The National Park Service, within the Department of the Interior, is seeking proposals for a construction project at Cape Cod National Seashore in Wellfleet, Massachusetts to combine septic systems serving multiple dwellings at Nellie Road. The work includes demolition, excavation, installation of septic tanks, piping, effluent pump assemblies, electrical connections, grading, site restoration, and related labor, materials, permits, and equipment, with options for additional dwellings and possible road repair. The project requires compliance with the specifications and drawings, a Massachusetts-licensed Sanitarian or Engineer, a prior Ground Penetrating Radar survey before excavation, and attention to environmental and seasonal work restrictions. The period of performance runs from June 1, 2026, to February 28, 2027, the estimated magnitude is between $250,000 and $500,000, and an organized site visit was held on April 16, 2026, with acknowledgment of amendment receipt required for the offer.

Classification Codes

NAICS Code
237110
Water and Sewer Line and Related Structures Construction
PSC Code
Y1EZ
CONSTRUCTION OF OTHER INDUSTRIAL BUILDINGS

Solicitation Documents

6 Files
Sol_140P4326R0011.pdf
PDF1601 KBApr 22, 2026
AI Summary
The National Park Service (NPS) is seeking proposals for a construction project at Cape Cod National Seashore in Wellfleet, Massachusetts. This Request for Proposal (RFP) (Solicitation No. 140P4326R0011) outlines the requirement to combine septic systems for multiple dwellings, including option line items for additional dwellings and road repair. The estimated project cost is between $250,000 and $500,000. Key dates include an organized site visit on April 16, 2026, and a performance completion date of February 28, 2027. The contract emphasizes strict adherence to specifications, drawings, and various federal acquisition regulations concerning inspection, suspension of work, contractor performance assessment, electronic invoicing via IPP, and prohibitions against certain telecommunications and IT hardware/software. The contractor must provide key personnel and adhere to strict timelines.
B08_Solicitation_Attachment_1_Specifications.pdf
PDF1535 KBApr 22, 2026
AI Summary
The National Park Service (NPS) is soliciting proposals for the Nellie Road Combined Septic Systems project in Wellfleet, MA. This project involves the construction of a new combined septic system to serve multiple dwellings at Cape Cod National Seashore, replacing existing individual systems. The scope of work includes demolition, excavation, installation of septic tanks, piping, effluent pump assemblies, electrical connections, grading, and site restoration. Key considerations include environmental protections for Eastern Box Turtles, bats, and migratory birds, with seasonal work restrictions from Memorial Day through September. The project offers a base bid for Dwellings 2 and 3, with options to include Dwellings 1 and 4, and an option for trench repair across Nellie Road if required. The contractor is responsible for all permits, coordination with a Massachusetts-licensed Sanitarian or Engineer, and adherence to various project management, safety, and quality requirements, including a Ground Penetrating Radar (GPR) survey before excavation.
Sol_140P4326R0011_Amd_0001.pdf
PDF396 KBApr 22, 2026
AI Summary
Amendment 0001 to Solicitation Number 140P4326R0011 for the Nellie Road Combined Septic System at Cape Cod National Seashore addresses contractor inquiries and provides a list of attendees from the pre-bid site visit held on April 16, 2026. Key questions answered include the designated laydown area, which is confined to the Contract Limits of Disturbance, and specific requirements for tree protection, which will follow Detail 8 on Drawing C6 and Section 31 20 00. The amendment clarifies that acknowledgment of receipt is required by completing items 8 and 15, returning copies, acknowledging on each offer copy, or by separate communication. Failure to acknowledge receipt prior to the specified hour and date may result in rejection of the offer. The period of performance for this project is from June 1, 2026, to February 28, 2027.
B08_Solicitation_Attachment_2_Drawings.pdf
PDF5663 KBApr 22, 2026
AI Summary
The document outlines the design and general notes for a combined septic system at 95 Ocean View Road, 355 Nellie Road, and 360 Nellie Road in Wellfleet, MA. It covers contact numbers for emergencies and utilities, along with general and utility notes detailing contractor responsibilities for coordination, utility maintenance, adherence to federal, state, and local regulations (including Massachusetts Title V), and safety protocols. The contractor must secure all necessary permits and inspections, maintain record drawings, dispose of construction debris off-site, control noise, and restore disturbed areas. The document also specifies construction and material notes, applicable codes (2021 International Mechanical Code, 2021 International Plumbing Code, 2020 National Electrical Code NFPA 70), vehicle access requirements for cleanliness, spill prevention and response procedures, and detailed erosion and sediment control measures. Demolition notes emphasize safety, dust control, and proper debris disposal. The site plan includes proposed septic tank and leachfield designs, design calculations for flow and field sizing for four dwellings, and a requested variance for setback distances from a water supply well.
B08_Solicitation_Attachment_3_DOL_Wage_Determination_MA20260008_1_2_2026.pdf
PDF5024 KBApr 22, 2026
AI Summary
This document, General Decision Number MA20260008, outlines prevailing wage rates and fringe benefits for various construction trades in Massachusetts, specifically for Heavy and Marine Construction Projects across Barnstable, Bristol, Dukes, Essex, Middlesex, Nantucket, Norfolk, Plymouth, and Suffolk Counties. It details hourly rates and fringes for boilermakers, bricklayers, cement masons, marble and tile finishers, terrazzo workers, piledrivers, carpenters, millwrights, electricians, power equipment operators, ironworkers, laborers (including classifications for hazardous waste and tunnel work), wrecking laborers, painters, plumbers, pipefitters, steamfitters, and truck drivers. The document also includes information on paid holidays, vacation time, and references Executive Orders 13706 and 13658 regarding paid sick leave and minimum wage for federal contractors. It further explains the identifiers for union, union average, survey, and state-adopted wage rates, and provides a comprehensive appeals process for wage determinations.
B08_Solicitation_Attachment_4_Construction_Contract_Administration.docx
Word22 KBApr 22, 2026
AI Summary
FAR 36.211(b) mandates that federal agencies detail their procedures for definitizing equitable adjustments in construction contract change orders and report on the time taken for these definitizations. This information is accessible via the Department of the Interior's acquisition policy website, serving to standardize and ensure transparency in managing contract modifications within federal construction projects.

Related Contract Opportunities

Project Timeline

postedOriginal Solicitation PostedApr 2, 2026
amendedLatest Amendment· Description UpdatedApr 22, 2026
deadlineResponse DeadlineMay 1, 2026
expiryArchive DateMay 16, 2026

Agency Information

Department
INTERIOR, DEPARTMENT OF THE
Sub-Tier
NATIONAL PARK SERVICE
Office
NER SERVICES MABO (43000)

Point of Contact

Name
Albright, Jason

Place of Performance

Wellfleet, Massachusetts, UNITED STATES
360 Nellie Road

Official Sources