SOLICITATION: MISSISSIPPI RIVER BASIN, LOCK AND DAM 16, ILLINOIS CITY, IL, LOCK 16 FRP TAINTER VALVES
ID: W912EK24R0033Type: Solicitation
Overview

Buyer

DEPT OF DEFENSEDEPT OF THE ARMYW07V ENDIST ROCK ISLANDROCK ISLAND, IL, 61299-5001, USA

NAICS

All Other Plastics Product Manufacturing (326199)

PSC

PLASTICS FABRICATED MATERIALS (9330)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)
Timeline
    Description

    The Department of Defense, through the U.S. Army Corps of Engineers, is soliciting bids for the fabrication and installation of Fiber Reinforced Polymer (FRP) Tainter valves at Lock and Dam 16 in Illinois, under Solicitation No. W912EK24R0033. The project aims to enhance water regulation and navigation infrastructure by installing advanced FRP valves, which are critical for controlling water flow and maintaining operational efficiency at the lock. This procurement is a total small business set-aside, emphasizing the government's commitment to leveraging small businesses for specialized construction tasks, with proposals evaluated based on technical acceptance, past performance, and price. Interested contractors must submit their proposals by September 11, 2024, and can direct inquiries to Carrie Holub at carrie.l.holub@usace.army.mil or Jeffrey R. Voss at Jeffrey.R.Voss@usace.army.mil for further information.

