Bldg 840 Chiller Replacement
Contract Opportunity Analysis
The Department of the Air Force, through the 366 CONS PKP at Mountain Home Air Force Base, is seeking a total small business set-aside construction contract to replace the Building 840 chiller and add a buffer tank. The work includes providing all labor, materials, services, oversight, and direction to remove the existing 90-ton chiller, install a new 90-ton chiller and 500-gallon buffer tank, build a new concrete pad, and integrate the system with the building automation controls. The project is design-build in nature, has a 90-calendar-day period of performance after notice to proceed, and requires compliance with federal, state, and local construction standards, environmental controls, hazardous materials procedures, and related submittals, with past performance references and performance/payment bond requirements also identified. An optional site visit is scheduled for May 28, 2026, questions are due by June 4, 2026, and proposals are due by June 18, 2026, with questions directed to the listed Air Force contacts.