8 inches high, with integral base plates and water diverter crickets, conforming to the roof panel's slope and configuration. All materials and finishes must comply with ASTM A653/A653M, G90 coating, and NAAMM's "Metal Finishes Manual," with a fluoropolymer two-coat system for exposed surfaces.
Request for Information 28 Aug.docx
Word55 KBSep 10, 2025
AI Summary
The Department of the Air Force's 117th Air Refueling Wing has issued a series of Q&A responses regarding a metal roofing system project. Key specifications for the project include following UFGS Division 7-Thermal and Moisture Protection, Part 2.1.2 Steel Sheet Panels, with a Colonial Red color, for roofing, gutters, and drip edge flashing. The contractor is responsible for replacing the existing gutter system with new gutters that are a minimum of 4-1/2 inches deep by 6 inches wide, made of nominal 0.034-inch thick zinc-coated steel, and finished with a three-coat fluoropolymer in Colonial Red. Downspouts are to be 2" by 3" rectangular, zinc-coated steel with the same finish. Premanufactured roof curbs must be at least 8 inches high, constructed of minimum 18-gauge zinc-coated steel, and match the roof's slope. Bids can be mailed, and at least one copy is required. No structural study has been conducted for a slanted roof, and as-built drawings are unavailable. The government will not accept TPO roofing material for low-slope sections, requiring adherence to the specified steel sheet panels.
Pre Bid Roster_0001.pdf
PDF493 KBSep 10, 2025
AI Summary
The document details a site visit for the 117th Air Refueling Wing's Building 391 Roof Replacement project. Facilitated by Mr. William Hall, the visit took place on August 19, 2025, at 10:00 AM in the CE Classroom, Building 700, located at 5401 East Lake Blvd. The document is a sign-in sheet for attendees, capturing their names, organizations, titles, phone numbers, and email addresses. This site visit is a crucial step in the federal government's procurement process for the roof replacement, allowing potential contractors to assess the project scope firsthand and ensuring transparency and proper engagement before bids are submitted.
Request for Information 3 Sep.pdf
PDF166 KBSep 10, 2025
AI Summary
The Department of the Air Force, 117th Air Refueling Wing, has issued clarifications regarding roofing, gutter, and downspout specifications for a project. Bidders must adhere to UFGS Division 7 – Thermal and Moisture Protection, Part 2.1.2 Steel Sheet Panels, in Colonial Red, for all roofing materials, including new gutters and downspouts. Gutters must be zinc-coated steel, 4.5 by 6 inches, with specific support and fabrication requirements. Downspouts are to be 2 by 3 inches, zinc-coated steel with a three-coat fluoropolymer finish matching the roof. Roof curbs must be 18-gauge galvanized steel, 8 inches high, with a level top surface. The government will not provide as-built drawings or accept alternative roofing materials like TPO for low-slope sections. No structural study has been conducted on the roof's capacity for additional weight. Contractors are responsible for assessing existing damage and proposed work must reflect these findings. Bids should include at least one copy and can be mailed. The project is not tax-exempt. One person can fulfill multiple roles (Forman/superintendent/safety officer) if qualified.
OF 1419.pdf
PDF290 KBSep 10, 2025
AI Summary
The "Abstract of Offers - Construction" document details the bids received for the BRKR25005 B391 Roof Replacement project, solicited under number W50S6M-25-B-012. Issued on August 7, 2025, and opened on September 9, 2025, the project received multiple offers. The government's estimated cost for the base bid was $218,052.47. Ten contractors submitted bids, ranging from $279,736.35 by KB Standard LLC to $1,000,000.00 by Premier Roofing of California. Other significant bidders included Arrowhead Contracting Inc. ($572,480.00), Lykos Industries LLC ($850,000.00), MB Design Consultants LLC ($696,936.00), Apex Constructors ($580,072.00), Martins Specialized Services ($557,431.00), and Unity & Alliant JV0-01 ($411,115.00). Most offers included a 20% bid security, with some noting 0%. The abstract was certified by William K Hall, Contracting Officer, on September 10, 2025.

Related Contract Opportunities

Project Timeline

postedOriginal Solicitation PostedJul 24, 2025
amendedAmendment #1· Description UpdatedAug 20, 2025
amendedAmendment #2· Description UpdatedAug 21, 2025
amendedAmendment #3· Description UpdatedAug 27, 2025
amendedAmendment #4· Description UpdatedAug 28, 2025
amendedAmendment #5· Description UpdatedSep 3, 2025
amendedLatest Amendment· Description UpdatedSep 10, 2025
deadlineResponse DeadlineSep 9, 2025
expiryArchive DateSep 24, 2025

Agency Information

Department
DEPT OF DEFENSE
Sub-Tier
DEPT OF THE ARMY
Office
W7MT USPFO ACTIVITY ALANG 117

Point of Contact

Name
William K. Hall

Place of Performance

Birmingham, Alabama, UNITED STATES

Official Sources