    Files
    Title
    Posted
    The document outlines specifications and load calculations for the design of FRP tainter valves at Lock and Dam 16 in the Mississippi River Basin, governed by the U.S. Army Corps of Engineers. It includes a detailed loading diagram, illustrating various load combinations such as strength limit states and fatigue limit states relevant to different operational scenarios, including open and closed valve positions. The design philosophy adheres to allowable strength design principles to ensure that structures do not exceed specified stress limits. Key points highlight the importance of safety factors, with specific considerations for hydrodynamic and hydrostatic loads, as well as dead and frictional loads unique to the valve's operational context. The document serves as a technical guide for engineers involved in the project, emphasizing the critical nature of load calculations in maintaining functionality and safety of hydraulic structures. It is structured into sections, including general notes, loading diagrams, and load specifications, facilitating a comprehensive understanding of the design requirements necessary for federal compliance and operational efficiency in inland navigation.
    The document outlines specifications for the hydraulic steel structures to be utilized in the construction of FRP tainter valves at Lock and Dam 16 on the Mississippi River Basin. It details various loading diagrams and combinations related to the valves' structural integrity under different operational states, such as strength limit states with opened or closed valves, fatigue limit states, and others impacted by potential environmental factors like buoyancy and earthquake forces. The document indicates that the design must adhere to the Allowable Stress Design methodology to ensure safety and compliance with established limits. Key components include detailed numeric assessments of loads, locations for maximum shear and moment effects, and notes stipulating the weights and positions of operational machinery and forces. The solicitation, numbered W912EK24R0033, is issued by the U.S. Army Corps of Engineers, emphasizing the engineering requirements for the project in Rock Island, Illinois, set for August 2024.
    The document details Amendment 0001 to Solicitation W912EK24R0033 issued by the U.S. Army Corps of Engineers. It outlines modifications primarily to Sections 01 33 16 and 06 90 00, concerning updated design requirements and specifications for structures using Fiber Reinforced Polymer (FRP) composites. Notable changes include the deletion of pages from the specified sections and the introduction of revised pages. The amendment highlights essential design criteria, calculations, and operational maintenance provisions for the project, ensuring compliance with U.S. Army Corps of Engineers' standards, particularly focusing on structural stability and material specifications suitable for marine environments. The amendment also eliminates Clause 52.232-18 regarding the availability of funds, indicating a shift in funding strategy or management. Contractors must acknowledge receipt of this amendment to avoid jeopardizing their offers. This document is part of the procedural updates necessary for adherence to federal contracting requirements and reflects the commitment to high engineering and safety standards in government contracts.
    The government file pertains to Amendment 0002 of Solicitation W912EK24R0033 issued by the US Army Corps of Engineers. This amendment contains modifications to various sections, including 01 20 00, 01 33 16, 06 90 00, and 35 20 16, along with associated drawings. Key changes involve the complete replacement of specified pages with revised versions dated August 27, 2024, and the requirements for required documentation related to computational models and the delivery of FRP Tainter Valve structures. These modifications emphasize adherence to quality control, design standards, and environmental considerations in the production and assembly processes. Contractors must acknowledge receipt of this amendment and ensure compliance to avoid rejection of their offers. The amendment also details the payment structures tied to specific project tasks and lays out extensive requirements for design analysis, testing, and inspections, underscoring the project’s complexity and regulatory requisites. This document serves as a critical guide for contractors involved in the project, ensuring alignment with federal expectations and project specifications. Overall, it manifests the government's intent to maintain rigorous standards in engineering and construction efforts.
    The document details a Computational Fluid Dynamics (CFD) modeling study conducted for Lock and Dam 25, focusing on the floatation analysis of the Tainter valves during ice flushing operations. The Lock, operated by the US Army Corps of Engineers (USACE), faces challenges with valve closure due to hydrodynamic loading, particularly under high head differentials. The report outlines a thorough CFD modeling process using Star-CCM+ software to simulate flow patterns and validate results with real-time data collection from pressure sensors and Acoustic Doppler Current Profilers (ADCP). Key findings indicate significant hydrodynamic forces that can prevent the valves from closing, leading to potential operational risks. The analysis also addresses the role of friction from valve seals and trunnions, concluding that specific valve openings can generate moments capable of causing floatation. Recommendations include adjusting drag from seals, enhancing the bearing system to reduce friction, or modifying the valve's weight to mitigate floatation risks. The insights gained aim to inform improvements in valve operation for the new 1,200 ft navigation lock currently under construction, ensuring safety and efficiency in water regulation at Lock 25.
    The document appears to pertain to a Request for Proposal (RFP) related to the operation of an outrigger locking pin, potentially indicating a need for specialized equipment or services within a government or commercial context. Although specific details are sparse, the reference to a job code (JOBEX) and a contact number suggests a formal process for procurement or contracting. The project could involve maintaining or enhancing safety equipment or machinery critical for operations, possibly in sectors such as infrastructure, transportation, or defense. The structure of the document includes identifiers for tracking and communication, with an emphasis on operational processes. This type of RFP typically necessitates thorough evaluation of proposals to ensure they meet regulatory standards and operational requirements. Overall, the document highlights a technical requirement within a government framework that may impact safety and efficiency in relevant operations.
