Y--CAPE COD NS - NELLIE ROAD COMBINED SEPTIC SYSTEM
Contract Opportunity Analysis
The National Park Service, within the Department of the Interior, is seeking proposals for a construction project at Cape Cod National Seashore in Wellfleet, Massachusetts to combine septic systems serving multiple dwellings at Nellie Road. The work includes demolition, excavation, installation of septic tanks, piping, effluent pump assemblies, electrical connections, grading, site restoration, and related labor, materials, permits, and equipment, with options for additional dwellings and possible road repair. The project requires compliance with the specifications and drawings, a Massachusetts-licensed Sanitarian or Engineer, a prior Ground Penetrating Radar survey before excavation, and attention to environmental and seasonal work restrictions. The period of performance runs from June 1, 2026, to February 28, 2027, the estimated magnitude is between $250,000 and $500,000, and an organized site visit was held on April 16, 2026, with acknowledgment of amendment receipt required for the offer.