Single-Module Prefabricated Housing in Yongsan Embassy Housing

DEPARTMENT OF STATE 19KS7026Q0022-P0001
Response Deadline
Jun 4, 2026
15 days left
Days Remaining
15
Until deadline
Set-Aside
Full & Open
Notice Type
Solicitation

Contract Opportunity Analysis

The U.S. Embassy Seoul, under the State Department, is soliciting quotations for single-module prefabricated housing for Yongsan Embassy Housing in Seoul, South Korea. The work covers contractor design and construction of a prefabricated structure, with clarifications allowing light-gauge steel framing and, with OBO SME approval, wooden construction, while restrooms are excluded from scope. The design must provide at least 90 square meters of continuous open interior space with a minimum 3-meter clear ceiling height, and the project will follow both U.S. and Korean standards, with the more stringent requirement controlling where they conflict. The 30% design submission must include all discipline drawings, the 180-day completion period includes design and construction but not U.S. Government review time, and primary-side power cable and underground conduit installation are excluded. Questions and submissions are associated with RFQ 19KS7026Q0022, with Tina Wong and Wonyoung Seo listed as points of contact at seoulproposals@state.gov and SeoWY@state.gov.

Classification Codes

NAICS Code
321992
Prefabricated Wood Building Manufacturing
PSC Code
5410
PREFABRICATED AND PORTABLE BUILDINGS

Solicitation Documents

1 Files
Amendment No.0001 to RFQ 19KS7026Q0022.docx
Word410 KBMay 20, 2026
AI Summary
The Request for Quotation (RFQ) No. 19KS7026Q0022 addresses questions and answers regarding the Single-Module Prefabricated Housing in Yongsan Embassy Housing. Key clarifications include the acceptability of light-gauge steel framing and, with OBO SME team approval, wooden construction, allowing for factory prefabrication. Restrooms are not within the scope, and the 30% design submission must encompass all discipline drawings, not just floor plans. The minimum interior floor area is 90m² or larger, with a minimum clear interior ceiling height of 3 meters. Exterior dimensions can exceed drawings if the 90m² interior is maintained. The interior space is a continuous open area with a designated free-weight zone. U.S. and Korean standards apply, with the more stringent code governing conflicts. Domestic Korean products are acceptable for electrical and fire safety equipment, and there is no approved vendor list. The 180-day completion period includes contractor design and construction, excluding U.S. Government review periods. There are no restrictions on maximum building area, and site topography is flat. Primary-side power cable and underground conduit installation are excluded from the contract scope. Window layouts and roof finishing materials are to be proposed during the design phase. Alternative structural systems will not be disadvantaged if OBO SME criteria are met.

Related Contract Opportunities

Project Timeline

postedOriginal Solicitation PostedMay 20, 2026
deadlineResponse DeadlineJun 4, 2026
expiryArchive DateJun 4, 2026

Agency Information

Department
DEPARTMENT OF STATE
Sub-Tier
STATE, DEPARTMENT OF
Office
US EMBASSY SEOUL

Point of Contact

Name
Tina Wong

Place of Performance

Seoul, Seoul, KOREA, SOUTH

Official Sources