USNS SHEPARD Sims Firemain Pump Overhaul
Contract Opportunity Analysis
The Department of the Navy’s Military Sealift Command is soliciting a firm-fixed-price effort to overhaul and rebuild the firemain charging pump and motor removed from USNS SHEPARD (T-AKE 3). The work calls for disassembly, cleaning, reassembly with new parts, dynamic balancing of the rotating assembly, and delivery of the completed unit after overhaul. Because the pump is a critical safety item, the requirement emphasizes detailed technical compliance, inspection, acceptance, and heightened quality assurance, with Sims Pump and Valve identified as the OEM and sole responsible source in the supporting justification. The period of performance runs from July 6 to September 30, 2026, and the crated unit is to be shipped to MSC Norfolk Warehouse W143 in Norfolk, Virginia, with payment through Wide Area WorkFlow.