    The document outlines construction specifications and engineering plans for Lock and Dam No. 16 on the Mississippi River by the U.S. Army Corps of Engineers, dated December 1933. It details the structural design, including excavation depths, the use of steel piling, and the incorporation of riprap for stabilization. Various critical measurements such as elevation levels and station points are meticulously recorded for future reference. The plans emphasize the need for specific materials and construction techniques that ensure the robustness and longevity of the facility. Additionally, the document incorporates numerous updates and changes to previous designs, addressing structural reinforcement, placement of mooring hooks, and integration of water and gasoline lines, while adhering to safety and environmental regulations. This comprehensive framework not only serves as a blueprint for current construction endeavors but also reflects the broader goals of federal infrastructure projects aimed at enhancing waterway navigability and safety.
    The U.S. Army Corps of Engineers is soliciting bids for the fabrication of FRP (Fiber Reinforced Polymer) Tainter valves as part of a project at Lock and Dam 16 in Illinois, identified by Solicitation No. W912EK24R0033. This contract is a 100% small business set-aside, focusing on achieving the lowest price for technically acceptable proposals. The project involves multiple components, including valve design, Computational Fluid Dynamics (CFD) modeling, fabrication, and delivery. Interested contractors must demonstrate their technical qualifications and past performance in fabricating large FRP structures. Proposals will be evaluated based on three factors: Technical Acceptance, Past Performance, and Price, with a pass-fail basis for the first two and a rigorous verification of pricing. The schedule for submissions extends until September 11, 2024, with options available for additional fabrication work contingent upon the government's evaluation by August 2025. The project underscores the government's commitment to leveraging small businesses for specialized construction tasks, ensuring compliance with contract requirements and timely delivery.
    The document outlines the solicitation for the FRP Tainter Valves designed for Lock and Dam 16 on the Mississippi River, issued by the U.S. Army Corps of Engineers, Rock Island District. The project's main objective is to install advanced fiber reinforced polymer (FRP) Tainter valves, which are vital for regulating water flow and maintaining water levels at the lock. Key aspects include the detailed engineering drawings and specifications that cover various components such as valve assemblies, seals, and structural notes necessary for their installation. The document specifies contract details, approval signatures, and the materials required for construction, emphasizing compliance with engineering standards. It includes multiple detailed sheets, illustrating various aspects of the valve's design, like loading diagrams, seals, and installation instructions. The project's duration is anticipated to uphold the longevity and functionality of the valves, with maintenance recommendations documented to ensure their operational longevity. Overall, this solicitation highlights the Corps' commitment to enhancing water navigation infrastructure, thereby supporting regional transportation and flood management efforts.
    Similar Opportunities
    LMA RSW Replacement Fender
    Active
    Dept Of Defense
    The Department of Defense, through the U.S. Army Corps of Engineers (USACE), is soliciting proposals for the supply and delivery of two new marine leg fenders to replace damaged fenders at the Lower Monumental Lock and Dam in Washington. The procurement requires compliance with specific technical specifications to ensure the fenders' durability and performance under challenging conditions, including UV exposure and extreme temperatures, with detailed requirements regarding dimensions, material tensile strength, and energy absorption characteristics. This project is critical for maintaining the integrity of the dam's infrastructure and ensuring effective water management systems. Interested contractors must submit their proposals by 11:00 AM on September 20, 2024, and should contact Tiffany Chang at tiffany.chang@usace.army.mil or Tracy Gluck at Tracy.Gluck@usace.army.mil for further information.
    Replace Interlock Control Systems at Maxwell Locks & Dams
    Active
    Dept Of Defense
    The Department of Defense, specifically the U.S. Army Corps of Engineers Pittsburgh District, is seeking a contractor to replace the interlock control systems at Maxwell Locks and Dams located in East Millsboro, Pennsylvania. The project entails the procurement and installation of a new valve interlock control system that complies with the Inland Marine Transportation System (IMTS) Minimum Interlock Control Standard, including the installation of cables, limit switches, control panels, and necessary hydraulic equipment. This construction is critical for ensuring the operational safety and efficiency of the lock and dam facilities, which are staffed year-round by government personnel. The contract, valued between $1 million and $5 million, is set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) and is expected to be awarded as a Firm-Fixed-Price contract, with bids due following the issuance of the Invitation for Bid on or about September 23, 2024. Interested bidders should contact Michael Boyd at michael.w.boyd@usace.army.mil or Connie Ferguson at connie.l.ferguson@usace.army.mil for further details.
    WD Mayo Alignment Structure
    Active
    Dept Of Defense
