ContractSpecial Notice

FY26 anticipated levee work requirements within the Mississippi Valley Division (MVD) in the Memphis (W912EQ), Vicksburg (W912EE), and New Orleans (W912P8) Districts

DEPT OF DEFENSE W912MVD260002
Response Deadline
Sep 30, 2026
181 days left
Days Remaining
181
Until deadline
Set-Aside
Full & Open
Notice Type
Special Notice

Contract Opportunity Analysis

The Department of Defense, through the U.S. Army Corps of Engineers, is anticipating levee work requirements within the Mississippi Valley Division (MVD) for Fiscal Year 2026, specifically in the Memphis, Vicksburg, and New Orleans Districts. The procurement will involve various construction activities, including earthen levee embankment enlargement and repair, seepage berm and cut-off construction, and installation of groundwater relief wells, primarily along the Mississippi River levee system. This initiative is part of a broader infrastructure improvement effort, with numerous projects already underway or proposed, emphasizing the importance of flood risk management in the region. Interested contractors can reach out to primary contact Joelle Handy at joelle.f.handy@usace.army.mil or secondary contact Jason M. Carlock at jason.m.carlock@usace.army.mil for further details.

Classification Codes

NAICS Code
23799
Other Heavy and Civil Engineering Construction
PSC Code
Y1PZ
CONSTRUCTION OF OTHER NON-BUILDING FACILITIES

Solicitation Documents

1 Files
Levee_Chart_FY26.pdf
PDF188 KBNov 6, 2025
AI Summary
The U.S. Army Corps of Engineers, Mississippi Valley Division (MVD), is undertaking numerous levee and floodwall projects by October 2025. This document outlines "Proposed Work," "Under Construction," and "Ongoing Awarded" projects across various locations, including Caruthersville, MO, St. Rose, Helena, AR, and Cairo, IL. Projects range from floodwall replacements, levee enlargements, gravity flow structure improvements, and pump station renovations to levee slide repairs and gravel resurfacing. Many projects are intended for award under Multiple Award Task Order Contracts (MATOC/SATOC). The listed projects have varying lengths, from 0.14 miles to 12 miles, and estimated costs ranging from $0-5M to $25-100M. The MVD emphasizes that all project information is subject to change as designs are refined and impacts quantified, indicating a dynamic and extensive infrastructure improvement initiative.

Related Contract Opportunities

Project Timeline

postedOriginal Solicitation PostedNov 6, 2025
deadlineResponse DeadlineSep 30, 2026
expiryArchive DateOct 15, 2026

Agency Information

Department
DEPT OF DEFENSE
Sub-Tier
DEPT OF THE ARMY
Office
W07V ENDIST VICKSBURG

Point of Contact

Name
Joelle Handy

Place of Performance

UNITED STATES

Official Sources