ContractPresolicitationTotal Small Business Set-Aside (FAR 19.5)

PRE-SOLICITATION NOTICE- Overhaul of B1 Torque tube assembly

DEPT OF DEFENSE FD20302600598-1
Response Deadline
Jun 1, 2026
12 days left
Days Remaining
12
Until deadline
Set-Aside
Total Small Business Set-Aside (FAR 19.5)
Notice Type
Presolicitation

Contract Opportunity Analysis

The Department of the Air Force, through Air Force Sustainment Center at Tinker AFB, is planning a firm-fixed-price IDIQ contract for the overhaul of B-1 Torque Tube Assemblies. The work covers all labor, facilities, equipment, and materials needed to disassemble, clean, inspect, rehabilitate, reassemble, and test the assemblies, including replacement of worn or damaged components to restore service life. The performance work statement adds requirements for pre-award surveys, initial production evaluations, quality control and inspection, parts control and obsolescence management, safety and IUID compliance, supply chain risk management, and surge capacity, with performance tied to S Coffeyville, Oklahoma and shipment to DLA Distribution Depot Oklahoma. This is contemplated as a total small business set-aside, qualification requirements apply with a Source Approval Request package for unqualified vendors, technical data is available with an approved DD Form 2345, and the solicitation is expected around June 3, 2026 with closing on July 3, 2026 and an estimated award date of August 10, 2026.

Classification Codes

NAICS Code
336413
Other Aircraft Parts and Auxiliary Equipment Manufacturing
PSC Code
J016
MAINT/REPAIR/REBUILD OF EQUIPMENT- AIRCRAFT COMPONENTS AND ACCESSORIES

Solicitation Documents

2 Files
FD20302600598 Pre-Solicitation.pdf
PDF137 KBMay 18, 2026
AI Summary
The United States Air Force Sustainment Center (AFSC) at Tinker AFB is planning a firm-fixed-price Indefinite Delivery Indefinite Quantity (IDIQ) contract for the overhaul of B-1 Torque Tube Assemblies (NSN: 1680-01-143-5429RK, P/N: NF53602-01B). This five-year base contract will cover labor, facilities, equipment, and materials for reworking, rehabilitating, or replacing worn components to restore the assemblies to their original life expectancy. The contract includes a basic estimated quantity of 36 units with a minimum of 5 and a maximum of 180 units. Delivery will be 5 units every 240 days initially, then 5 units every 45 days thereafter, shipped to DLA Distribution Depot Oklahoma. Qualification requirements apply, and interested vendors must submit a Source Approval Request (SAR) package. Technical data is available upon request with a current, approved DD Form 2345. A Small Business Set Aside Solicitation is contemplated. The solicitation is expected around June 3, 2026, with a closing date of July 3, 2026, and an estimated award date of August 10, 2026. This notice is not a formal request for proposal, and the government will not be using policies for the acquisition of commercial items. Vendors must specify their business size and U.S. or foreign ownership in their response. An Ombudsman is available for contractor concerns.
PWS.pdf
PDF1074 KBMay 18, 2026
AI Summary
This Performance Work Statement (PWS) outlines the overhaul requirements for a TORQUE TUBE ASSEMBLY (National Stock Number: 1680011435429RK, Part Number: NF53602-01B) for the Department of the Air Force. The work involves disassembly, cleaning, inspection, rehabilitation, reassembly, testing, and finishing to return the item to a like-new condition. Key requirements include pre-award surveys, initial production evaluations, comprehensive reporting, stringent quality control and inspection systems, and the management of special tools and test equipment. The PWS also details requirements for a parts control program, addressing obsolescence and diminishing manufacturing sources, and emphasizes compliance with safety, health, and item unique identification (IUID) standards. Furthermore, it includes provisions for surge capacity in national emergencies and a robust Supply Chain Risk Management (SCRM) plan covering continuity of operations, foreign influence, and cybersecurity protocols. The document specifies consumable parts for 100% replacement and outlines performance objectives and thresholds for quality, delivery, and reporting.

Related Contract Opportunities

Project Timeline

postedOriginal Solicitation PostedMay 18, 2026
deadlineResponse DeadlineJun 1, 2026
expiryArchive DateJun 16, 2026

Agency Information

Department
DEPT OF DEFENSE
Sub-Tier
DEPT OF THE AIR FORCE
Office
FA8118 AFSC PZABB

Point of Contact

Name
Mark Green

Place of Performance

S Coffeyville, Oklahoma, UNITED STATES

Official Sources