    The U.S. Army Corps of Engineers – Tulsa District is seeking contractors for the design-build replacement of an alignment cell at WD Mayo Lock and Dam 14, located on the Arkansas River in Oklahoma. The project, which is estimated to cost between $5,000,000 and $10,000,000, will utilize Fiber Reinforced Polymer (FRP) materials and aims to enhance the structural integrity of the dam. Interested firms, including small businesses and historically underutilized groups, are encouraged to submit their qualifications, relevant experience, and bonding capabilities by September 30, 2024, with the anticipated solicitation date set for November 2025. For further inquiries, interested parties may contact Kordel Tyler at kordel.m.tyler@usace.army.mil or Shawn Adkins at SHAWN.A.ADKINS@USACE.ARMY.MIL.
    NESP Mooring Facilities at Lock & Dam 7 near La Crescent, MN
    Active
    Dept Of Defense
    The Department of the Army, through the U.S. Army Corps of Engineers, is soliciting bids for the construction of mooring facilities at Lock & Dam 7 in La Crescent, Minnesota, under Solicitation No. W912ES24B0013. The project aims to enhance navigation efficiency by constructing a mooring cell and a mooring dolphin, which includes tasks such as dredging, concrete fabrication, and structural metal work, adhering to strict federal standards for quality and environmental compliance. This initiative is part of the Navigation and Ecosystem Sustainability Program for the Mississippi River Basin, emphasizing the importance of maintaining navigational infrastructure while mitigating ecological impacts. Interested small businesses must submit their bids by September 17, 2024, at 2:00 PM Central Time, and can contact Justin H. Rose at justin.h.rose@usace.army.mil or 651-290-5422 for further information. The estimated contract value ranges from $5 million to $10 million.
    Green River Lock and Dam 1 Miter Gate Repair
    Active
    Dept Of Defense
    The Department of Defense, through the U.S. Army Corps of Engineers, is soliciting proposals for the repair of the Green River Lock and Dam 1 miter gates in Reed, Kentucky. This project aims to restore the functionality and safety of critical hydraulic structures, with an estimated cost range between $1,000,000 and $5,000,000. Contractors are required to adhere to specific construction methods, safety regulations, and environmental protection policies, while also ensuring compliance with binding rates from their existing contracts. Proposals are due by 10:00 AM Eastern Time on September 20, 2024, following a mandatory site visit on September 12, 2024. Interested parties should contact Maxwell Williams at maxwell.s.williams@usace.army.mil for further details.
    Waterway Sign Install at Meldahl Locks and Dam with an Option of Install at Greenup Locks and Dam.
    Active
    Dept Of Defense
    The Department of Defense, specifically the Department of the Army through the W072 Endist Huntington office, is soliciting bids for the installation of waterway signs at Meldahl Locks and Dam, with an option for installation at Greenup Locks and Dam. The procurement involves structural steel and precast concrete work, which is crucial for enhancing navigational safety and operational efficiency in these waterways. The solicitation has undergone amendments, with the latest revision setting the closing date for submissions to 5:00 PM EST on September 18, 2024. Interested contractors can reach out to Travis Daugherty at travis.r.daugherty@usace.army.mil or by phone at 304-399-5228 for further details.
    River Repairs and Upper Bank Paving SATOC
    Active
    Dept Of Defense
    The Department of Defense, through the U.S. Army Corps of Engineers Memphis District, is soliciting bids for the FY24 River Repairs and Upper Bank Paving project, designated as W912EQ24B0008. This firm-fixed price contract is specifically set aside for Women-Owned Small Businesses (WOSB) and involves extensive stone repairs on navigation structures along the Ohio and Mississippi Rivers, including the placement of riprap and other related tasks. The project is significant for maintaining critical infrastructure and ensuring navigational safety, with approximately 2.5 million tons of stone to be organized over four ordering periods. Bidders must submit their proposals by September 20, 2024, at 10:00 AM (CDT), with the bid opening scheduled for the same day at 1:00 PM (CDT). For further inquiries, interested parties can contact Jessica Lurry at jessica.m.lurry@usace.army.mil or Monica Moody at monica.a.moody@usace.army.mil.
    Summersville Dam Butterfly Valve Prep and Paint
    Active
    Dept Of Defense
    The Department of Defense, through the Department of the Army, is soliciting bids for the preparation and painting of the butterfly valve at the Summersville Dam. This project falls under the category of Other Heavy and Civil Engineering Construction, and it is designated as a Total Small Business Set-Aside, encouraging participation from small businesses. The work is critical for maintaining the operational integrity and longevity of the dam's infrastructure. Interested contractors can reach out to Robert Kinzel at robert.d.kinzel@usace.army.mil or by phone at 304-399-5341 for further details, as the complete project description is available in the attached documents.
    Chicago Harbor Lock Control Stands Rehab
    Active
    Dept Of Defense
    The Department of Defense, through the Army Corps of Engineers, is soliciting bids for the rehabilitation of the Chicago Harbor Lock Control Stands and associated maintenance facilities. The project involves restoring the exterior and interiors of four control stands and one maintenance shop/tool room located at 108 N Streeter Dr, Chicago, IL 60611. This work is crucial for maintaining the operational integrity and safety of the Chicago Harbor Lock, which plays a vital role in regional waterway management. Interested small businesses are encouraged to reach out to Kyle Smith at kyle.d.smith@usace.army.mil or call 312-846-5370 for further details, as this opportunity is set aside for total small business participation under FAR 19.5.
    Lock and Dam 25 New 1,200 ft Lock - Navigation and Ecosystem Sustainability Program
    Active
    Dept Of Defense
    Presolicitation DEPT OF DEFENSE DEPT OF THE ARMY is seeking construction services for Lock & Dam 25 New 1,200 ft Lock in MO, USA. The purpose of the project is to improve the existing lock and dam infrastructure. The government is pursuing an Early Contractor Involvement (ECI) via Integrated Design and Construction (IDaC) delivery method. The project includes a Draft Request for Proposal (RFP) and a Pre-Solicitation Conference to update industry on the design efforts and delivery method.