ContractCombined Synopsis/SolicitationTotal Small Business Set-Aside (FAR 19.5)

OEM SALWICO CONSILIUM Fire Alarm Panel and Associated Installation Services

DEPARTMENT OF HOMELAND SECURITY 52000RFQ260024349
Response Deadline
May 13, 2026
5 days left
Days Remaining
5
Until deadline
Set-Aside
Total Small Business Set-Aside (FAR 19.5)
Notice Type
Combined Synopsis/Solicitation

Contract Opportunity Analysis

The U.S. Coast Guard Surface Forces Logistics Center is seeking a firm-fixed-price quotation for a brand-name-only replacement of the fire alarm control panel and associated installation services on the USCGC Charles Sexton in Key West, Florida. The work includes removing the obsolete Mircom PRO-2000XS panel, furnishing and installing the Salwico Consilium Model 5831813-00A panel, and supporting the installation with necessary labor, materials, equipment, a qualified technical representative, testing, and documentation. The requirement calls for an authorized Salwico Consilium dealer, no equal or alternate product, development of an installation plan, and delivery of draft and final drawings, parts lists, and testing records; base access is required and on-site work is limited to 11 calendar days within the performance window of May 18, 2026 to August 7, 2026. Quotes must be emailed by 4:00 p.m. Eastern on May 13, 2026, and vendors must be registered in SAM, with quotes sent to Jacqueline D. Handley and copied to Patricia Fremming.

Classification Codes

NAICS Code
238210
Electrical Contractors and Other Wiring Installation Contractors
PSC Code
R425
SUPPORT- PROFESSIONAL: ENGINEERING/TECHNICAL

Solicitation Documents

1 Files
SOW - Salwico Consilium Fire Alarm Panel Installation - CGC Charles Sexton DISCREP (Rev-0 07May26).docx
Word81 KBMay 8, 2026
AI Summary
The U.S. Coast Guard Surface Forces Logistics Center (USCG-SFLC) requires a contractor to replace an obsolete Mircom PRO-2000XS Fire Alarm Panel (FAP) with a Salwico Consilium Model 5831813-00A FAP on the USCGC Charles Sexton (WPC-1108) in Key West, FL. The Mircom FAP is no longer supported, rendering the vessel without an operational fire detection system in case of failure. The contractor will provide all necessary personnel, labor, materials, and equipment, including a qualified Technical Representative familiar with the Salwico Consilium system. Tasks include developing an installation plan, removing the old FAP and associated components, installing the new FAP, and testing the system. Deliverables include a draft installation drawing/plan and a final package with all finalized drawings, parts lists, and testing documents. The period of performance is from May 18, 2026, to August 7, 2026, with on-site work not exceeding 11 calendar days between July 27 and August 7, 2026. Base access is required.

Related Contract Opportunities

Project Timeline

postedOriginal Solicitation PostedMay 8, 2026
deadlineResponse DeadlineMay 13, 2026
expiryArchive DateMay 28, 2026

Agency Information

Department
DEPARTMENT OF HOMELAND SECURITY
Sub-Tier
US COAST GUARD
Office
SFLC PROCUREMENT BRANCH 1(00080)

Point of Contact

Name
Jacqueline D. Handley

Place of Performance

Key West, Florida, UNITED STATES

Official Sources