ContractSources SoughtTotal Small Business Set-Aside (FAR 19.5)

Design and Build Repair Facade and Roof B707

DEPT OF DEFENSE 934CONF-26-0001
Response Deadline
Jan 6, 2026
Deadline passed
Days Remaining
0
Closed
Set-Aside
Total Small Business Set-Aside (FAR 19.5)
Notice Type
Sources Sought

Contract Opportunity Analysis

The Department of Defense, specifically the Air Force Reserve Command at the 934th Minneapolis Air Reserve Station, is seeking qualified contractors for a Design-Build project focused on the repair of the façade and roof of Building 707, a 299-room lodging facility. The project entails comprehensive professional design services, including field investigations, design document preparation, and construction monitoring, with responsibilities for all supervision, labor, materials, and equipment necessary to fulfill the requirements outlined in the Statement of Work. This initiative is critical for maintaining the structural integrity and safety of the facility, which has experienced issues such as leaking skylights and façade failures, necessitating repairs to both the exterior and interior elements. Interested vendors must submit a capabilities statement by January 5, 2026, to Chin Kuk Dahlquist at chin.kuk.dahlquist.1@us.af.mil, with the anticipated contract value ranging between $1 million and $5 million and a performance period of 405 days.

Classification Codes

NAICS Code
236220
Commercial and Institutional Building Construction
PSC Code
Z2JZ
REPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS

Solicitation Documents

1 Files
QJKL 24-0014 Statement of Work.pdf
PDF216 KBDec 10, 2025
AI Summary
This Statement of Work (SOW) outlines the requirements for the “REPAIR FAÇADE AND ROOF B707” project at the Minneapolis Air Reserve Station, a 299-room hotel. The project involves professional design services (Title I Type A, Title I Type B, and Title II Services), encompassing field investigations, design document preparation, and construction monitoring. The contractor is responsible for all supervision, labor, materials, and equipment. The scope includes replacing the roof, repairing skylights, brick façades, masonry joints, aluminum window trim, metal panel joints, and brick control joints. Additionally, there are several bid options for interior repairs (carpeting, sheetrock, popcorn ceilings, wainscoting, stairwell railing, lobby paint), parking lot repairs, and elevator fire sprinkler/alarm changes. The project has a performance period of 405 days, with 182 days for the design phase and 223 for construction. Adherence to Unified Facilities Criteria (UFC), Air Force policies, national codes, and environmental regulations is mandatory.

Related Contract Opportunities

Project Timeline

postedOriginal Solicitation PostedDec 10, 2025
deadlineResponse DeadlineJan 6, 2026
expiryArchive DateJan 21, 2026

Agency Information

Department
DEPT OF DEFENSE
Sub-Tier
DEPT OF THE AIR FORCE
Office
FA6633 934 AW PK

Point of Contact

Name
Chin Kuk Dahlquist

Place of Performance

Minneapolis, Minnesota, UNITED STATES

Official Sources